[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-937631":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},937631,605,2,"多选题","下列关于室内外消火栓系统管道安装的描述中不正确的是（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","室外消火栓系统管道在焊接后应清除接口处的浮锈、污垢及油脂",true,{"key":16,"text":17,"correct":14},"B","室外消火栓安装前，管件内外壁均涂沥青冷底子1遍，外壁需另加热沥青2遍、面漆2遍",{"key":19,"text":20,"correct":21},"C","室内消火栓管道穿梁及地下室剪力墙、水池等，应在预埋金属管中穿过",false,{"key":23,"text":24,"correct":14},"D","水压强度试验的测试点应设在系统管网的最高点",{"key":26,"text":27,"correct":14},"E","室内消火栓系统管井的消防立管安装采用从上到下的安装方法","ABDE","2020新教材P183 选项A，室外消火栓系统管道在焊接前应清除接口处的浮锈、污垢及油脂，而不是焊接后，故A错误。选项B，室外消火栓安装前，管件内外壁均涂沥青冷底子油2遍，外壁需另加热沥青2遍、面漆1遍，故B错误。选项C，室内消火栓管道梁及地下室剪刀墙、水池等，应在预埋金属管中过，故C正确。选项D，水压强度试验的测试点应设在系统管网的最低点，故D错误。选项E，管井的消防立管安装采用从下至上的安装方法，即管道从管井底部逐层驳接安装，直至立管全部安装完，并且固定至各层支架上。而不是从上到下，故E错误。",{"id":6,"name":31,"category":32,"favorite":33},"消防技术综合能力(一级、二级)","建筑工程",0]