[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-936460":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},936460,605,2,"多选题","火灾自动报警系统调试结束后应编写调试报告，施工单位、设备制造企业应向建设单位提交（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","系统竣工图",true,{"key":16,"text":17,"correct":14},"B","材料设备及配件进场检查记录",{"key":19,"text":20,"correct":14},"C","安装质量检查记录",{"key":22,"text":23,"correct":24},"D","系统设施维护记录表",false,{"key":26,"text":27,"correct":24},"E","施工现场质量管理检查记录","ABC","根据《火灾自动报警系统施工及验收规范》GB 50166—2019 2.1.5-7，火 7 系统调试结束后应编写调试报告，施工单位、设备制造企业应向建设单位提交系统竣工图、材料设备及配件进场检查记录、安装质量检查记录、调试记录及品检验报告、合格证等相关材料 本题答案为ABC。",{"id":6,"name":31,"category":32,"favorite":33},"消防技术综合能力(一级、二级)","建筑工程",0]