[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-936466":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},936466,605,1,"单选题","2018 年某城市的消防远程监控系统正式建成,在其投入使用前需要对系统及系统组件进行调试。系统在各项功能调试后进行试运行,试运行时间不少于（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","15 天",false,{"key":16,"text":17,"correct":14},"B","20 天",{"key":19,"text":20,"correct":21},"C","30 天",true,{"key":23,"text":24,"correct":14},"D","40 天","城市消防远程监控系统正式投入使用前，应对系统及系统组件进行调试。系统在各项功能 调试后进行试运行，试运行时间不少于 1 个月 。 系统的设计文件和调试记录等文件要形成技术文档，存储备查。",{"id":6,"name":27,"category":28,"favorite":29},"消防技术综合能力(一级、二级)","建筑工程",0]