[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-937151":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},937151,605,1,"单选题","对某建筑内设置的防烟排烟系统风机进行检查，下列检查结果中，不符合规范要求的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","送风机外壳至墙壁或其他设备的距离为650mm",false,{"key":16,"text":17,"correct":14},"B","手动开启送风机，风机能正常运转2.0h",{"key":19,"text":20,"correct":21},"C","送风机设在混凝土基础上，并设置有弹簧减振装置",true,{"key":23,"text":24,"correct":14},"D","送风机的进风口设置在排烟出口的下方，两者边缘的垂直距离8.0m","2020新教材P359 风机外壳至墙壁或其他设备的距离不应小于600mm，A选项正确；根据7.2.5-1，手动开启风机，风机应正常运转2.0h，B选项正确；根据6.5.3，风机应设在混凝土或钢架基础上，且不应设置减振装置，C选项错误；根据3.3.5-3，竖向布置时，送风机的进风口应设置在排烟出口的下方，其两者边缘最小垂直距离不应小于6.0m，水平布置时，两者边缘最小水平距离不应小于20.0m，D选项正确。",{"id":6,"name":27,"category":28,"favorite":29},"消防技术综合能力(一级、二级)","建筑工程",0]