[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-935973":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},935973,605,1,"单选题","某施工单位对新进场的800只闭式喷头进行密封性能试验，下列做法中错误的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","随机抽取8只喷头进行试验",false,{"key":16,"text":17,"correct":14},"B","试验压力为3MPa",{"key":19,"text":20,"correct":14},"C","试验保压时间为4min",{"key":22,"text":23,"correct":24},"D","当有两只喷头不合格时，应再抽查16只喷头进行试验",true,"根据《自动喷水灭火系统施工及验收规范》GB 50261—20173．2．7—5，试验数量宜从每批中抽查1％，但并不得少于5只，试验压力应为3．0MPa；保压时间不得少于3min。当两只及两只以上不合格时，不得使用该批喷头。当仅有一只不合格时，应再抽查2％，并不得少于10只，并重新进行密封性能试验；当仍有不合格时，亦不得使用该批喷头。当有两只喷头不合格时，则该批喷头不得使用，而无需再进行抽查试验，D选项错误，本题答案为D。",{"id":6,"name":27,"category":28,"favorite":29},"消防技术综合能力(一级、二级)","建筑工程",0]