[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-603-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":659},{"id":5,"name":6,"category":7,"favorite":8},603,"质量、投资、进度控制","建筑工程",0,8,50,656,[13,38,52,67,79,88,103,115,126,137,149,163,175,190,201,216,231,243,255,270,279,294,306,321,331,345,355,367,379,392,404,415,427,440,452,464,477,492,504,518,530,542,556,568,581,596,608,623,635,647],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},931370,2,"多选题","故障树的定量分析的主要任务包括( )。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","计算出顶事件发生的概率",true,{"key":24,"text":25,"correct":22},"B","计算底事件的重要度",{"key":27,"text":28,"correct":29},"C","寻找顶事件发生的原因",false,{"key":31,"text":32,"correct":29},"D","找出全部最小割集",{"key":34,"text":35,"correct":29},"E","计算各种途径的事故发生概率","AB","",{"id":39,"libraryId":5,"type":40,"typeLabel":41,"stem":42,"options":43,"answer":20,"analysis":37},931371,1,"单选题","排列图中的每个直方形都表示一个质量问题或影响因素，其影响程度与各直方形的( )。",[44,46,48,50],{"key":20,"text":45,"correct":22},"高度成正比",{"key":24,"text":47,"correct":29},"高度成反比",{"key":27,"text":49,"correct":29},"宽度成正比",{"key":31,"text":51,"correct":29},"宽度成反比",{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":66,"analysis":37},931372,"关于正交试验设计的以下说法，正确的有( )。",[56,58,60,62,64],{"key":20,"text":57,"correct":22},"对试验结果不处理而“直接看”，其结果并不一定是最优组合",{"key":24,"text":59,"correct":22},"并列法正交表的表头设计与等水平正交表的表头设计一样，必须遵循不混杂原则",{"key":27,"text":61,"correct":29},"拟水平设计法用多水平正交表安排水平数较多的因素",{"key":31,"text":63,"correct":29},"拟水平法的极差分析方法与一般正交试验的极差分析方法完全相同",{"key":34,"text":65,"correct":22},"拟因素设计法不仅可以解决不等水平多因素试验问题，同时还可以考察交互作用，可以大大减少试验次数","ABE",{"id":68,"libraryId":5,"type":40,"typeLabel":41,"stem":69,"options":70,"answer":20,"analysis":37},931373,"质量管理八项原则中，( )是质量管理的首要原则。",[71,73,75,77],{"key":20,"text":72,"correct":22},"以顾客为关注焦点",{"key":24,"text":74,"correct":29},"全员参与",{"key":27,"text":76,"correct":29},"持续改进",{"key":31,"text":78,"correct":29},"领导作用",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":37,"options":81,"answer":87,"analysis":37},931374,[82,83,84,85,86],{"key":20,"text":37,"correct":29},{"key":24,"text":37,"correct":22},{"key":27,"text":37,"correct":22},{"key":31,"text":37,"correct":22},{"key":34,"text":37,"correct":29},"BCD",{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":102,"analysis":37},931375,"设备安装工程预算中应包含的费用内容有( )。",[92,94,96,98,100],{"key":20,"text":93,"correct":22},"直接工程费",{"key":24,"text":95,"correct":29},"设备购置费",{"key":27,"text":97,"correct":22},"措施费",{"key":31,"text":99,"correct":29},"预备费",{"key":34,"text":101,"correct":29},"工程建设其他费用","AC",{"id":104,"libraryId":5,"type":40,"typeLabel":41,"stem":105,"options":106,"answer":31,"analysis":37},931376,"监理工程师控制建设工程进度的组织措施是指( )。",[107,109,111,113],{"key":20,"text":108,"correct":29},"协调合同工期与进度计划之间的关系",{"key":24,"text":110,"correct":29},"编制进度控制工作细则",{"key":27,"text":112,"correct":29},"及时办理工程进度款支付手续",{"key":31,"text":114,"correct":22},"建立工程进度报告制度",{"id":116,"libraryId":5,"type":40,"typeLabel":41,"stem":37,"options":117,"answer":20,"analysis":37},931377,[118,120,122,124],{"key":20,"text":119,"correct":22},"150",{"key":24,"text":121,"correct":29},"225",{"key":27,"text":123,"correct":29},"250",{"key":31,"text":125,"correct":29},"300",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":136,"analysis":37},931378,"在八项质量管理原则中，( )是质量管理的基本点。",[130,131,132,134,135],{"key":20,"text":78,"correct":29},{"key":24,"text":74,"correct":29},{"key":27,"text":133,"correct":29},"过程方法",{"key":31,"text":76,"correct":22},{"key":34,"text":72,"correct":22},"DE",{"id":138,"libraryId":5,"type":40,"typeLabel":41,"stem":139,"options":140,"answer":20,"analysis":37},931379,"设计失效模式及影响分析是在设计( )采用的一种分析技术。",[141,143,145,147],{"key":20,"text":142,"correct":22},"初期",{"key":24,"text":144,"correct":29},"中期",{"key":27,"text":146,"correct":29},"后期",{"key":31,"text":148,"correct":29},"全程",{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":162,"analysis":37},931380,"下列选项中，属于质量管理体系基础的是( )。",[153,155,157,159,161],{"key":20,"text":154,"correct":22},"质量管理体系的理论说明",{"key":24,"text":156,"correct":22},"质量管理体系要求和产品要求",{"key":27,"text":158,"correct":22},"质量管理体系方法",{"key":31,"text":160,"correct":29},"质量管理术语",{"key":34,"text":133,"correct":22},"ABCE",{"id":164,"libraryId":5,"type":40,"typeLabel":41,"stem":165,"options":166,"answer":20,"analysis":37},931381,"下列选项中，不属于抽样检验特点的是( )。",[167,169,171,173],{"key":20,"text":168,"correct":22},"不适用于破坏性检验",{"key":24,"text":170,"correct":29},"检验的单位产品数量少、费用少、时间省、成本低",{"key":27,"text":172,"correct":29},"接收批中可能包含不合格品，不接收批中也可能包含合格品",{"key":31,"text":174,"correct":29},"检验对象是一批产品",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":189,"analysis":37},931382,"根据价值工程理论，下列各项功能中，属于从功能性质角度进行分类的有( )。",[179,181,183,185,187],{"key":20,"text":180,"correct":29},"基本功能",{"key":24,"text":182,"correct":29},"必要功能",{"key":27,"text":184,"correct":22},"使用功能",{"key":31,"text":186,"correct":22},"美学功能",{"key":34,"text":188,"correct":29},"过剩功能","CD",{"id":191,"libraryId":5,"type":40,"typeLabel":41,"stem":37,"options":192,"answer":24,"analysis":37},931383,[193,195,197,199],{"key":20,"text":194,"correct":29},"2",{"key":24,"text":196,"correct":22},"3",{"key":27,"text":198,"correct":29},"4",{"key":31,"text":200,"correct":29},"5",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":215,"analysis":37},931384,"在流程图的应用程序中，表示一个新过程情况一般包括( )。",[205,207,209,211,213],{"key":20,"text":206,"correct":29},"注明日期，以备识别、参考",{"key":24,"text":208,"correct":22},"确定该过程的开始和结束",{"key":27,"text":210,"correct":22},"分析工作从开始到结束的整个过程",{"key":31,"text":212,"correct":22},"确定该过程的步骤，即确定活动、决策、输入、输出",{"key":34,"text":214,"correct":22},"绘制流程图草案","BCDE",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":230,"analysis":37},931385,"抽样误差是反映样本代表性高低的因素，在其他条件不变的情况下，使抽样误差减小的因素有( )。",[220,222,224,226,228],{"key":20,"text":221,"correct":22},"样本单位数增多",{"key":24,"text":223,"correct":29},"样本单位数减少",{"key":27,"text":225,"correct":29},"总体各单位之间的差异程度增大",{"key":31,"text":227,"correct":22},"不重复抽样取代重复抽样",{"key":34,"text":229,"correct":22},"分类随机抽样取代简单随机抽样","ADE",{"id":232,"libraryId":5,"type":40,"typeLabel":41,"stem":233,"options":234,"answer":27,"analysis":37},931386,"某方案现时点投资30万元，1年后开始收益，连续20年，每年将有8万元的净收益，净残值为6万元。若基准收益率为20%，已知(P\u002F A，20%，20)=4.8696，(P\u002F F，20%，20)=0.0261，则该方案的净现值是( )万元。",[235,237,239,241],{"key":20,"text":236,"correct":29},"2.96",{"key":24,"text":238,"correct":29},"8.96",{"key":27,"text":240,"correct":22},"9.11",{"key":31,"text":242,"correct":29},"14.96",{"id":244,"libraryId":5,"type":40,"typeLabel":41,"stem":245,"options":246,"answer":31,"analysis":37},931387,"施工进度检查的主要方法是将经过整理的实际进度数据与计划进度数据进行比较，其目的是( )。",[247,249,251,253],{"key":20,"text":248,"correct":29},"分析影响施工进度的原因",{"key":24,"text":250,"correct":29},"掌握各项工作时差的利用情况",{"key":27,"text":252,"correct":29},"提供计划调整和优化的依据",{"key":31,"text":254,"correct":22},"发现进度偏差及其大小",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":269,"analysis":37},931388,"下列设备磨损类型中，属于无形磨损的是( )。",[259,261,263,265,267],{"key":20,"text":260,"correct":22},"由于制造工艺改进，生产同样设备所需社会必要劳动消耗减少，致使原有设备贬值",{"key":24,"text":262,"correct":29},"设备在使用过程中由于外力作用发生零部件损坏，致使设备贬值",{"key":27,"text":264,"correct":29},"设备在闲置过程中受到腐蚀，导致零部件锈蚀、老化，以致设备贬值",{"key":31,"text":266,"correct":22},"由于科学技术进步，出现了更为先进的设备，使现有设备发生贬值",{"key":34,"text":268,"correct":29},"设备提取折旧，致使其账面价值降低","AD",{"id":271,"libraryId":5,"type":40,"typeLabel":41,"stem":272,"options":273,"answer":31,"analysis":37},931389,"下列选项中，不属于质量管理体系的是( )。",[274,275,276,278],{"key":20,"text":158,"correct":29},{"key":24,"text":133,"correct":29},{"key":27,"text":277,"correct":29},"质量方针和质量目标",{"key":31,"text":160,"correct":22},{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":293,"analysis":37},931390,"最高管理者在质量管理体系中的作用有( )。",[283,285,287,289,291],{"key":20,"text":284,"correct":22},"建立组织的质量方针和质量目标",{"key":24,"text":286,"correct":22},"确保整个组织关注顾客要求",{"key":27,"text":288,"correct":22},"确保过程适宜，满足顾客要求，实现质量目标",{"key":31,"text":290,"correct":22},"确保获得必要的资源",{"key":34,"text":292,"correct":29},"确保质量方法的恰当使用","ABCD",{"id":295,"libraryId":5,"type":40,"typeLabel":41,"stem":296,"options":297,"answer":20,"analysis":37},931391,"由设备出口国银行把出口信贷直接贷给买方，买卖双方以即期现汇成交，这种出口信贷形式属于( )。",[298,300,302,304],{"key":20,"text":299,"correct":22},"买方信贷",{"key":24,"text":301,"correct":29},"卖方信贷",{"key":27,"text":303,"correct":29},"出口国信贷",{"key":31,"text":305,"correct":29},"进口国信贷",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":320,"analysis":37},931392,"实施领导作用原则时一般要采取的措施包括( )。",[310,312,314,316,318],{"key":20,"text":311,"correct":22},"全面考虑所有相关方的需求",{"key":24,"text":313,"correct":22},"做好发展规划",{"key":27,"text":315,"correct":29},"确保实现组织的各项目标",{"key":31,"text":317,"correct":22},"提倡公开和诚恳的交流和沟通",{"key":34,"text":319,"correct":22},"创造并坚持一种共同的价值观，形成企业的精神和企业文化","ABDE",{"id":322,"libraryId":5,"type":40,"typeLabel":41,"stem":37,"options":323,"answer":24,"analysis":37},931393,[324,325,327,329],{"key":20,"text":200,"correct":29},{"key":24,"text":326,"correct":22},"6",{"key":27,"text":328,"correct":29},"7",{"key":31,"text":330,"correct":29},"8",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":102,"analysis":37},931394,"下列关于静态投资回收期的说法，正确的有( )。",[335,337,339,341,343],{"key":20,"text":336,"correct":22},"计算静态投资回收期时不考虑资金的时间价值",{"key":24,"text":338,"correct":29},"当静态投资回收期小于项目寿命期时，可接受该项目",{"key":27,"text":340,"correct":22},"当静态投资回收期大于基准投资回收期时，应拒绝该项目",{"key":31,"text":342,"correct":29},"静态投资回收期即为累计净现金流量开始出现正值的年份数",{"key":34,"text":344,"correct":29},"静态投资回收期肯定大于动态投资回收期",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":354,"analysis":37},931395,"下列选项中，阐述了质量管理体系的建立和实施思路的是( )。",[349,350,351,352,353],{"key":20,"text":154,"correct":22},{"key":24,"text":156,"correct":29},{"key":27,"text":158,"correct":22},{"key":31,"text":133,"correct":22},{"key":34,"text":277,"correct":29},"ACD",{"id":356,"libraryId":5,"type":40,"typeLabel":41,"stem":357,"options":358,"answer":27,"analysis":37},931396,"( )是建设工程经济效益的全面反映，是项目法人核定各类新增资产价值、办理其交付使用的依据。",[359,361,363,365],{"key":20,"text":360,"correct":29},"投资估算",{"key":24,"text":362,"correct":29},"竣工结算",{"key":27,"text":364,"correct":22},"竣工决算",{"key":31,"text":366,"correct":29},"施工图预算",{"id":368,"libraryId":5,"type":40,"typeLabel":41,"stem":369,"options":370,"answer":24,"analysis":37},931397,"( )是组织开展职业健康安全管理工作的准则。",[371,373,375,377],{"key":20,"text":372,"correct":29},"制定职业健康安全目标",{"key":24,"text":374,"correct":22},"制定职业健康安全方针",{"key":27,"text":376,"correct":29},"制定职业健康管理方案",{"key":31,"text":378,"correct":29},"确定组织机构和职责",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":37,"options":381,"answer":102,"analysis":37},931398,[382,384,386,388,390],{"key":20,"text":383,"correct":22},"内部收益率在12%～15%之间",{"key":24,"text":385,"correct":29},"净现值小于零",{"key":27,"text":387,"correct":22},"可行",{"key":31,"text":389,"correct":29},"净年值小于零",{"key":34,"text":391,"correct":29},"净将来值小于零",{"id":393,"libraryId":5,"type":40,"typeLabel":41,"stem":394,"options":395,"answer":24,"analysis":37},931399,"PDCA模式将职业健康安全与环境管理体系要素分为( )部分。",[396,398,400,402],{"key":20,"text":397,"correct":29},"四",{"key":24,"text":399,"correct":22},"五",{"key":27,"text":401,"correct":29},"六",{"key":31,"text":403,"correct":29},"七",{"id":405,"libraryId":5,"type":40,"typeLabel":41,"stem":37,"options":406,"answer":24,"analysis":37},931400,[407,409,411,413],{"key":20,"text":408,"correct":29},"2；",{"key":24,"text":410,"correct":22},"3；",{"key":27,"text":412,"correct":29},"4；",{"key":31,"text":414,"correct":29},"5；",{"id":416,"libraryId":5,"type":40,"typeLabel":41,"stem":417,"options":418,"answer":20,"analysis":37},931401,"某项目前五年累计财务净现值为50万元，第6、7、8年年末净现金流量分别为40、40、30万元，若基准收益率为8％，则该项目8年内累计财务净现值为( )万元。",[419,421,423,425],{"key":20,"text":420,"correct":22},"114.75",{"key":24,"text":422,"correct":29},"134.39",{"key":27,"text":424,"correct":29},"145.15",{"key":31,"text":426,"correct":29},"160.00",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":102,"analysis":37},931402,"A.F=A(P\u002F A，i，6)(F\u002FP，i，8) B.F=A(P\u002F A，i，5)(F\u002FP，i，7) C.F=A(F\u002F",[431,433,435,437,438],{"key":20,"text":432,"correct":22},"i，6)(F\u002FP，i，2)",{"key":24,"text":434,"correct":29},"F=A(F\u002F",{"key":27,"text":436,"correct":22},"i，5)(F\u002FP，i，2)",{"key":31,"text":434,"correct":29},{"key":34,"text":439,"correct":29},"i，6)(F\u002FP，i，l)",{"id":441,"libraryId":5,"type":40,"typeLabel":41,"stem":442,"options":443,"answer":20,"analysis":37},931403,"( )是指由一位评价人，多次使用一种测量仪器，测量同一零件的同一特性时，获得的测量值变差或在固定和规定测量条件下连续(短期)试验的变差。",[444,446,448,450],{"key":20,"text":445,"correct":22},"重复性",{"key":24,"text":447,"correct":29},"再现性",{"key":27,"text":449,"correct":29},"精密度",{"key":31,"text":451,"correct":29},"准确度",{"id":453,"libraryId":5,"type":40,"typeLabel":41,"stem":454,"options":455,"answer":20,"analysis":37},931404,"液压挖掘机采用双泵、双发动机提高其可靠性，采用的是( )。",[456,458,460,462],{"key":20,"text":457,"correct":22},"冗余技术",{"key":24,"text":459,"correct":29},"防错设计",{"key":27,"text":461,"correct":29},"人机工程设计",{"key":31,"text":463,"correct":29},"维修性设计",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":37,"options":466,"answer":102,"analysis":37},931405,[467,469,471,473,475],{"key":20,"text":468,"correct":22},"工作C的自由时差为2天",{"key":24,"text":470,"correct":29},"工作E的最早开始时间为第4天",{"key":27,"text":472,"correct":22},"工作D为关键工作",{"key":31,"text":474,"correct":29},"工作H的总时差为零",{"key":34,"text":476,"correct":29},"工作B的最迟完成时间为第1天",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":491,"analysis":37},931406,"在计数型控制图中，质量特性统计量常用( )来表示。",[481,483,485,487,489],{"key":20,"text":482,"correct":29},"均值",{"key":24,"text":484,"correct":29},"极值或标准差",{"key":27,"text":486,"correct":22},"不合格品率",{"key":31,"text":488,"correct":22},"不合格品数",{"key":34,"text":490,"correct":22},"不合格数","CDE",{"id":493,"libraryId":5,"type":40,"typeLabel":41,"stem":494,"options":495,"answer":27,"analysis":37},931407,"质量展开是将顾客的( )转换成质量特性，确定产品的设计质量，经过各功能部件的质量，直到每个零件的质量和工序要素，系统地展开它们之间的关系。",[496,498,500,502],{"key":20,"text":497,"correct":29},"质量规范",{"key":24,"text":499,"correct":29},"合同规定",{"key":27,"text":501,"correct":22},"需求质量",{"key":31,"text":503,"correct":29},"潜在需求",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":269,"analysis":37},931408,"编制检验和试验文件时，应考虑如何尽可能减小误差，可以采取的措施有( )。",[508,510,512,514,516],{"key":20,"text":509,"correct":22},"基准同一",{"key":24,"text":511,"correct":29},"型式试验",{"key":27,"text":513,"correct":29},"误差最小化",{"key":31,"text":515,"correct":22},"测量链最短",{"key":34,"text":517,"correct":29},"进货检验控制",{"id":519,"libraryId":5,"type":40,"typeLabel":41,"stem":520,"options":521,"answer":20,"analysis":37},931409,"在搭接网络计划中工作之间的搭接关系是由( )决定的。",[522,524,526,528],{"key":20,"text":523,"correct":22},"相邻两项工作之间的不同时距",{"key":24,"text":525,"correct":29},"相邻两项工作之间的不同流水节拍",{"key":27,"text":527,"correct":29},"相邻两项工作之间的不同步距",{"key":31,"text":529,"correct":29},"相邻两项工作之间的最早开始时间",{"id":531,"libraryId":5,"type":40,"typeLabel":41,"stem":532,"options":533,"answer":20,"analysis":37},931410,"在某工程网络计划中，已知工作M的总时差和自由时差分别为7天和4天，监理工程师检查实际进度时发现该工作的持续时间延长了3天，说明此时工作M的实际进度( )。",[534,536,538,540],{"key":20,"text":535,"correct":22},"既不影响总工期，也不影响其后续工作的正常进行；",{"key":24,"text":537,"correct":29},"不影响总工期，但将其后续工作的开始时间推迟3天；",{"key":27,"text":539,"correct":29},"将使总工期延长3天，但不影响其后续工作的正常进行；",{"key":31,"text":541,"correct":29},"将其后续工作的开始时间推迟3天，并使总工期延长3天；",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":230,"analysis":37},931411,"下列方法中，可以用于不确定性分析的有( )。",[546,548,550,552,554],{"key":20,"text":547,"correct":22},"盈亏平衡分析",{"key":24,"text":549,"correct":29},"期望值分析",{"key":27,"text":551,"correct":29},"现值分析",{"key":31,"text":553,"correct":22},"概率分析",{"key":34,"text":555,"correct":22},"敏感性分析",{"id":557,"libraryId":5,"type":40,"typeLabel":41,"stem":558,"options":559,"answer":27,"analysis":37},931412,"按照施工图设计文件投入使用前的设计变更控制程序，因非设计单位原因引起的设计变更导致的设计费用增减应由( )审核签认。",[560,562,564,566],{"key":20,"text":561,"correct":29},"施工图审查机构",{"key":24,"text":563,"correct":29},"建设单位",{"key":27,"text":565,"correct":22},"监理单位",{"key":31,"text":567,"correct":29},"设计单位",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":37,"options":570,"answer":102,"analysis":37},931413,[571,573,575,577,579],{"key":20,"text":572,"correct":22},"到第3月末，实际进度正常",{"key":24,"text":574,"correct":29},"第4月内实际进展超前",{"key":27,"text":576,"correct":22},"第2月前半月本工作停工",{"key":31,"text":578,"correct":29},"第3月至第5月实际进度为非匀速",{"key":34,"text":580,"correct":29},"预计本工作能够按时完成",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":595,"analysis":37},931414,"检验的基本职能包括( )。",[585,587,589,591,593],{"key":20,"text":586,"correct":22},"鉴别",{"key":24,"text":588,"correct":22},"把关",{"key":27,"text":590,"correct":29},"监督",{"key":31,"text":592,"correct":22},"报告",{"key":34,"text":594,"correct":29},"预防","ABD",{"id":597,"libraryId":5,"type":40,"typeLabel":41,"stem":598,"options":599,"answer":27,"analysis":37},931415,"建设工程组织流水施工时，其特点之一是( )。",[600,602,604,606],{"key":20,"text":601,"correct":29},"由一个专业队在各施工段上依次施工",{"key":24,"text":603,"correct":29},"同一时间段只能有一个专业队投入流水施工",{"key":27,"text":605,"correct":22},"各专业队按施工顺序应连续、均衡地组织施工",{"key":31,"text":607,"correct":29},"施工现场的组织管理简单，工期最短",{"id":609,"libraryId":5,"type":15,"typeLabel":16,"stem":610,"options":611,"answer":622,"analysis":37},931416,"进度计划执行的监测与调整阶段，设备监理工程师的主要工作内容包括( )。",[612,614,616,618,620],{"key":20,"text":613,"correct":22},"进度调整",{"key":24,"text":615,"correct":22},"进度数据采集",{"key":27,"text":617,"correct":22},"进度偏差分析",{"key":31,"text":619,"correct":29},"处理设备工程的索赔事宜",{"key":34,"text":621,"correct":29},"核实已完成任务量，签发应付工程进度款","ABC",{"id":624,"libraryId":5,"type":40,"typeLabel":41,"stem":625,"options":626,"answer":27,"analysis":37},931417,"6σ管理法中提到的6σ质量水平意味着产品合格的上下规格为目标值左右减加( )。",[627,629,631,633],{"key":20,"text":628,"correct":29},"2σ",{"key":24,"text":630,"correct":29},"3σ",{"key":27,"text":632,"correct":22},"6σ",{"key":31,"text":634,"correct":29},"12σ",{"id":636,"libraryId":5,"type":40,"typeLabel":41,"stem":637,"options":638,"answer":24,"analysis":37},931418,"在质量控制中，排列图是用来分析( )的。",[639,641,643,645],{"key":20,"text":640,"correct":29},"并控制工序质量",{"key":24,"text":642,"correct":22},"影响质量的主要问题",{"key":27,"text":644,"correct":29},"质量问题产生的原因",{"key":31,"text":646,"correct":29},"质量分布规律",{"id":648,"libraryId":5,"type":40,"typeLabel":41,"stem":649,"options":650,"answer":20,"analysis":37},931419,"在修堤坝时，一定要等土堤自然沉降后才能修护坡，筑土堤与修护坡之间的等待时间差值称为( )搭接关系。",[651,653,655,657],{"key":20,"text":652,"correct":22},"FTS",{"key":24,"text":654,"correct":29},"STS",{"key":27,"text":656,"correct":29},"FTF",{"key":31,"text":658,"correct":29},"STF",[660,663,666,669,672,675],{"id":40,"name":661,"category":7,"favorite":662},"领导干部任职前廉政法规知识测试题",92,{"id":664,"name":665,"category":7,"favorite":40},595,"建筑结构与设备",{"id":667,"name":668,"category":7,"favorite":40},715,"招标采购专业知识与法律法规",{"id":670,"name":671,"category":7,"favorite":40},848,"市政方向-通用基础",{"id":673,"name":674,"category":7,"favorite":8},534,"BIM工程师",{"id":676,"name":674,"category":7,"favorite":8},535]