[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-603-9":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":645},{"id":5,"name":6,"category":7,"favorite":8},603,"质量、投资、进度控制","建筑工程",0,9,50,656,[13,34,46,63,71,86,98,109,121,133,145,157,169,181,192,204,216,228,240,252,264,276,288,300,312,324,336,348,360,372,384,395,410,421,436,448,462,474,482,494,509,524,536,550,565,580,592,604,616,630],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},931420,1,"单选题","在双代号网络计划中，如果两个工序都具有相同的起始节点且假设都有相同的紧后工序，则这两个工序的( )。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","ES相等",true,{"key":24,"text":25,"correct":26},"B","EF相等",false,{"key":28,"text":29,"correct":26},"C","LS相等",{"key":31,"text":32,"correct":26},"D","LF相等","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},931421,"当一年中计息次数m大于1时，年实际利率将( )年名义利率。",[38,40,42,44],{"key":20,"text":39,"correct":26},"等于",{"key":24,"text":41,"correct":26},"小于",{"key":28,"text":43,"correct":22},"大于",{"key":31,"text":45,"correct":26},"无法确定",{"id":47,"libraryId":5,"type":48,"typeLabel":49,"stem":33,"options":50,"answer":62,"analysis":33},931422,2,"多选题",[51,53,55,57,59],{"key":20,"text":52,"correct":22},"有多个起点节点",{"key":24,"text":54,"correct":26},"有多个终点节点",{"key":28,"text":56,"correct":26},"节点编号有误",{"key":31,"text":58,"correct":26},"存在循环回路",{"key":60,"text":61,"correct":22},"E","有多余虚工作","AE",{"id":64,"libraryId":5,"type":15,"typeLabel":16,"stem":65,"options":66,"answer":24,"analysis":33},931423,"在搭接网络计划中，工作i与工作j存在搭接关系，工作i的最迟完成时间等于( )。",[67,68,69,70],{"key":20,"text":33,"correct":26},{"key":24,"text":33,"correct":22},{"key":28,"text":33,"correct":26},{"key":31,"text":33,"correct":26},{"id":72,"libraryId":5,"type":48,"typeLabel":49,"stem":73,"options":74,"answer":85,"analysis":33},931424,"价值工程分析中，方案评价的内容应包括( )。",[75,77,79,81,83],{"key":20,"text":76,"correct":22},"技术评价",{"key":24,"text":78,"correct":26},"对象评价",{"key":28,"text":80,"correct":22},"经济评价",{"key":31,"text":82,"correct":26},"功能评价",{"key":60,"text":84,"correct":22},"社会评价","ACE",{"id":87,"libraryId":5,"type":15,"typeLabel":16,"stem":88,"options":89,"answer":24,"analysis":33},931425,"通过设计更改或消除失效起因或机理是降低( )的唯一途径。",[90,92,94,96],{"key":20,"text":91,"correct":26},"重要程度",{"key":24,"text":93,"correct":22},"频度",{"key":28,"text":95,"correct":26},"不易探测度",{"key":31,"text":97,"correct":26},"严重度",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":100,"answer":24,"analysis":33},931426,[101,103,105,107],{"key":20,"text":102,"correct":26},"14%",{"key":24,"text":104,"correct":22},"14.18%",{"key":28,"text":106,"correct":26},"16.39%",{"key":31,"text":108,"correct":26},"19.53%",{"id":110,"libraryId":5,"type":15,"typeLabel":16,"stem":111,"options":112,"answer":31,"analysis":33},931427,"①将各组对数据于坐标图中标明；②记入要素名称、采集时间等必要事项；③画出横、纵轴；④收集相对数据，并将数据整理到坐标图上；⑤找出x、y之最大值及最小值。下列正确的散布图应用顺序为( )。",[113,115,117,119],{"key":20,"text":114,"correct":26},"①②③④⑤",{"key":24,"text":116,"correct":26},"②①⑤③④",{"key":28,"text":118,"correct":26},"③⑤①④②",{"key":31,"text":120,"correct":22},"④⑤③①②",{"id":122,"libraryId":5,"type":15,"typeLabel":16,"stem":123,"options":124,"answer":24,"analysis":33},931428,"已知甲、乙为两个寿命期相同的互斥方案，甲、乙两方案的内部收益率分别为15%和13%，净现值分别为150万元和180万元。假如基准收益率为12%，则下列说法正确的是( )。",[125,127,129,131],{"key":20,"text":126,"correct":26},"应选择甲项目",{"key":24,"text":128,"correct":22},"应选择乙项目",{"key":28,"text":130,"correct":26},"应同时选择甲、乙两个项目",{"key":31,"text":132,"correct":26},"甲、乙两项目均不应选择",{"id":134,"libraryId":5,"type":15,"typeLabel":16,"stem":135,"options":136,"answer":20,"analysis":33},931429,"涉及结构安全的试块及有关材料，应按规定进行( )检测。",[137,139,141,143],{"key":20,"text":138,"correct":22},"见证取样",{"key":24,"text":140,"correct":26},"抽样",{"key":28,"text":142,"correct":26},"全数",{"key":31,"text":144,"correct":26},"随机抽样",{"id":146,"libraryId":5,"type":15,"typeLabel":16,"stem":147,"options":148,"answer":24,"analysis":33},931430,"某项目基本方案的财务内部收益率为15%，对应的原材料价格为8000元\u002F吨，若原材料价格为9000元\u002F吨，则该项目的财务内部收益率为12%，该财务内部收益率指标对项目原材料价格的敏感度系数为( )。",[149,151,153,155],{"key":20,"text":150,"correct":26},"1.8",{"key":24,"text":152,"correct":22},"-1.6",{"key":28,"text":154,"correct":26},"-1.8",{"key":31,"text":156,"correct":26},"-2.0",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":31,"analysis":33},931431,"下列描述中，属于C类不合格的是( )。",[161,163,165,167],{"key":20,"text":162,"correct":26},"单位产品的极重要的质量特性不符合规定",{"key":24,"text":164,"correct":26},"单位产品的质量特性极严重不符合规定",{"key":28,"text":166,"correct":26},"单位产品重要的质量特性不符合规定",{"key":31,"text":168,"correct":22},"单位产品的一般质量特性不符合规定",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":24,"analysis":33},931432,"在单代号网络图中，下列说法错误的是( )。",[173,175,177,179],{"key":20,"text":174,"correct":26},"可能有虚拟节点但无虚箭线",{"key":24,"text":176,"correct":22},"一定会出现虚拟开始节点",{"key":28,"text":178,"correct":26},"可能会出现虚拟开始节点",{"key":31,"text":180,"correct":26},"除单代号搭接网络外一般不会出现虚箭线",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":183,"answer":24,"analysis":33},931433,[184,186,188,190],{"key":20,"text":185,"correct":26},"均为零",{"key":24,"text":187,"correct":22},"分别为2和0",{"key":28,"text":189,"correct":26},"均为2",{"key":31,"text":191,"correct":26},"分别为4和0",{"id":193,"libraryId":5,"type":15,"typeLabel":16,"stem":194,"options":195,"answer":31,"analysis":33},931434,"适合用最小公倍数法进行方案比选的方案类型是( )。",[196,198,200,202],{"key":20,"text":197,"correct":26},"混合方案",{"key":24,"text":199,"correct":26},"寿命期相同的互斥方案",{"key":28,"text":201,"correct":26},"独立方案",{"key":31,"text":203,"correct":22},"寿命期不同的互斥方案",{"id":205,"libraryId":5,"type":15,"typeLabel":16,"stem":206,"options":207,"answer":24,"analysis":33},931435,"依据《建设工程工程量清单计价规范》中的规定，由于设计变更引起新的工程量清单项目，其相应综合单价应( )。",[208,210,212,214],{"key":20,"text":209,"correct":26},"由承包商自行确定",{"key":24,"text":211,"correct":22},"由承包商提出，经发包人确认后，作为结算依据",{"key":28,"text":213,"correct":26},"由发包人自行确定",{"key":31,"text":215,"correct":26},"由监理工程师提出，经发包人确认后，作为结算依据",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":20,"analysis":33},931436,"FIDIC合同条件关于工程变更权的描述不正确的是( )。",[220,222,224,226],{"key":20,"text":221,"correct":22},"承包商应绝对遵守并执行每项变更",{"key":24,"text":223,"correct":26},"工程师可通过发布指示或要求承包商提交建议书的方式提出变更",{"key":28,"text":225,"correct":26},"任何部分工程的标高、位置和(或)尺寸改变可以构成变更",{"key":31,"text":227,"correct":26},"只有工程师指标或批准了变更，承包商才能对永久工程作出改变和(或)修改",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":28,"analysis":33},931437,"对于设备不可消除性的有形磨损，采用的补偿方式是( )。",[232,234,236,238],{"key":20,"text":233,"correct":26},"保养",{"key":24,"text":235,"correct":26},"大修理",{"key":28,"text":237,"correct":22},"更新",{"key":31,"text":239,"correct":26},"现代化改装",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":24,"analysis":33},931438,"设备质量监理形式可划分为审核、巡回、( )等。",[244,246,248,250],{"key":20,"text":245,"correct":26},"跟踪、试验、抽查",{"key":24,"text":247,"correct":22},"报验、跟踪、抽查",{"key":28,"text":249,"correct":26},"测量、检验、抽查",{"key":31,"text":251,"correct":26},"试验、检查、测量",{"id":253,"libraryId":5,"type":15,"typeLabel":16,"stem":254,"options":255,"answer":24,"analysis":33},931439,"可靠性设计的主要内容不包括( )。",[256,258,260,262],{"key":20,"text":257,"correct":26},"可靠性分配",{"key":24,"text":259,"correct":22},"可靠性评估",{"key":28,"text":261,"correct":26},"提高产品薄弱环节的可靠性",{"key":31,"text":263,"correct":26},"采用可靠性技术",{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":24,"analysis":33},931440,"建设工程投资中的积极投资部分是指( )。",[268,270,272,274],{"key":20,"text":269,"correct":26},"建筑安装工程费",{"key":24,"text":271,"correct":22},"设备工器具购置费‘",{"key":28,"text":273,"correct":26},"工程建设其他费",{"key":31,"text":275,"correct":26},"固定资产投资方向调节税",{"id":277,"libraryId":5,"type":15,"typeLabel":16,"stem":278,"options":279,"answer":20,"analysis":33},931441,"一种收集和记录数据的一种方式，便于用统一的方式收集数据并进行分析。它主要用于系统地收集数据、信息，以便正确地认识事实。以上描述的是( )。",[280,282,284,286],{"key":20,"text":281,"correct":22},"调查表",{"key":24,"text":283,"correct":26},"对策表",{"key":28,"text":285,"correct":26},"因果图",{"key":31,"text":287,"correct":26},"排列图",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":20,"analysis":33},931442,"工作和工作之间的逻辑关系确定，且对每项工作只估计一个确定的持续时间的网络计划技术是( )。",[292,294,296,298],{"key":20,"text":293,"correct":22},"关键线路法",{"key":24,"text":295,"correct":26},"计划评审技术",{"key":28,"text":297,"correct":26},"图示评审技术",{"key":31,"text":299,"correct":26},"风险评审技术",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":28,"analysis":33},931443,"某设备工程采用总承包(EP C)模式发包，在设备采购进度管理中，应由设备监理工程师审核的文件是( )。",[304,306,308,310],{"key":20,"text":305,"correct":26},"设备采购招标文件",{"key":24,"text":307,"correct":26},"设备采购评标报告",{"key":28,"text":309,"correct":22},"设备采购进度计划",{"key":31,"text":311,"correct":26},"中标供应商名单",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":28,"analysis":33},931444,"挣值(EV)-计划价值(PV)＞0，表明( )。",[316,318,320,322],{"key":20,"text":317,"correct":26},"成本节约",{"key":24,"text":319,"correct":26},"成本超支",{"key":28,"text":321,"correct":22},"进度提前",{"key":31,"text":323,"correct":26},"进度延误",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":24,"analysis":33},931445,"某项目设计生产能力为800吨\u002F年，单位产品价格为6万元\u002F吨，单位产品变动成本为2.4万元\u002F吨，年固定成本为1800万元，则使该项目达到盈亏平衡状态的生产能力利用率为( )。",[328,330,332,334],{"key":20,"text":329,"correct":26},"44.44%",{"key":24,"text":331,"correct":22},"62.5%",{"key":28,"text":333,"correct":26},"77.5%",{"key":31,"text":335,"correct":26},"93.75%",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":31,"analysis":33},931446,"系统方法不包括( )。",[340,342,344,346],{"key":20,"text":341,"correct":26},"系统分析",{"key":24,"text":343,"correct":26},"系统工程",{"key":28,"text":345,"correct":26},"系统管理",{"key":31,"text":347,"correct":22},"系统设计",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":28,"analysis":33},931447,"设备工程质量是指设备工程的一组( )满足要求的程度。",[352,354,356,358],{"key":20,"text":353,"correct":26},"功能特性",{"key":24,"text":355,"correct":26},"质量特性",{"key":28,"text":357,"correct":22},"固有特性",{"key":31,"text":359,"correct":26},"本质特性",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":20,"analysis":33},931448,"一般说来，工程技术人员遇到的多为( )方案的选择。",[364,366,368,370],{"key":20,"text":365,"correct":22},"互斥",{"key":24,"text":367,"correct":26},"独立",{"key":28,"text":369,"correct":26},"层混",{"key":31,"text":371,"correct":26},"互补",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":28,"analysis":33},931449,"检验指导书是指导检验人员实施检验操作的文件。它是( )的细化。",[376,378,380,382],{"key":20,"text":377,"correct":26},"程序",{"key":24,"text":379,"correct":26},"质量计划",{"key":28,"text":381,"correct":22},"检验规程",{"key":31,"text":383,"correct":26},"检验计划",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":386,"answer":28,"analysis":33},931450,[387,389,391,393],{"key":20,"text":388,"correct":26},"2",{"key":24,"text":390,"correct":26},"3",{"key":28,"text":392,"correct":22},"4",{"key":31,"text":394,"correct":26},"5",{"id":396,"libraryId":5,"type":48,"typeLabel":49,"stem":397,"options":398,"answer":409,"analysis":33},931451,"按照2000版的ISO 9000族标准，组织在实施“与供方互利的关系”原则时，一般要采取的措施包括( )。",[399,401,403,405,407],{"key":20,"text":400,"correct":22},"识别并选择重要供方",{"key":24,"text":402,"correct":26},"对组织员工进行职业道德教育",{"key":28,"text":404,"correct":22},"创造通畅和公开的沟通渠道",{"key":31,"text":406,"correct":22},"与重要供方共享专门技术、信息和资源",{"key":60,"text":408,"correct":26},"控制供方数量和供货价格","ACD",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":412,"answer":28,"analysis":33},931452,[413,415,417,419],{"key":20,"text":414,"correct":26},"3.2",{"key":24,"text":416,"correct":26},"3.4",{"key":28,"text":418,"correct":22},"3.8",{"key":31,"text":420,"correct":26},"4.2",{"id":422,"libraryId":5,"type":48,"typeLabel":49,"stem":423,"options":424,"answer":435,"analysis":33},931453,"对于正常运营的项目，( )指标起码应大于1。",[425,427,429,431,433],{"key":20,"text":426,"correct":26},"资产负债率",{"key":24,"text":428,"correct":26},"利息备付率",{"key":28,"text":430,"correct":22},"流动比率",{"key":31,"text":432,"correct":22},"偿债备付率",{"key":60,"text":434,"correct":26},"总投资收益率","CD",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":31,"analysis":33},931454,"现有甲、乙、丙三个互斥的投资方案，三个方案的内部收益率分别为10%、15%和13.5%。若基准收益率为12%，则下列关于方案选择的说法，正确的是( )。",[440,442,444,446],{"key":20,"text":441,"correct":26},"应选择乙方案和丙方案",{"key":24,"text":443,"correct":26},"应只选择乙方案",{"key":28,"text":445,"correct":26},"应同时选择甲、乙、丙三个方案",{"key":31,"text":447,"correct":22},"依据给定资料无法得出结论",{"id":449,"libraryId":5,"type":48,"typeLabel":49,"stem":450,"options":451,"answer":62,"analysis":33},931455,"在建设工程监理规划指导下编制的施工进度控制工作细则，其主要内容有( )。",[452,454,456,458,460],{"key":20,"text":453,"correct":22},"进度控制工作流程",{"key":24,"text":455,"correct":26},"材料进场及检验安排",{"key":28,"text":457,"correct":26},"业主提供施工条件的进度协调程序",{"key":31,"text":459,"correct":26},"工程进度款的支付时间与方式",{"key":60,"text":461,"correct":22},"进度控制的方法和具体措施",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":20,"analysis":33},931456,"网络计划的优化中工期优化的目的是( )。",[466,468,470,472],{"key":20,"text":467,"correct":22},"压缩计算工期；",{"key":24,"text":469,"correct":26},"压缩要求工期；",{"key":28,"text":471,"correct":26},"压缩计划工期；",{"key":31,"text":473,"correct":26},"压缩实际工期；",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":24,"analysis":33},931457,"按着国际惯例，认证证书有效期为( )年。",[478,479,480,481],{"key":20,"text":388,"correct":26},{"key":24,"text":390,"correct":22},{"key":28,"text":392,"correct":26},{"key":31,"text":394,"correct":26},{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":20,"analysis":33},931458,"对于不合格的施工作业人员( )有权要求承包单位予以撤换。",[486,488,490,492],{"key":20,"text":487,"correct":22},"总监理工程师",{"key":24,"text":489,"correct":26},"专业监理工程师",{"key":28,"text":491,"correct":26},"资质管理部门",{"key":31,"text":493,"correct":26},"监理员",{"id":495,"libraryId":5,"type":48,"typeLabel":49,"stem":496,"options":497,"answer":508,"analysis":33},931459,"设备出厂前，设备监理工程师应检查制造单位出具的( )。",[498,500,502,504,506],{"key":20,"text":499,"correct":26},"联检资料",{"key":24,"text":501,"correct":22},"设备合格证",{"key":28,"text":503,"correct":22},"技术资料",{"key":31,"text":505,"correct":22},"装箱资料",{"key":60,"text":507,"correct":22},"有关检验记录","BCDE",{"id":510,"libraryId":5,"type":48,"typeLabel":49,"stem":511,"options":512,"answer":523,"analysis":33},931460,"在评价质量管理体系时，应对每一个被评价过程提出的基本问题有( )。",[513,515,517,519,521],{"key":20,"text":514,"correct":22},"过程是否已被识别并确定相互关系",{"key":24,"text":516,"correct":22},"职责是否已被分配",{"key":28,"text":518,"correct":22},"程序是否得到实施和保持",{"key":31,"text":520,"correct":22},"在实现所要求的结果方面，过程是否有效",{"key":60,"text":522,"correct":26},"方针目标是否已被确认","ABCD",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":24,"analysis":33},931461,"下列关于失效模式及影响分析的说法，正确的是( )。",[528,530,532,534],{"key":20,"text":529,"correct":26},"是一种自上而下的故障因果关系的分析方法",{"key":24,"text":531,"correct":22},"是一种自下而上的故障因果关系的分析方法",{"key":28,"text":533,"correct":26},"是一种自下而上的故障递进关系的分析方法",{"key":31,"text":535,"correct":26},"是一种自上而下的故障递进关系的分析方法",{"id":537,"libraryId":5,"type":48,"typeLabel":49,"stem":538,"options":539,"answer":523,"analysis":33},931462,"PFMEA可用于的方面是( )。",[540,542,544,546,548],{"key":20,"text":541,"correct":22},"确定与产品相关的过程失效模式",{"key":24,"text":543,"correct":22},"评价失效模式对顾客的潜在影响",{"key":28,"text":545,"correct":22},"确定失效起因，减少失效",{"key":31,"text":547,"correct":22},"根据失效模式的级别，建立纠正措施的优选体系",{"key":60,"text":549,"correct":26},"提供一个讨论降低风险的形式",{"id":551,"libraryId":5,"type":48,"typeLabel":49,"stem":552,"options":553,"answer":564,"analysis":33},931463,"下列关于内部收益率的说法，正确的是( )。",[554,556,558,560,562],{"key":20,"text":555,"correct":22},"内部收益率是使方案净现值等于零时的折现率",{"key":24,"text":557,"correct":22},"内部收益率大于等于基准收益率时，方案可行",{"key":28,"text":559,"correct":26},"内部收益率小于等于基准收益率时，方案可行",{"key":31,"text":561,"correct":22},"插值法求得的内部收益率大于方案真实的内部收益率",{"key":60,"text":563,"correct":26},"插值法求得的内部收益率小于方案真实的内部收益率","ABD",{"id":566,"libraryId":5,"type":48,"typeLabel":49,"stem":567,"options":568,"answer":579,"analysis":33},931464,"遇到( )情况时，承包商可以向业主要求既延长工期，又索赔费用。",[569,571,573,575,577],{"key":20,"text":570,"correct":22},"设计文件有缺陷",{"key":24,"text":572,"correct":22},"由于业主原因造成临时停工",{"key":28,"text":574,"correct":22},"业主供应的设备和材料推迟到货",{"key":31,"text":576,"correct":26},"特殊恶劣气候，造成施工停顿",{"key":60,"text":578,"correct":22},"工程师对竣工试验干扰","ABCE",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":28,"analysis":33},931465,"在故障树分析中，引起顶事件发生的最小底事件的集合，称为( )。",[584,586,588,590],{"key":20,"text":585,"correct":26},"最大割集",{"key":24,"text":587,"correct":26},"最大径集",{"key":28,"text":589,"correct":22},"最小割集",{"key":31,"text":591,"correct":26},"最小径集",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":28,"analysis":33},931466,"在八项质量管理原则中，过程方法PDCA中C的含义是指( )。",[596,598,600,602],{"key":20,"text":597,"correct":26},"过程处置",{"key":24,"text":599,"correct":26},"过程认证",{"key":28,"text":601,"correct":22},"过程检查",{"key":31,"text":603,"correct":26},"过程实施",{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":31,"analysis":33},931467,"实行直接测量，还是实行间接测量，应在( )中进行明确。",[608,610,612,614],{"key":20,"text":609,"correct":26},"取样方法",{"key":24,"text":611,"correct":26},"抽样方案",{"key":28,"text":613,"correct":26},"检验和试验文件",{"key":31,"text":615,"correct":22},"检验和试验方法",{"id":617,"libraryId":5,"type":48,"typeLabel":49,"stem":33,"options":618,"answer":629,"analysis":33},931468,[619,621,623,625,627],{"key":20,"text":620,"correct":26},"总工期为20天",{"key":24,"text":622,"correct":22},"关键线路有1条",{"key":28,"text":624,"correct":26},"关键线路有2条",{"key":31,"text":626,"correct":22},"工作H的总时差为1天",{"key":60,"text":628,"correct":22},"工作D的自由时差为3天","BDE",{"id":631,"libraryId":5,"type":48,"typeLabel":49,"stem":632,"options":633,"answer":644,"analysis":33},931469,"采用不平衡报价时，通常可以( )。",[634,636,638,640,642],{"key":20,"text":635,"correct":26},"对能早期得到结算付款的分部分项工程的单价定得较低，对后期的施工分项单价可以适当提高",{"key":24,"text":637,"correct":26},"估计施工中工程量可能会增加的项目，单价可以降低，工程量会减少的项目单价可以提高",{"key":28,"text":639,"correct":22},"设计图纸不明确或有错误的，估计今后修改后工程量会增加的项目，单价提高，工程内容说明不清的，单价降低",{"key":31,"text":641,"correct":22},"对于暂列数额(或工程)，预计做的可能性较大，价格可定高些，估计不一定发生的则单价低些",{"key":60,"text":643,"correct":22},"零星用工报价高于一般分部分项工程中的工资单价","CDE",[646,649,652,655,658,661],{"id":15,"name":647,"category":7,"favorite":648},"领导干部任职前廉政法规知识测试题",92,{"id":650,"name":651,"category":7,"favorite":15},595,"建筑结构与设备",{"id":653,"name":654,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":656,"name":657,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":659,"name":660,"category":7,"favorite":8},534,"BIM工程师",{"id":662,"name":660,"category":7,"favorite":8},535]