[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-936182":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},936182,605,1,"单选题","泡沫灭火系统管道安装完毕应进行水压试验，下列说法不符合规范要求的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","试验宜采用清水进行，试验时，环境温度不应低于5℃",false,{"key":16,"text":17,"correct":14},"B","试验压力应为设计压力的1．5倍",{"key":19,"text":20,"correct":21},"C","试验前应将泡沫产生装置、泡沫比例混合器（装置）安装调试合格后，一并参加试验",true,{"key":23,"text":24,"correct":14},"D","当环境温度低于5℃时，应采取防冻措施","根据《泡沫灭火系统施工及验收规范》GB 50281—20065．5．1—7，管道安装完毕应进行水压试验，并应符合下列规定：1）试验宜采用清水进行，试验时，环境温度不应低于5℃，当环境温度低于5℃时，应采取防冻措施；2）试验压力应为设计压力的1．5倍；3）试验前应将泡沫产生装置、泡沫比例混合器（装置）隔离。本题答案为C。",{"id":6,"name":27,"category":28,"favorite":29},"消防技术综合能力(一级、二级)","建筑工程",0]