[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-934601":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},934601,605,1,"单选题","(2015年真题) 某单位新建办公楼项目已获得施工许可，现拟进行消防设计备案。下列提供备案材料的行为中，不符合备案要求的是（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","获得施工许可7个工作日内提供",false,{"key":16,"text":17,"correct":14},"B","获得施工许可3天内提供",{"key":19,"text":20,"correct":14},"C","获得施工许可5天内提供",{"key":22,"text":23,"correct":24},"D","获得施工许可10个工作日内提供",true,"《消防法》第十条规定，按照国家工程建设消防技术标准需要进行消防设计的建设工程，除本法第十一条另有规定的外，建设单位应当自依法取得施工许可之日起七个工作日内，将消防设计文件报消防机构备案，消防机构应当进行抽查。",{"id":6,"name":27,"category":28,"favorite":29},"消防技术综合能力(一级、二级)","建筑工程",0]