[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-603-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":680},{"id":5,"name":6,"category":7,"favorite":8},603,"质量、投资、进度控制","建筑工程",0,7,50,656,[13,34,52,64,76,90,105,120,132,144,158,170,184,196,211,223,238,253,265,277,291,303,318,330,345,360,374,386,398,412,424,439,451,466,478,493,506,518,530,544,556,569,581,595,606,619,633,645,657,671],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},931320,1,"单选题","要做到对产品质量的正确判断是唯一的，无论谁来检验，只要按检验文件去操作，其结果应是相同的。这符合检验和试验文件的( )编制原则。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","确定性",true,{"key":24,"text":25,"correct":26},"B","可操作性",false,{"key":28,"text":29,"correct":26},"C","充分性",{"key":31,"text":32,"correct":26},"D","误差最小化","",{"id":35,"libraryId":5,"type":36,"typeLabel":37,"stem":38,"options":39,"answer":51,"analysis":33},931321,2,"多选题","某设备工程主要设备由业主负责采购，在设备采购进度管理中，设备监理工程师的工作内容包括( )。",[40,42,44,46,48],{"key":20,"text":41,"correct":22},"协助业主收集主要设备供应单位的信息",{"key":24,"text":43,"correct":26},"确定主要设备的供货时间",{"key":28,"text":45,"correct":22},"编制设备采购的监理工作进度计划",{"key":31,"text":47,"correct":22},"协助业主编制设备采购招标文件",{"key":49,"text":50,"correct":26},"E","确定设备供应商名单","ACD",{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":24,"analysis":33},931322,"在网络计划工期优化过程中，当出现两条独立的关键线路时，在考虑对质量、安全影响的基础上，优先选择的压缩对象应是这两条关键线路上( )的工作组合。",[56,58,60,62],{"key":20,"text":57,"correct":26},"资源消耗量之和最小",{"key":24,"text":59,"correct":22},"直接费用率之和最小",{"key":28,"text":61,"correct":26},"持续时间之和最长",{"key":31,"text":63,"correct":26},"间接费用率之和最小",{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":31,"analysis":33},931323,"下列选项中，不属于事件树编制程序的是( )。",[68,70,72,74],{"key":20,"text":69,"correct":26},"确定初始事件",{"key":24,"text":71,"correct":26},"判定安全功能",{"key":28,"text":73,"correct":26},"绘制事件树",{"key":31,"text":75,"correct":22},"简化系统图",{"id":77,"libraryId":5,"type":36,"typeLabel":37,"stem":78,"options":79,"answer":51,"analysis":33},931324,"在设备工程网络计划的执行过程中，当某项工作进度出现偏差后，出现下列( )情况时，需要调整原进度计划。",[80,82,84,86,88],{"key":20,"text":81,"correct":22},"设备工程总工期不允许拖延，但工作进度偏差已超过其总时差",{"key":24,"text":83,"correct":26},"设备工程总工期允许拖延，但工作进度偏差已超过其自由时差",{"key":28,"text":85,"correct":22},"设备工程总工期允许拖延的时间有限，但实际拖延的时间已超过此限制",{"key":31,"text":87,"correct":22},"后续工期不允许拖延，但工作进度偏差已超过其总时差",{"key":49,"text":89,"correct":26},"后续工期允许拖延，但工作进度偏差已超过其自由时差",{"id":91,"libraryId":5,"type":36,"typeLabel":37,"stem":92,"options":93,"answer":104,"analysis":33},931325,"某设备工程在安装调试过程中，由于业主原因导致承包商部分人员窝工，自有设备闲置，下列关于承包商索赔费用说法，正确的有( )。",[94,96,98,100,102],{"key":20,"text":95,"correct":26},"人工费必须按工程量表中的人工单价计算",{"key":24,"text":97,"correct":22},"机械闲置期间的有关费用按台班折旧费计算",{"key":28,"text":99,"correct":22},"现场管理费不能进行索赔",{"key":31,"text":101,"correct":26},"可以进行利润索赔",{"key":49,"text":103,"correct":22},"一般小能进行利润索赔","BCE",{"id":106,"libraryId":5,"type":36,"typeLabel":37,"stem":107,"options":108,"answer":119,"analysis":33},931326,"关于关键线路和关键工作的说法，正确的有( )。",[109,111,113,115,117],{"key":20,"text":110,"correct":22},"关键线路上相邻工作的时间间隔为零",{"key":24,"text":112,"correct":26},"关键工作的总时差一定为零",{"key":28,"text":114,"correct":26},"关键工作的最早开始时间等于最迟开始时间",{"key":31,"text":116,"correct":22},"关键线路上各工作持续时间之和最长",{"key":49,"text":118,"correct":22},"关键线路可能有多条","ADE",{"id":121,"libraryId":5,"type":15,"typeLabel":16,"stem":122,"options":123,"answer":28,"analysis":33},931327,"( )表示相对波动的大小。",[124,126,128,130],{"key":20,"text":125,"correct":26},"极差",{"key":24,"text":127,"correct":26},"中位数",{"key":28,"text":129,"correct":22},"变异系数",{"key":31,"text":131,"correct":26},"子样的均值",{"id":133,"libraryId":5,"type":15,"typeLabel":16,"stem":134,"options":135,"answer":24,"analysis":33},931328,"投资项目经济评价中，影响资金等值的因素不包括( )。",[136,138,140,142],{"key":20,"text":137,"correct":26},"资金额的大小",{"key":24,"text":139,"correct":22},"资金额的方向",{"key":28,"text":141,"correct":26},"计息期数",{"key":31,"text":143,"correct":26},"利率大小",{"id":145,"libraryId":5,"type":36,"typeLabel":37,"stem":146,"options":147,"answer":119,"analysis":33},931329,"下列指标中，适于评价寿命期相同的互斥方案的是( )。",[148,150,152,154,156],{"key":20,"text":149,"correct":22},"净现值法",{"key":24,"text":151,"correct":26},"最小公倍数法",{"key":28,"text":153,"correct":26},"研究期法",{"key":31,"text":155,"correct":22},"增量内部收益率法",{"key":49,"text":157,"correct":22},"增量净现值法",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":28,"analysis":33},931330,"某项目活动的计划工作量为8000平方米，已完工作量为10000平方米，预算单价为1000元\u002F平方米，则该项目活动的挣值是( )万元。",[162,164,166,168],{"key":20,"text":163,"correct":26},"200",{"key":24,"text":165,"correct":26},"800",{"key":28,"text":167,"correct":22},"1000",{"key":31,"text":169,"correct":26},"18000",{"id":171,"libraryId":5,"type":36,"typeLabel":37,"stem":172,"options":173,"answer":104,"analysis":33},931331,"抽样检验适用于( )。",[174,176,178,180,182],{"key":20,"text":175,"correct":26},"产品数量少",{"key":24,"text":177,"correct":22},"被检对象是连续体",{"key":28,"text":179,"correct":22},"破坏性检验",{"key":31,"text":181,"correct":26},"被检项目少",{"key":49,"text":183,"correct":22},"检验费用小",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":31,"analysis":33},931332,"( )是大中型项目竣工财务决算报表中所包括的而小型项目竣工财务决算报表中所没有的。",[188,190,192,194],{"key":20,"text":189,"correct":26},"交付使用资产明细表",{"key":24,"text":191,"correct":26},"项目竣工财务决算审批表",{"key":28,"text":193,"correct":26},"项目概况表",{"key":31,"text":195,"correct":22},"交付使用资产总表",{"id":197,"libraryId":5,"type":36,"typeLabel":37,"stem":198,"options":199,"answer":210,"analysis":33},931333,"下列选项中，属于资金时间价值产生原因的是( )。",[200,202,204,206,208],{"key":20,"text":201,"correct":26},"资金总会产生收益",{"key":24,"text":203,"correct":26},"净收益与时间的长短总成正比",{"key":28,"text":205,"correct":22},"对失去货币使用权的价值补偿",{"key":31,"text":207,"correct":22},"资金通过运作可以增值",{"key":49,"text":209,"correct":26},"时间总会产生利润","CD",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":24,"analysis":33},931334,"( )是指每个检验批内单位产品的数量。",[215,217,219,221],{"key":20,"text":216,"correct":26},"母体",{"key":24,"text":218,"correct":22},"批量",{"key":28,"text":220,"correct":26},"抽样计划",{"key":31,"text":222,"correct":26},"单位产品",{"id":224,"libraryId":5,"type":36,"typeLabel":37,"stem":225,"options":226,"answer":237,"analysis":33},931335,"下列关于工程网络计划的说法，正确的有( )",[227,229,231,233,235],{"key":20,"text":228,"correct":22},"时标网络计划中存在波形线",{"key":24,"text":230,"correct":26},"单代号网络计划中不存在虚拟工作",{"key":28,"text":232,"correct":22},"单代号网络计划中存在虚拟工作",{"key":31,"text":234,"correct":26},"双代号网络计划中不存在虚工作",{"key":49,"text":236,"correct":22},"双代号网络计划中存在虚箭线","ACE",{"id":239,"libraryId":5,"type":36,"typeLabel":37,"stem":240,"options":241,"answer":252,"analysis":33},931336,"建筑安装工程直接工程费中的人工费包括( )。",[242,244,246,248,250],{"key":20,"text":243,"correct":22},"交通补贴",{"key":24,"text":245,"correct":22},"住房补贴",{"key":28,"text":247,"correct":26},"失业保险费",{"key":31,"text":249,"correct":22},"职工福利费",{"key":49,"text":251,"correct":22},"防暑降温费","ABDE",{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":20,"analysis":33},931337,"在工程网络计划中，关键线路是指( )。",[257,259,261,263],{"key":20,"text":258,"correct":22},"单代号网络计划中总的工作持续时间最长的线路",{"key":24,"text":260,"correct":26},"双代号网络计划中由关键节点组成的线路",{"key":28,"text":262,"correct":26},"单代号搭接网络计划中总的工作持续时间最长的线路",{"key":31,"text":264,"correct":26},"双代号时标网络计划中无虚箭线的线路",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":31,"analysis":33},931338,"单代号搭接网络的计算工期由( )决定。",[269,271,273,275],{"key":20,"text":270,"correct":26},"终点虚拟节点的最早完成时间；",{"key":24,"text":272,"correct":26},"最后开始的工作的最早完成时间；",{"key":28,"text":274,"correct":26},"最后一项工作的持续时间；",{"key":31,"text":276,"correct":22},"可能由中间某个工作的最早完成时间。",{"id":278,"libraryId":5,"type":36,"typeLabel":37,"stem":279,"options":280,"answer":237,"analysis":33},931339,"组织流水施工时，划分施工段的原则是( )。",[281,283,285,287,289],{"key":20,"text":282,"correct":22},"能充分发挥主导施工机械的生产效率",{"key":24,"text":284,"correct":26},"根据各专业队的人数随时确定施工段的段界",{"key":28,"text":286,"correct":22},"施工段的段界尽可能与结构界限相吻合",{"key":31,"text":288,"correct":26},"划分施工段只适用于道路工程",{"key":49,"text":290,"correct":22},"施工段的数目应满足合理组织流水施工的要求",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":28,"analysis":33},931340,"某产品的实际成本为5000元，由六个零部件组成，其中一个零部件的实际成本为880元，功能评价系数为0.210，则该零部件的价值系数为( )。",[295,297,299,301],{"key":20,"text":296,"correct":26},"0.836",{"key":24,"text":298,"correct":26},"0.908",{"key":28,"text":300,"correct":22},"1.193",{"key":31,"text":302,"correct":26},"1.237",{"id":304,"libraryId":5,"type":36,"typeLabel":37,"stem":305,"options":306,"answer":317,"analysis":33},931341,"下列选项中，属于常用的抽样方法的是( )。",[307,309,311,313,315],{"key":20,"text":308,"correct":26},"对称随机抽样",{"key":24,"text":310,"correct":22},"简单随机抽样",{"key":28,"text":312,"correct":22},"分层随机抽样",{"key":31,"text":314,"correct":22},"周期系统抽样",{"key":49,"text":316,"correct":22},"分段随机抽样","BCDE",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":24,"analysis":33},931342,"在选择或分析测量系统时，首先我们关心的是测量系统的( )。",[322,324,326,328],{"key":20,"text":323,"correct":26},"准确度",{"key":24,"text":325,"correct":22},"分辨力",{"key":28,"text":327,"correct":26},"最小分度值",{"key":31,"text":329,"correct":26},"不易探测度",{"id":331,"libraryId":5,"type":36,"typeLabel":37,"stem":332,"options":333,"answer":344,"analysis":33},931343,"检验文件的基本内容包括( )。",[334,336,338,340,342],{"key":20,"text":335,"correct":22},"检验项目",{"key":24,"text":337,"correct":26},"文件编制原则",{"key":28,"text":339,"correct":22},"数据处理规则",{"key":31,"text":341,"correct":22},"合格判定准则",{"key":49,"text":343,"correct":22},"检验和试验记录","ACDE",{"id":346,"libraryId":5,"type":36,"typeLabel":37,"stem":347,"options":348,"answer":359,"analysis":33},931344,"不确定性分析主要包括( )。",[349,351,353,355,357],{"key":20,"text":350,"correct":22},"概率分析",{"key":24,"text":352,"correct":22},"敏感性分析",{"key":28,"text":354,"correct":26},"偿债能力分析",{"key":31,"text":356,"correct":22},"盈亏平衡分析",{"key":49,"text":358,"correct":26},"财务生存能力分析","ABD",{"id":361,"libraryId":5,"type":36,"typeLabel":37,"stem":362,"options":363,"answer":252,"analysis":33},931345,"故障树分析的主要用途包括( )。",[364,366,368,370,372],{"key":20,"text":365,"correct":22},"从安全的角度出发，比较各种设计方案；或者已确定了某种设计方案，评估是否满足了安全性要求",{"key":24,"text":367,"correct":22},"对于大型复杂系统，通过FTA可能发现由几个非致命的故障事件组合导致的意外致命事件。据此，采取相应的改进措施",{"key":28,"text":369,"correct":26},"估计事故的可能后果，寻求最经济的预防手段和方法",{"key":31,"text":371,"correct":22},"为制定使用、试验及维修程序提供依据",{"key":49,"text":373,"correct":22},"对于不曾参与系统设计的管理和使用人员来说，故障树为他们提供了一个形象管理、使用维修指南或查找故障的线索表",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":31,"analysis":33},931346,"对工作和工作之间的逻辑关系和工作持续时间都不确定的计划，可同时就费用、时间、效能三方面作综合分析，并对可能发生的风险作概率估计的网络计划技术是( )。",[378,380,382,384],{"key":20,"text":379,"correct":26},"关键线路法",{"key":24,"text":381,"correct":26},"计划评审技术",{"key":28,"text":383,"correct":26},"图示评审技术",{"key":31,"text":385,"correct":22},"风险评审技术",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":24,"analysis":33},931347,"按规定，建设工程四级重大质量事故应由( )归口管理。",[390,392,394,396],{"key":20,"text":391,"correct":26},"国务院",{"key":24,"text":393,"correct":22},"国家建设行政主管部门",{"key":28,"text":395,"correct":26},"省、自治区、直辖市建设行政主管部门",{"key":31,"text":397,"correct":26},"市、县级建设行政主管部门",{"id":399,"libraryId":5,"type":36,"typeLabel":37,"stem":400,"options":401,"answer":252,"analysis":33},931348,"( )等工程必须进行招标。",[402,404,406,408,410],{"key":20,"text":403,"correct":22},"大型基础设施、公用事业等关系社会公共利益、公共安全的项目",{"key":24,"text":405,"correct":22},"全部或部分使用国有资金投资或特殊工程项目",{"key":28,"text":407,"correct":26},"涉及国家安全、国家机密等特殊工程项目",{"key":31,"text":409,"correct":22},"使用国际组织或者外国政府贷款、援助资金的项目",{"key":49,"text":411,"correct":22},"属国家融资项目的范围",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":28,"analysis":33},931349,"某产品由 A、 B、 C、D四个零部件组成，进行价值工程对象选择时，它们的价值指数如下所示，则完全不需作为价值工程分析对象的是( )。",[416,418,420,422],{"key":20,"text":417,"correct":26},"1.8032",{"key":24,"text":419,"correct":26},"1.4246",{"key":28,"text":421,"correct":22},"1.0000",{"key":31,"text":423,"correct":26},"0.6419",{"id":425,"libraryId":5,"type":36,"typeLabel":37,"stem":426,"options":427,"answer":438,"analysis":33},931350,"具有6σ特色的质量改进模式(DMAI C)分为以下( )阶段实施。",[428,430,432,434,436],{"key":20,"text":429,"correct":22},"界定、测量",{"key":24,"text":431,"correct":22},"分析、改进",{"key":28,"text":433,"correct":22},"控制",{"key":31,"text":435,"correct":26},"设计",{"key":49,"text":437,"correct":26},"验证","ABC",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":28,"analysis":33},931351,"某项目进展到一半时，累计实际成本(A C)为200万元，挣值(EV)为220万元，完工预算(BA C)为450万元，假设项目将按预算单价完成ETC工作，则项目完工估算为( )万元。",[443,445,447,449],{"key":20,"text":444,"correct":26},"230",{"key":24,"text":446,"correct":26},"250",{"key":28,"text":448,"correct":22},"430",{"key":31,"text":450,"correct":26},"470",{"id":452,"libraryId":5,"type":36,"typeLabel":37,"stem":453,"options":454,"answer":465,"analysis":33},931352,"横道图计划具有( )优点。",[455,457,459,461,463],{"key":20,"text":456,"correct":22},"直观",{"key":24,"text":458,"correct":22},"简单明了",{"key":28,"text":460,"correct":22},"容易操作",{"key":31,"text":462,"correct":22},"容易掌握，便于理解",{"key":49,"text":464,"correct":26},"适用于大的进度计划系统","ABCD",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":20,"analysis":33},931353,"6σ管理的基本原则中，( )能消除部门及上下级间的障碍，促进组织内部横向和纵向的协作，营造一种真正密切合作的管理结构和环境，以达到满足顾客需求的目的。",[470,472,474,476],{"key":20,"text":471,"correct":22},"无边界合作",{"key":24,"text":473,"correct":26},"追求完美，容忍失误",{"key":28,"text":475,"correct":26},"真正以顾客为关注中心",{"key":31,"text":477,"correct":26},"聚焦于流程的改进和管理",{"id":479,"libraryId":5,"type":36,"typeLabel":37,"stem":480,"options":481,"answer":492,"analysis":33},931354,"进行投资估算时，流动资金估算的方法有( )。",[482,484,486,488,490],{"key":20,"text":483,"correct":22},"分项详细估算法",{"key":24,"text":485,"correct":26},"扩大单价法",{"key":28,"text":487,"correct":22},"扩大指标法",{"key":31,"text":489,"correct":26},"比例估算法",{"key":49,"text":491,"correct":26},"综合指标法","AC",{"id":494,"libraryId":5,"type":36,"typeLabel":37,"stem":33,"options":495,"answer":359,"analysis":33},931355,[496,498,500,502,504],{"key":20,"text":497,"correct":22},"工作m和n间的时间间隔",{"key":24,"text":499,"correct":22},"工作n的完成时间",{"key":28,"text":501,"correct":26},"工作m的开始时间",{"key":31,"text":503,"correct":22},"工作m和n搭接关系的时距",{"key":49,"text":505,"correct":26},"工作m的持续时间",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":28,"analysis":33},931356,"关键路径是( )。",[510,512,514,516],{"key":20,"text":511,"correct":26},"是项目中具有最高技术风险的最早的一系列事件和活动",{"key":24,"text":513,"correct":26},"是项目中具有最高成本的一系列事件和活动",{"key":28,"text":515,"correct":22},"如果按现有网络计划执行的话，是从现在到项目结束过程中具有最长链的一系列事件和活动",{"key":31,"text":517,"correct":26},"是一个有趣的概念，对于项目经理来说影响不大",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":28,"analysis":33},931357,"为了解组织的职业健康安全和环境的管理现状，在贯标培训后应进行的基础工作是( )",[522,524,526,528],{"key":20,"text":523,"correct":26},"领导决策",{"key":24,"text":525,"correct":26},"成立工作组",{"key":28,"text":527,"correct":22},"初始状态评审",{"key":31,"text":529,"correct":26},"系统策划与设计",{"id":531,"libraryId":5,"type":36,"typeLabel":37,"stem":532,"options":533,"answer":119,"analysis":33},931358,"项目技术经济分析中往往用利率作为衡量资金时间价值的相对尺度，其组成部分包括( )。",[534,536,538,540,542],{"key":20,"text":535,"correct":22},"对时间因素补偿",{"key":24,"text":537,"correct":26},"对空间因素的补偿",{"key":28,"text":539,"correct":26},"对环境因素的补偿",{"key":31,"text":541,"correct":22},"对风险因素的补偿",{"key":49,"text":543,"correct":22},"对通货膨胀因素的补偿",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":24,"analysis":33},931359,"下列关于标准型直方图的说法，不正确的是( )。",[548,550,552,554],{"key":20,"text":549,"correct":26},"两边低，中间高，左右对称",{"key":24,"text":551,"correct":22},"是由于操作者的心理因素和习惯引起",{"key":28,"text":553,"correct":26},"也称作对称型或正常型",{"key":31,"text":555,"correct":26},"可初步断定生产处于稳定过程",{"id":557,"libraryId":5,"type":36,"typeLabel":37,"stem":558,"options":559,"answer":359,"analysis":33},931360,"FMEA是一组系列化的活动，其目的是( )。",[560,562,564,566,568],{"key":20,"text":561,"correct":22},"发现并评价产品、过程中潜在的失效及其后果",{"key":24,"text":563,"correct":22},"采取能避免或减少这些潜在失效发生的措施",{"key":28,"text":565,"correct":26},"评估是否满足安全性要求",{"key":31,"text":567,"correct":22},"形成文件以便跟踪检验所采取措施的效果，便于不断改进",{"key":49,"text":371,"correct":26},{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":28,"analysis":33},931361,"监理工程师对施工进度控制的工作细则中所包括的内容有( )。",[573,575,577,579],{"key":20,"text":574,"correct":26},"明确划分施工段的要求",{"key":24,"text":576,"correct":26},"工程进度款支付的时间与方式",{"key":28,"text":578,"correct":22},"进度检查的周期与进度报表的格式",{"key":31,"text":580,"correct":26},"材料进场的时间与检验方式",{"id":582,"libraryId":5,"type":36,"typeLabel":37,"stem":583,"options":584,"answer":438,"analysis":33},931362,"凡列入强制性产品认证目录内的产品，必须经国家指定的认证机构认证合格、取得相关证书，并加施认证标志后，方能( )。",[585,587,589,591,593],{"key":20,"text":586,"correct":22},"出厂",{"key":24,"text":588,"correct":22},"进口",{"key":28,"text":590,"correct":22},"销售",{"key":31,"text":592,"correct":26},"使用",{"key":49,"text":594,"correct":26},"开始商务谈判",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":597,"answer":24,"analysis":33},931363,[598,600,602,604],{"key":20,"text":599,"correct":26},"3",{"key":24,"text":601,"correct":22},"4",{"key":28,"text":603,"correct":26},"5",{"key":31,"text":605,"correct":26},"6",{"id":607,"libraryId":5,"type":36,"typeLabel":37,"stem":33,"options":608,"answer":465,"analysis":33},931364,[609,611,613,615,617],{"key":20,"text":610,"correct":22},"工作B的总时差为3天",{"key":24,"text":612,"correct":22},"工作C的总时差为2天",{"key":28,"text":614,"correct":22},"工作D为关键工作",{"key":31,"text":616,"correct":22},"工作E的总时差为3天",{"key":49,"text":618,"correct":26},"工作G的自由时差为2天",{"id":620,"libraryId":5,"type":36,"typeLabel":37,"stem":621,"options":622,"answer":317,"analysis":33},931365,"下列选项中，属于检验和试验计划的是( )。",[623,625,627,629,631],{"key":20,"text":624,"correct":26},"检验通则",{"key":24,"text":626,"correct":22},"检验指导书",{"key":28,"text":628,"correct":22},"检验流程图",{"key":31,"text":630,"correct":22},"检验设备及其配置要求",{"key":49,"text":632,"correct":22},"检验人员的培训和资格认可",{"id":634,"libraryId":5,"type":15,"typeLabel":16,"stem":635,"options":636,"answer":28,"analysis":33},931366,"下列关于可靠性设计的说法，错误的是( )。",[637,639,641,643],{"key":20,"text":638,"correct":26},"为了达到产品的可靠性指标而进行的设计，称为可靠性设计",{"key":24,"text":640,"correct":26},"必须提高设计人员预测和预防故障的能力",{"key":28,"text":642,"correct":22},"只需考虑一般的设计特性",{"key":31,"text":644,"correct":26},"目的是尽可能降低产品在寿命周期内的总费用",{"id":646,"libraryId":5,"type":15,"typeLabel":16,"stem":647,"options":648,"answer":28,"analysis":33},931367,"某设备2010年购入，到2012年由于制造工艺改进，使该种设备制造成本降低，其市场价格也随之下降。那么，该设备遭受了( )。",[649,651,653,655],{"key":20,"text":650,"correct":26},"第一种有形磨损",{"key":24,"text":652,"correct":26},"第二种有形磨损",{"key":28,"text":654,"correct":22},"第一种无形磨损",{"key":31,"text":656,"correct":26},"第二种无形磨损",{"id":658,"libraryId":5,"type":36,"typeLabel":37,"stem":659,"options":660,"answer":492,"analysis":33},931368,"已知网络计划中某工作只有一项紧后工作，该紧后工作的最早开始时间为第9天，本工作的最早开始时间和最迟开始时间分别为第4天和第10天。如果本工作的持续时间为3天，则其( )。",[661,663,665,667,669],{"key":20,"text":662,"correct":22},"总时差为6天",{"key":24,"text":664,"correct":26},"自由时差为1天",{"key":28,"text":666,"correct":22},"自由时差为2天",{"key":31,"text":668,"correct":26},"与紧后工作之间的时间间隔为1天",{"key":49,"text":670,"correct":26},"总时差为5天",{"id":672,"libraryId":5,"type":15,"typeLabel":16,"stem":673,"options":674,"answer":28,"analysis":33},931369,"对抽样方法而言，应考虑元素的隶属关系和层次关系的抽样方法是( )。",[675,676,677,678],{"key":20,"text":310,"correct":26},{"key":24,"text":314,"correct":26},{"key":28,"text":316,"correct":22},{"key":31,"text":679,"correct":26},"整群随机抽样",[681,684,687,690,693,696],{"id":15,"name":682,"category":7,"favorite":683},"领导干部任职前廉政法规知识测试题",92,{"id":685,"name":686,"category":7,"favorite":15},595,"建筑结构与设备",{"id":688,"name":689,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":691,"name":692,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":694,"name":695,"category":7,"favorite":8},534,"BIM工程师",{"id":697,"name":695,"category":7,"favorite":8},535]