[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-603-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":623},{"id":5,"name":6,"category":7,"favorite":8},603,"质量、投资、进度控制","建筑工程",0,6,50,656,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,225,236,248,260,272,284,296,308,320,332,340,352,363,375,387,399,411,423,435,443,455,462,474,486,498,510,522,540,555,569,581,596,608],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},931270,1,"单选题","某公司向银行借款，贷款年利率为6％。第1年初借款100万元，每年计息一次；第2年末又借款200万元，每半年计息一次，两笔借款均在第3年末还本付息，则复本利和为( )万元。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","324.54",false,{"key":24,"text":25,"correct":22},"B","331.10",{"key":27,"text":28,"correct":29},"C","331.28",true,{"key":31,"text":32,"correct":22},"D","343.82","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},931271,"我国增值税条例规定，从国外进口的设备，其增值税按( )计算其应纳税额。",[38,40,42,44],{"key":20,"text":39,"correct":22},"离岸价",{"key":24,"text":41,"correct":22},"到岸价",{"key":27,"text":43,"correct":22},"抵岸价",{"key":31,"text":45,"correct":29},"组成计税价格",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},931272,"x增大时，y也随之增大，但增幅不显著，此类型散布图为( )。",[50,52,54,56],{"key":20,"text":51,"correct":22},"正相关",{"key":24,"text":53,"correct":22},"负相关",{"key":27,"text":55,"correct":22},"曲线相关",{"key":31,"text":57,"correct":29},"非显著性正相关",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},931273,"网络计划工期优化的前提是( )。",[62,64,66,68],{"key":20,"text":63,"correct":22},"满足资源有限条件",{"key":24,"text":65,"correct":22},"不改变各项工作之间的逻辑关系",{"key":27,"text":67,"correct":22},"压缩关键工作工期使之成为非关键工作",{"key":31,"text":69,"correct":29},"压缩关键工作工期但保持其仍为关键工作",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},931274,"某公司拟投资一项目，希望在4年内(含建设期)收回全部贷款的本金与利息。预计项目从第1年开始每年末能获得60万元，银行贷款年利率为6％。则项目总投资的现值应控制在( )万元以下。",[74,76,78,80],{"key":20,"text":75,"correct":22},"262.48",{"key":24,"text":77,"correct":29},"207.91",{"key":27,"text":79,"correct":22},"75.75",{"key":31,"text":81,"correct":22},"240.00",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},931275,"以下关于接收概率的说法，正确的是( )。",[86,88,90,92],{"key":20,"text":87,"correct":22},"接收概率是批不合格率p的函数，随着p的增大而减小",{"key":24,"text":89,"correct":22},"接收概率是批不合格率p的函数，随着p的增大而增大",{"key":27,"text":91,"correct":29},"接收概率是批不合格品率p的函数，随着p的增大而减小",{"key":31,"text":93,"correct":22},"接收概率是批不合格品率p的函数，随着p的增大而增大",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},931276,"下列关于单代号网络图的说法，正确的是( )。",[98,100,102,104],{"key":20,"text":99,"correct":29},"箭线表示工作之间逻辑关系",{"key":24,"text":101,"correct":22},"单代号网络图不存在虚拟工作",{"key":27,"text":103,"correct":22},"节点不占用任何时间和资源",{"key":31,"text":105,"correct":22},"节点表示工作之间的联结",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},931277,"已知工作A的紧后工作是B和 C，工作B的最迟开始时间为14，最开始时间为10；工作C的最迟完成时间为16，最早完成时间为14；工作A的自由时差为5天，则工作A的总时差为( )天。",[110,112,114,116],{"key":20,"text":111,"correct":29},"5",{"key":24,"text":113,"correct":22},"7",{"key":27,"text":115,"correct":22},"9",{"key":31,"text":117,"correct":22},"11",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},931278,"在搭接网络计划中，终点节点一般都表示( )。",[122,124,126,128],{"key":20,"text":123,"correct":22},"实际工作",{"key":24,"text":125,"correct":29},"虚拟工作",{"key":27,"text":127,"correct":22},"计划工期",{"key":31,"text":129,"correct":22},"实际工期",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},931279,"指导检验人员实施检验操作的基本依据是( )。",[134,136,138,140],{"key":20,"text":135,"correct":22},"取样方法",{"key":24,"text":137,"correct":22},"抽样方案",{"key":27,"text":139,"correct":29},"检验和试验文件",{"key":31,"text":141,"correct":22},"检验和试验方法",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},931280,"在某工程双代号网络计划中，工作M的最早开始时间为第15天，其持续时间为7天。该工作有两项紧后工作，它们的最早开始时间分别为第27天和第30天，最迟开始时间分别为第28天和第33天，则工作M的总时差和自由时差( )天。",[146,148,150,152],{"key":20,"text":147,"correct":22},"均为5",{"key":24,"text":149,"correct":29},"分别为6和5",{"key":27,"text":151,"correct":22},"均为6",{"key":31,"text":153,"correct":22},"分别为11和6",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":27,"analysis":33},931281,"工程开工申请报告应由( )向当地建设主管部门申请。",[158,160,162,164],{"key":20,"text":159,"correct":22},"施工单位",{"key":24,"text":161,"correct":22},"监理单位",{"key":27,"text":163,"correct":29},"业主",{"key":31,"text":165,"correct":22},"业主会同施工单位",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":27,"analysis":33},931282,"质量屋的构建程序中，首要步骤是( )。",[170,172,174,176],{"key":20,"text":171,"correct":22},"判定内部信息、市场信息是否充分",{"key":24,"text":173,"correct":22},"调查市场要求项目重要性",{"key":27,"text":175,"correct":29},"确定研究对象",{"key":31,"text":177,"correct":22},"确定设计质量",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},931283,"收集和整理产品的质量数据，常用的方法有抽样法和( )。",[182,184,186,188],{"key":20,"text":183,"correct":29},"试验法",{"key":24,"text":185,"correct":22},"分析法",{"key":27,"text":187,"correct":22},"统计法",{"key":31,"text":189,"correct":22},"分类法",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},931284,"ISO 9000：2005《质量管理体系基础和术语》的内容不包括( )。",[194,196,198,200],{"key":20,"text":195,"correct":22},"八项质量管理原则",{"key":24,"text":197,"correct":22},"十二项质量管理体系基础",{"key":27,"text":199,"correct":22},"术语和定义",{"key":31,"text":201,"correct":29},"质量检验方法",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},931285,"进行投资项目方案经济比选时，寿命期不等的互斥方案可以直接采用的比选方法有( )。",[206,208,210,212],{"key":20,"text":207,"correct":29},"净年值法",{"key":24,"text":209,"correct":22},"差额投资内部收益率法",{"key":27,"text":211,"correct":22},"净现值法",{"key":31,"text":213,"correct":22},"费用现值法",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":216,"answer":31,"analysis":33},931286,[217,219,221,223],{"key":20,"text":218,"correct":22},"左侧，表明此时实际进度比计划进度拖后60t",{"key":24,"text":220,"correct":22},"右侧，表明此时实际进度比计划进度超前60t",{"key":27,"text":222,"correct":22},"左侧，表明此时实际进度比计划进度超前50t",{"key":31,"text":224,"correct":29},"右侧，表明此时实际进度比计划进度拖后50t",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":227,"answer":31,"analysis":33},931287,[228,230,232,234],{"key":20,"text":229,"correct":22},"20％W；5％",{"key":24,"text":231,"correct":22},"21％W；20％",{"key":27,"text":233,"correct":22},"25％W；35％",{"key":31,"text":235,"correct":29},"26％W；50％",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":31,"analysis":33},931288,"监理工程师控制建设工程进度的技术措施是指( )。",[240,242,244,246],{"key":20,"text":241,"correct":22},"建立工程进度报告制度及进度信息沟通网络",{"key":24,"text":243,"correct":22},"协调合同工期与进度计划之间的关系",{"key":27,"text":245,"correct":22},"加强风险管理，预测风险因素并提出预防措施",{"key":31,"text":247,"correct":29},"审查承包商提交的进度计划，使承包商在合理的状态下施工",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":20,"analysis":33},931289,"( )方法的特点是：每个样本单位被抽中的概率相等，样本的每个单位完全独立，彼此之间无一定的关联性和排斥性。",[252,254,256,258],{"key":20,"text":253,"correct":29},"简单随机抽样",{"key":24,"text":255,"correct":22},"分层随机抽样",{"key":27,"text":257,"correct":22},"周期系统抽样",{"key":31,"text":259,"correct":22},"随机抽样",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":24,"analysis":33},931290,"按照施工过程中实施见证取样的要求，监理机构中负责见证取样工作的人员一般为( )。",[264,266,268,270],{"key":20,"text":265,"correct":22},"监理员",{"key":24,"text":267,"correct":29},"专业监理工程师",{"key":27,"text":269,"correct":22},"总监理工程师代表",{"key":31,"text":271,"correct":22},"总监理工程师",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":31,"analysis":33},931291,"( )反映过程加工中质量满足产品技术要求的程度，也即产品的控制范围满足顾客要求的程度。",[276,278,280,282],{"key":20,"text":277,"correct":22},"标准差",{"key":24,"text":279,"correct":22},"技术要求",{"key":27,"text":281,"correct":22},"过程能力",{"key":31,"text":283,"correct":29},"过程能力指数",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":24,"analysis":33},931292,"要想使现在的1000元与10年后的2000元成为等值，复利年利率为( )。",[288,290,292,294],{"key":20,"text":289,"correct":22},"7.34%",{"key":24,"text":291,"correct":29},"7.18%",{"key":27,"text":293,"correct":22},"7.45%",{"key":31,"text":295,"correct":22},"7.67%",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":20,"analysis":33},931293,"设备工程投资控制的原则中不包括( )。",[300,302,304,306],{"key":20,"text":301,"correct":29},"投资最低原则",{"key":24,"text":303,"correct":22},"主动控制原则",{"key":27,"text":305,"correct":22},"技术与经济相结合原则",{"key":31,"text":307,"correct":22},"令人满意原则",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":27,"analysis":33},931294,"工程建设物资供应计划的编制依据之一是( )。",[312,314,316,318],{"key":20,"text":313,"correct":22},"物资加工计划",{"key":24,"text":315,"correct":22},"物资采购计划",{"key":27,"text":317,"correct":29},"物资储备计划",{"key":31,"text":319,"correct":22},"物资运输计划",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":24,"analysis":33},931295,"下列关于实际进度与计划进度进行比较的横道图比较法的说法，正确的是( )。",[324,326,328,330],{"key":20,"text":325,"correct":22},"能反映工程的关键线路",{"key":24,"text":327,"correct":29},"适用于各项工作为匀速或非匀速的情况",{"key":27,"text":329,"correct":22},"能对后期工程的进展进行准确预测",{"key":31,"text":331,"correct":22},"需要利用总时差对总体进展进行分析",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":20,"analysis":33},931296,"通常只是在总体单位之间差异程度较小和数目较少时，才采用( )。",[336,337,338,339],{"key":20,"text":253,"correct":29},{"key":24,"text":255,"correct":22},{"key":27,"text":257,"correct":22},{"key":31,"text":259,"correct":22},{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":31,"analysis":33},931297,"在计数型控制图中，u图是指( )。",[344,346,348,350],{"key":20,"text":345,"correct":22},"不合格品率控制图",{"key":24,"text":347,"correct":22},"不合格品数控制图",{"key":27,"text":349,"correct":22},"不合格数控制图",{"key":31,"text":351,"correct":29},"单位产品不合格数控制图",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":354,"answer":20,"analysis":33},931298,[355,357,359,361],{"key":20,"text":356,"correct":29},"55.70",{"key":24,"text":358,"correct":22},"140.00",{"key":27,"text":360,"correct":22},"86.40",{"key":31,"text":362,"correct":22},"71.06",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":24,"analysis":33},931299,"( )是指单位产品重要的质量特性不符合规定，或单位产品的质量特性严重不符合规定。",[367,369,371,373],{"key":20,"text":368,"correct":22},"A类不合格",{"key":24,"text":370,"correct":29},"B类不合格",{"key":27,"text":372,"correct":22},"C类不合格",{"key":31,"text":374,"correct":22},"A类不合格品",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":20,"analysis":33},931300,"制定职业健康安全方针是组织在职业健康安全领域的( )。",[379,381,383,385],{"key":20,"text":380,"correct":29},"最高纲领和行动指南",{"key":24,"text":382,"correct":22},"推动力",{"key":27,"text":384,"correct":22},"准则",{"key":31,"text":386,"correct":22},"前提",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":20,"analysis":33},931301,"在资源有限-工期最短优化中，在超过资源限量的时段，应将( )，以减少该时段每天资源需要用量。",[391,393,395,397],{"key":20,"text":392,"correct":29},"最迟开始时间最大的工作移到最早完成时间最小的工作之后",{"key":24,"text":394,"correct":22},"最迟开始时间最小的工作移到最早完成时间最大的工作之后",{"key":27,"text":396,"correct":22},"最迟开始时间最大的工作移到最早完成时间最大的工作之后",{"key":31,"text":398,"correct":22},"最迟开始时间最小的工作移到最早完成时间最小的工作之后",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":24,"analysis":33},931302,"建立故障树的基本程序不包括( )。",[403,405,407,409],{"key":20,"text":404,"correct":22},"情况分析",{"key":24,"text":406,"correct":29},"确定初始事件",{"key":27,"text":408,"correct":22},"简化系统图",{"key":31,"text":410,"correct":22},"从上而下逐级建立故障树",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":20,"analysis":33},931303,"以下关于测量值质量的说法，错误的是( )。",[415,417,419,421],{"key":20,"text":416,"correct":29},"测量值质量越高越好",{"key":24,"text":418,"correct":22},"方差表征测量值的分布",{"key":27,"text":420,"correct":22},"提倡测量值质量符合使用要求即可",{"key":31,"text":422,"correct":22},"偏倚是指测量值的平均值相对标准值的位置",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":31,"analysis":33},931304,"在设备制造过程质量监理工作中，对于文件见证点，设备监理工程师主要见证制造厂提供的( )等文件资料。",[427,429,431,433],{"key":20,"text":428,"correct":22},"体系文件",{"key":24,"text":430,"correct":22},"装箱清单",{"key":27,"text":432,"correct":22},"该设备的出厂合格证",{"key":31,"text":434,"correct":29},"检验记录",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":437,"answer":27,"analysis":33},931305,[438,440,441,442],{"key":20,"text":439,"correct":22},"2",{"key":24,"text":111,"correct":22},{"key":27,"text":113,"correct":29},{"key":31,"text":115,"correct":22},{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":20,"analysis":33},931306,"在设备工程中使用的加工制造设备或安装设备，应保证只使用经过( )的设备，并在使用过程中保持其完好。",[447,449,451,453],{"key":20,"text":448,"correct":29},"验证并批准",{"key":24,"text":450,"correct":22},"验收和审批",{"key":27,"text":452,"correct":22},"审核和认证",{"key":31,"text":454,"correct":22},"检查并认证",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":457,"answer":20,"analysis":33},931307,[458,459,460,461],{"key":20,"text":33,"correct":29},{"key":24,"text":33,"correct":22},{"key":27,"text":33,"correct":22},{"key":31,"text":33,"correct":22},{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":24,"analysis":33},931308,"某一价值工程对象的整体功能成本为3000元，其中某部件的功能评价系数为0.2，其现实成本为800元，则该部件功能成本改进的期望值是( )元。",[466,468,470,472],{"key":20,"text":467,"correct":22},"-160",{"key":24,"text":469,"correct":29},"-200",{"key":27,"text":471,"correct":22},"-400",{"key":31,"text":473,"correct":22},"-600",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":20,"analysis":33},931309,"在双代号网络图中，如果某工作的完成节点为关键节点，则该工作( )。",[478,480,482,484],{"key":20,"text":479,"correct":29},"总时差等于自由时差",{"key":24,"text":481,"correct":22},"总时差大于等于自由时差",{"key":27,"text":483,"correct":22},"总时差小于自由时差",{"key":31,"text":485,"correct":22},"总时差与自由时差无关",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":27,"analysis":33},931310,"确定初选仪器的分辨力时，统计特性变差为0.01，仪器应能读取( )的变化。",[490,492,494,496],{"key":20,"text":491,"correct":22},"0.1",{"key":24,"text":493,"correct":22},"0.01",{"key":27,"text":495,"correct":29},"0.001",{"key":31,"text":497,"correct":22},"0.005",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":31,"analysis":33},931311,"质量特性的统计量一旦落在6σ之外，根据( )，那么此时一定出现了特殊原因，过程失控，应予纠正。",[502,504,506,508],{"key":20,"text":503,"correct":22},"数据分布假设",{"key":24,"text":505,"correct":22},"6σ准则",{"key":27,"text":507,"correct":22},"小概率事件不发生原则",{"key":31,"text":509,"correct":29},"统计反证推论",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":24,"analysis":33},931312,"设备从投入使用开始，到因物质磨损而不能继续使用、报废为止所经历的全部时间，被称为设备的( )。",[514,516,518,520],{"key":20,"text":515,"correct":22},"技术寿命",{"key":24,"text":517,"correct":29},"物理寿命",{"key":27,"text":519,"correct":22},"经济寿命",{"key":31,"text":521,"correct":22},"无形寿命",{"id":523,"libraryId":5,"type":524,"typeLabel":525,"stem":526,"options":527,"answer":539,"analysis":33},931313,2,"多选题","下列指标中，属于项目动态财务评价指标的有( )。",[528,530,532,534,536],{"key":20,"text":529,"correct":22},"利息备付率",{"key":24,"text":531,"correct":29},"财务内部收益率",{"key":27,"text":533,"correct":22},"资产负债率",{"key":31,"text":535,"correct":29},"财务净现值",{"key":537,"text":538,"correct":22},"E","偿债备付率","BD",{"id":541,"libraryId":5,"type":524,"typeLabel":525,"stem":542,"options":543,"answer":554,"analysis":33},931314,"对检验中发现的不合格品，要慎重处理让步或回用。进行评审时，依据的原则有( )。",[544,546,548,550,552],{"key":20,"text":545,"correct":29},"关键特性不能让步，重要特性不宜让步",{"key":24,"text":547,"correct":29},"即使让步，要明确让步偏差",{"key":27,"text":549,"correct":29},"即使让步，要明确让步数量和时间",{"key":31,"text":551,"correct":22},"即使让步，也只限于进货检验",{"key":537,"text":553,"correct":22},"即使让步，只适合于最终检验","ABC",{"id":556,"libraryId":5,"type":524,"typeLabel":525,"stem":557,"options":558,"answer":568,"analysis":33},931315,"项目评价常用的基准收益率确定方法有( )",[559,560,562,564,566],{"key":20,"text":211,"correct":22},{"key":24,"text":561,"correct":29},"项目收益法",{"key":27,"text":563,"correct":29},"加权平均资金成本法",{"key":31,"text":565,"correct":29},"零风险回报率法",{"key":537,"text":567,"correct":22},"内部收益率法","BCD",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":27,"analysis":33},931316,"( )应是质量功能展开项目的研究重点。",[573,575,577,579],{"key":20,"text":574,"correct":22},"分析产品质量可行性",{"key":24,"text":576,"correct":22},"分析产品功能构成",{"key":27,"text":578,"correct":29},"分析顾客的需求",{"key":31,"text":580,"correct":22},"分析质量展开成本",{"id":582,"libraryId":5,"type":524,"typeLabel":525,"stem":583,"options":584,"answer":595,"analysis":33},931317,"下列关于横道图与“香蕉”曲线综合比较法的说法，正确的有( )",[585,587,589,591,593],{"key":20,"text":586,"correct":29},"能同时反映工程局部和总体进展状况",{"key":24,"text":588,"correct":22},"只能反映工程局部进展状况",{"key":27,"text":590,"correct":22},"只能反映工程总体进展状况",{"key":31,"text":592,"correct":29},"能反映工程实际与计划总的完成情况",{"key":537,"text":594,"correct":29},"横道图和“香蕉”曲线绘制于同一图中","ADE",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":27,"analysis":33},931318,"在进行线性盈亏平衡分析时，若其他条件不变，仅产品售价提高，则盈亏平衡点会( )。",[600,602,604,606],{"key":20,"text":601,"correct":22},"不变",{"key":24,"text":603,"correct":22},"上升",{"key":27,"text":605,"correct":29},"下降",{"key":31,"text":607,"correct":22},"无法确定",{"id":609,"libraryId":5,"type":524,"typeLabel":525,"stem":610,"options":611,"answer":622,"analysis":33},931319,"下列关于价值工程理论的说法，正确的有( )。",[612,614,616,618,620],{"key":20,"text":613,"correct":22},"价值工程强调以较低的生产成本来实现必要功能",{"key":24,"text":615,"correct":22},"价值工程的核心是功能分析",{"key":27,"text":617,"correct":29},"价值工程的目的是提高产品或作业的功能",{"key":31,"text":619,"correct":22},"价值工程进行方案评价时，衡量方案优劣的标准是经济效果的高低",{"key":537,"text":621,"correct":29},"价值工程理论中的“价值”是指产品或作业具有的功能与获取该功能的寿命周期成本的比值","CE",[624,627,630,633,636,639],{"id":15,"name":625,"category":7,"favorite":626},"领导干部任职前廉政法规知识测试题",92,{"id":628,"name":629,"category":7,"favorite":15},595,"建筑结构与设备",{"id":631,"name":632,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":634,"name":635,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":637,"name":638,"category":7,"favorite":8},534,"BIM工程师",{"id":640,"name":638,"category":7,"favorite":8},535]