[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-937025":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},937025,605,1,"单选题","建筑灭火器配置验收按照单栋建筑独立验收，局部验收按照规定要求申报。各验收子项目缺陷划分为严重缺陷项 A、重缺陷项 B、和轻缺陷项 C、灭火器配置验收的合格判定条件为（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","A=0，且B≤2，且B+C≤6为合格",false,{"key":16,"text":17,"correct":14},"B","A=0，且B≤1，且B+C≤6为合格",{"key":19,"text":20,"correct":14},"C","A=0，且B≤2，且B+C≤4为合格",{"key":22,"text":23,"correct":24},"D","A=0，且B≤1，且B+C≤4为合格",true,"GB 50444-2008 建筑灭火器配置验收及检查规范 4.3.2：“灭火器配置验收的判定规则应符合下列要求：1缺陷项目应按本规范附录B的规定划分为：严重缺陷项A.、重缺陷项B.和轻缺陷项C。2合格判定条件应为：A=0，且B≤1，且B+C≤4，否则为不合格”，故D正确。",{"id":6,"name":27,"category":28,"favorite":29},"消防技术综合能力(一级、二级)","建筑工程",0]