[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-936880":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},936880,605,1,"单选题","消防应急电源调试中，切断应急电源应急输出时直接启动设备的连线，接通应急电源的主电源。将应急电源接上等效于满负载的模拟负载，使其处于应急工作状态，应急工作时间应大于设计应急工作时间的（ ）倍，且不小于产品标称的应急工作时间。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","1.0",false,{"key":16,"text":17,"correct":18},"B","1.5",true,{"key":20,"text":21,"correct":14},"C","2.0",{"key":23,"text":24,"correct":14},"D","2.5","将应急电源接上等效于满负载的模拟负载，使其处于应急工作状态，应急工作时间应大于设计应急工作时间的1.5倍，且不小于产品标称的应急工作时间。",{"id":6,"name":27,"category":28,"favorite":29},"消防技术综合能力(一级、二级)","建筑工程",0]