[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-936222":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},936222,605,1,"单选题","干粉灭火系统管网试压和吹扫中，当水压强度试验条件不具备时，可采用气压强度试验代替。气压强度试验压力取（）倍系统最大工作压力。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","1．05",false,{"key":16,"text":17,"correct":14},"B","1．10",{"key":19,"text":20,"correct":21},"C","1．15",true,{"key":23,"text":24,"correct":14},"D","1．20","干粉灭火系统气压强度试验压力取1．15倍系统最大工作压力。",{"id":6,"name":27,"category":28,"favorite":29},"消防技术综合能力(一级、二级)","建筑工程",0]