[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-934050":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},934050,604,1,"单选题","人民防空工程中的单建掘开式工程是单独建设的采用（ ）施工，且大部分结构处于原地表以下的工程。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","盾构法",false,{"key":16,"text":17,"correct":14},"B","盖挖法",{"key":19,"text":20,"correct":21},"C","明挖法",true,{"key":23,"text":24,"correct":14},"D","喷锚暗挖法","根据《人民防空工程施工及验收规范》GB 50134-2004中2．0．2 ，单建掘开式工程是指单独建设的采用明挖法施工，且大部分结构处于原地表以下的工程。",{"id":6,"name":27,"category":28,"favorite":29},"消防安全技术实务(一级)","建筑工程",0]