[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-935108":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},935108,605,1,"单选题","（2019年真题）对某建筑高度为110m的写字楼设置的机械加压送风系统进行检查时，下列系统送风口风压测试的做法，符合现行国家标准《建筑防排烟系统技术标准》(GB51251)要求的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","选择第十五层避难层的机械加压送风系统，测试风口的风压值",true,{"key":16,"text":17,"correct":18},"B","选择送风系统首端对应的3个连续楼层的楼梯间及前室，测试风口的风压值",false,{"key":20,"text":21,"correct":18},"C","选择送风系统末端对应的1个楼层的楼梯间及前室，测试风口的风压值",{"key":23,"text":24,"correct":18},"D","选择送风系统中段对应的2个连续楼层的楼梯间及前室，测试风口的风压值","根据《建筑防烟排烟系统技术标准》第7.2.6条规定，机械加压送风系统风速及余压的调试方法及要求应符合下列规定： 1 应选取送风系统末端所对应的送风最不利的三个连续楼层模拟起火层及其上下层，封闭避难层（间）仅需选取本层，调试送风系统使上述楼层的楼梯间、前室及封闭避难层（间）的风压值及疏散门的门洞断面风速值与设计值的偏差不大于10%； 2 对楼梯间和前室的调试应单独分别进行，且互不影响； 3 调试楼梯间和前室疏散门的门洞断面风速时，设计疏散门开启的楼层数量应符合本标准第3.4.6条的规定。",{"id":6,"name":27,"category":28,"favorite":29},"消防技术综合能力(一级、二级)","建筑工程",0]