[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-937473":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},937473,605,1,"单选题","消防给水管网施工完成后，要进行试压和冲洗。系统试压前选用试压用的压力表不少于2只，精度不低于1.5级，量程为试验压力值的（ ）倍。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","0.5～1.0",false,{"key":16,"text":17,"correct":14},"B","1.0～1.5",{"key":19,"text":20,"correct":21},"C","1.5～2.0",true,{"key":23,"text":24,"correct":14},"D","2.0～2.5","2020新教材P169 消防给水系统，试压前选用试压用的压力表不少于2只，精度不低于1.5级，量程为试验压力值的1.5～2.0倍。",{"id":6,"name":27,"category":28,"favorite":29},"消防技术综合能力(一级、二级)","建筑工程",0]