[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-603-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":651},{"id":5,"name":6,"category":7,"favorite":8},603,"质量、投资、进度控制","建筑工程",0,5,50,656,[13,33,51,63,78,90,102,117,129,143,151,166,181,193,207,219,233,244,256,270,282,296,308,322,337,348,362,374,388,399,411,423,430,444,456,471,486,498,512,524,538,548,560,572,584,596,608,620,631,639],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":17},931220,1,"单选题","",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","2天和1天",false,{"key":24,"text":25,"correct":22},"B","3天和O天",{"key":27,"text":28,"correct":29},"C","1天和0天",true,{"key":31,"text":32,"correct":22},"D","3天和1天",{"id":34,"libraryId":5,"type":35,"typeLabel":36,"stem":37,"options":38,"answer":50,"analysis":17},931221,2,"多选题","实际进度与计划进度的比较方法通常有( )。",[39,41,43,45,47],{"key":20,"text":40,"correct":29},"前锋线比较法",{"key":24,"text":42,"correct":29},"横道图比较法",{"key":27,"text":44,"correct":29},"S形曲线比较法",{"key":31,"text":46,"correct":22},"排列图比较法",{"key":48,"text":49,"correct":29},"E","“香蕉”曲线比较法","ABCE",{"id":52,"libraryId":5,"type":15,"typeLabel":16,"stem":53,"options":54,"answer":27,"analysis":17},931222,"ISO 9000族标准体系制定的理论基础是( )。",[55,57,59,61],{"key":20,"text":56,"correct":22},"6σ管理原则",{"key":24,"text":58,"correct":22},"质量管理体系基础",{"key":27,"text":60,"correct":29},"八项质量管理原则",{"key":31,"text":62,"correct":22},"质量管理体系方法",{"id":64,"libraryId":5,"type":35,"typeLabel":36,"stem":65,"options":66,"answer":77,"analysis":17},931223,"审查单位工程设计概算时，建筑工程概算的审查内容有( )。",[67,69,71,73,75],{"key":20,"text":68,"correct":29},"材料预算价格",{"key":24,"text":70,"correct":29},"审查不够全面",{"key":27,"text":72,"correct":22},"审查效果不太好",{"key":31,"text":74,"correct":29},"审查速度快",{"key":48,"text":76,"correct":22},"工作量小","ABD",{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":31,"analysis":17},931224,"竣工决算中，作为无形资产入帐的是( )。",[82,84,86,88],{"key":20,"text":83,"correct":22},"政府无偿划拨的土地使用权",{"key":24,"text":85,"correct":22},"开办费",{"key":27,"text":87,"correct":22},"广告宣传费",{"key":31,"text":89,"correct":29},"土地使用权",{"id":91,"libraryId":5,"type":15,"typeLabel":16,"stem":92,"options":93,"answer":27,"analysis":17},931225,"某项目向银行借款1000万元，年利率为10%，5年后一次偿还本利和，则5年后需偿还的金额为( )万元。",[94,96,98,100],{"key":20,"text":95,"correct":22},"1450",{"key":24,"text":97,"correct":22},"1500",{"key":27,"text":99,"correct":29},"1610.51",{"key":31,"text":101,"correct":22},"1683.67",{"id":103,"libraryId":5,"type":35,"typeLabel":36,"stem":104,"options":105,"answer":116,"analysis":17},931226,"下列关于增量净现值的说法，正确的有( )。",[106,108,110,112,114],{"key":20,"text":107,"correct":22},"可以用于寿命期不等的互斥方案比选",{"key":24,"text":109,"correct":29},"可以用于寿命期相等的互斥方案比选",{"key":27,"text":111,"correct":29},"不能直接用于独立方案选择",{"key":31,"text":113,"correct":22},"若两方案之间的增量净现值大于零，则表明投资大的项目肯定可行",{"key":48,"text":115,"correct":29},"若两方案之间的增量净现值大于零，则表明投资大的项目优于投资小的项目","BCE",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":24,"analysis":17},931227,"对于计件的质量特性而言，产品当前的质量水平常用( )表示。",[121,123,125,127],{"key":20,"text":122,"correct":22},"平均值",{"key":24,"text":124,"correct":29},"过程平均",{"key":27,"text":126,"correct":22},"不合格数",{"key":31,"text":128,"correct":22},"不合格品数",{"id":130,"libraryId":5,"type":35,"typeLabel":36,"stem":131,"options":132,"answer":50,"analysis":17},931228,"因果图的应用过程包括( )。",[133,135,137,139,141],{"key":20,"text":134,"correct":29},"明确、扼要地确定工程设备结果",{"key":24,"text":136,"correct":29},"寻找主要可能原因",{"key":27,"text":138,"correct":29},"如环境、能源等以及数据信息系统等方面原因",{"key":31,"text":140,"correct":22},"确定对策",{"key":48,"text":142,"correct":29},"寻找类别原因的下一层次原因",{"id":144,"libraryId":5,"type":15,"typeLabel":16,"stem":145,"options":146,"answer":27,"analysis":17},931229,"在其他条件相同的情况下，考虑资金的时间价值时，下列现金流量图中效益最好的是( )。",[147,148,149,150],{"key":20,"text":17,"correct":22},{"key":24,"text":17,"correct":22},{"key":27,"text":17,"correct":29},{"key":31,"text":17,"correct":22},{"id":152,"libraryId":5,"type":35,"typeLabel":36,"stem":153,"options":154,"answer":165,"analysis":17},931230,"下列关于控制图的描述中，表明生产过程异常的有( )。",[155,157,159,161,163],{"key":20,"text":156,"correct":29},"连续7个点出现在中心线一侧",{"key":24,"text":158,"correct":22},"数据的平均值稍偏离中间值的位置",{"key":27,"text":160,"correct":29},"连续7个点上升",{"key":31,"text":162,"correct":29},"连续7个点下降",{"key":48,"text":164,"correct":29},"上升或下降有一定间隔重复的规律","ACDE",{"id":167,"libraryId":5,"type":35,"typeLabel":36,"stem":168,"options":169,"answer":180,"analysis":17},931231,"下列关于设备寿命的说法，正确的有( )。",[170,172,174,176,178],{"key":20,"text":171,"correct":22},"设备的经济寿命就是指其折旧寿命",{"key":24,"text":173,"correct":29},"设备的技术寿命一般会比物理寿命短",{"key":27,"text":175,"correct":29},"设备的物理寿命由其有形磨损情况所决定",{"key":31,"text":177,"correct":29},"设备的技术寿命由其无形磨损情况决定",{"key":48,"text":179,"correct":22},"在设备经济寿命前更新设备，在经济上都是合理的","BCD",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":20,"analysis":17},931232,"与横道图相比，网络计划的优点是能够( )。",[185,187,189,191],{"key":20,"text":186,"correct":29},"明确表达各项工作之间的逻辑关系",{"key":24,"text":188,"correct":22},"直观表达工程进度计划的计算工期",{"key":27,"text":190,"correct":22},"明确表达各项工作之间的搭接时间",{"key":31,"text":192,"correct":22},"直观表达各项工作的持续时间",{"id":194,"libraryId":5,"type":35,"typeLabel":36,"stem":17,"options":195,"answer":206,"analysis":17},931233,[196,198,200,202,204],{"key":20,"text":197,"correct":22},"以关键节点组成的线路一定为关键线路",{"key":24,"text":199,"correct":22},"关键节点之间的工作一定为关键工作",{"key":27,"text":201,"correct":29},"关键节点的最早时间和最迟时间一定相等",{"key":31,"text":203,"correct":22},"以关键节点为完成节点的工作的总时差和自由时差一定为零",{"key":48,"text":205,"correct":29},"关键工作的总时差和自由时差一定为零","CE",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":20,"analysis":17},931234,"某道路工程在进行基层和面层施工时，为了给面层铺设提供工作面和工作条件，需待基层铺设一定时间后才能进行面层摊铺，这种时间间隔是( )时距。",[211,213,215,217],{"key":20,"text":212,"correct":29},"STS",{"key":24,"text":214,"correct":22},"FTF",{"key":27,"text":216,"correct":22},"STF",{"key":31,"text":218,"correct":22},"FTS",{"id":220,"libraryId":5,"type":35,"typeLabel":36,"stem":221,"options":222,"answer":116,"analysis":17},931235,"在竣工决算中，属于新增固定资产价值的有( )。",[223,225,227,229,231],{"key":20,"text":224,"correct":22},"生产准备费",{"key":24,"text":226,"correct":29},"建设单位管理费",{"key":27,"text":228,"correct":29},"研究试验费",{"key":31,"text":230,"correct":22},"土地使用权出让金",{"key":48,"text":232,"correct":29},"工程监理费",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":235,"answer":24,"analysis":17},931236,[236,238,240,242],{"key":20,"text":237,"correct":22},"1",{"key":24,"text":239,"correct":29},"2",{"key":27,"text":241,"correct":22},"3",{"key":31,"text":243,"correct":22},"4",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":27,"analysis":17},931237,"下列关于可靠性的表述，错误的是( )。",[248,250,252,254],{"key":20,"text":249,"correct":22},"是产品的一种质量指标",{"key":24,"text":251,"correct":22},"是一项包括管理和技术的综合技术",{"key":27,"text":253,"correct":29},"同一般质量指标的区别在于它是一种空间质量指标",{"key":31,"text":255,"correct":22},"基础范围相当广",{"id":257,"libraryId":5,"type":35,"typeLabel":36,"stem":17,"options":258,"answer":269,"analysis":17},931238,[259,261,263,265,267],{"key":20,"text":260,"correct":29},"该工作提前1周完成；",{"key":24,"text":262,"correct":29},"在第7周内实际完成的任务量超过计划任务量；",{"key":27,"text":264,"correct":29},"第四周停工1周；",{"key":31,"text":266,"correct":22},"在第3周内实际完成的任务量比计划任务量少6%；",{"key":48,"text":268,"correct":22},"在第5周内实际进度与计划进度一致。","ABC",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":24,"analysis":17},931239,"目前我国设备运输中业主选择保险公司最常见的方式为( )。",[274,276,278,280],{"key":20,"text":275,"correct":22},"公开招标",{"key":24,"text":277,"correct":29},"直接谈判",{"key":27,"text":279,"correct":22},"邀请招标",{"key":31,"text":281,"correct":22},"国际招标",{"id":283,"libraryId":5,"type":35,"typeLabel":36,"stem":284,"options":285,"answer":77,"analysis":17},931240,"设备采购是直接影响设备质量的关键环节，属于签订设备采购合同前的工作程序有( )。",[286,288,290,292,294],{"key":20,"text":287,"correct":29},"编制采购计划",{"key":24,"text":289,"correct":29},"确定合格供货厂商",{"key":27,"text":291,"correct":22},"调整采购进度计划",{"key":31,"text":293,"correct":29},"编制询价文件及报价评审",{"key":48,"text":295,"correct":22},"设备及散材的检验、监制",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":24,"analysis":17},931241,"网络计划中资源优化“工期固定资源均衡”的含义是指( )。",[300,302,304,306],{"key":20,"text":301,"correct":22},"资源有限条件下的最短工期安排",{"key":24,"text":303,"correct":29},"工期不变条件下的资源均衡安排",{"key":27,"text":305,"correct":22},"工期最短条件下的资源均衡安排",{"key":31,"text":307,"correct":22},"工期最优条件下的资源均衡安排",{"id":309,"libraryId":5,"type":35,"typeLabel":36,"stem":310,"options":311,"answer":269,"analysis":17},931242,"一般来说，职业健康安全与环境管理体系文件应包括( )。",[312,314,316,318,320],{"key":20,"text":313,"correct":29},"管理手册",{"key":24,"text":315,"correct":29},"管理体系程序",{"key":27,"text":317,"correct":29},"管理体系其他文件(作业指导书、表格、报告和记录等)",{"key":31,"text":319,"correct":22},"3C认证",{"key":48,"text":321,"correct":22},"产品容差标准",{"id":323,"libraryId":5,"type":35,"typeLabel":36,"stem":324,"options":325,"answer":336,"analysis":17},931243,"S形曲线图中，纵坐标表示任务量完成情况，任务量可以用( )表达。",[326,328,330,332,334],{"key":20,"text":327,"correct":22},"人员使用量",{"key":24,"text":329,"correct":29},"实物工程量",{"key":27,"text":331,"correct":29},"工时消耗",{"key":31,"text":333,"correct":29},"累计完成任务量百分比",{"key":48,"text":335,"correct":29},"费用支出额","BCDE",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":339,"answer":31,"analysis":17},931244,[340,342,344,346],{"key":20,"text":341,"correct":22},"工作的计划进度为匀速施工",{"key":24,"text":343,"correct":22},"工作的实际进度拖后2天",{"key":27,"text":345,"correct":22},"工作实际开始时间比计划晚1天",{"key":31,"text":347,"correct":29},"第7天内实际与计划完成的任务量相同",{"id":349,"libraryId":5,"type":35,"typeLabel":36,"stem":350,"options":351,"answer":180,"analysis":17},931245,"设备工程进度监测系统包括( )等过程。",[352,354,356,358,360],{"key":20,"text":353,"correct":22},"对工程进度计划进行优化",{"key":24,"text":355,"correct":29},"实际进度数据采集",{"key":27,"text":357,"correct":29},"实际进度与计划进度对比分析",{"key":31,"text":359,"correct":29},"实际进度数据处理",{"key":48,"text":361,"correct":22},"更新进度计划",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":31,"analysis":17},931246,"资金有约束情况下的独立方案选择，可以保证得到最优组合的方法是( )。",[366,368,370,372],{"key":20,"text":367,"correct":22},"双向排序均衡法",{"key":24,"text":369,"correct":22},"现值法",{"key":27,"text":371,"correct":22},"净现值率法",{"key":31,"text":373,"correct":29},"独立方案互斥化方法",{"id":375,"libraryId":5,"type":35,"typeLabel":36,"stem":376,"options":377,"answer":50,"analysis":17},931247,"产品按统计方法进行抽样检验常常用于( )情况。",[378,380,382,384,386],{"key":20,"text":379,"correct":29},"检验是破坏性的",{"key":24,"text":381,"correct":29},"产品数量多",{"key":27,"text":383,"correct":29},"检验项目多",{"key":31,"text":385,"correct":22},"检验的单位产品数量少",{"key":48,"text":387,"correct":29},"希望检验费用小",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":390,"answer":20,"analysis":17},931248,[391,393,395,397],{"key":20,"text":392,"correct":29},"有多个终点节点",{"key":24,"text":394,"correct":22},"节点编号不对",{"key":27,"text":396,"correct":22},"逻辑关系不对",{"key":31,"text":398,"correct":22},"有多个起点节点",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":24,"analysis":17},931249,"工程总费用由直接费和间接费两部分组成，随着建设工期的缩短，会引起( )。",[403,405,407,409],{"key":20,"text":404,"correct":22},"直接费和间接费同时增加",{"key":24,"text":406,"correct":29},"直接费增加，间接费减少",{"key":27,"text":408,"correct":22},"直接费和间接费同时减少",{"key":31,"text":410,"correct":22},"直接费减少，间接费增加",{"id":412,"libraryId":5,"type":35,"typeLabel":36,"stem":413,"options":414,"answer":165,"analysis":17},931250,"以下( )情况，属于控制图上的点未出现异常情况。",[415,417,419,420,421],{"key":20,"text":416,"correct":29},"连续6点全在中心线之上",{"key":24,"text":418,"correct":22},"连续7点具有连续上升趋势",{"key":27,"text":17,"correct":29},{"key":31,"text":17,"correct":29},{"key":48,"text":422,"correct":29},"对p图而言，1\u002F20的描点落在控制区域的1\u002F3区间内",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":425,"answer":20,"analysis":17},931251,[426,427,428,429],{"key":20,"text":237,"correct":29},{"key":24,"text":239,"correct":22},{"key":27,"text":241,"correct":22},{"key":31,"text":243,"correct":22},{"id":431,"libraryId":5,"type":35,"typeLabel":36,"stem":432,"options":433,"answer":77,"analysis":17},931252,"下列选项中，属于因果图体系分类的有( )。",[434,436,438,440,442],{"key":20,"text":435,"correct":29},"结果分解型",{"key":24,"text":437,"correct":29},"原因罗列型",{"key":27,"text":439,"correct":22},"因果关系型",{"key":31,"text":441,"correct":29},"工序分类型",{"key":48,"text":443,"correct":22},"工序分解型",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":27,"analysis":17},931253,"质量管理体系评价不包括( )。",[448,450,452,454],{"key":20,"text":449,"correct":22},"质量管理体系审核",{"key":24,"text":451,"correct":22},"质量管理体系评审",{"key":27,"text":453,"correct":29},"质量方法使用",{"key":31,"text":455,"correct":22},"自我评定",{"id":457,"libraryId":5,"type":35,"typeLabel":36,"stem":458,"options":459,"answer":470,"analysis":17},931254,"外部审核分为( )。",[460,462,464,466,468],{"key":20,"text":461,"correct":22},"第一方审核",{"key":24,"text":463,"correct":29},"第二方审核",{"key":27,"text":465,"correct":29},"第三方审核",{"key":31,"text":467,"correct":22},"主动审核",{"key":48,"text":469,"correct":22},"被动审核","BC",{"id":472,"libraryId":5,"type":35,"typeLabel":36,"stem":473,"options":474,"answer":485,"analysis":17},931255,"设计失效模式及影响分析可在以下( )方面辅助设计，降低失效风险。",[475,477,479,481,483],{"key":20,"text":476,"correct":29},"有助于对设计要求的评价，并可对不同设计方案作出客观真实评价",{"key":24,"text":478,"correct":29},"提高设计开发过程中设计质量和可靠性",{"key":27,"text":480,"correct":22},"确定失效起因，减少失效",{"key":31,"text":482,"correct":29},"为制定全面的设计开发计划提供信息",{"key":48,"text":484,"correct":29},"根据失效严重程度制定一套设计改进和开发试验优先控制系统","ABDE",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":24,"analysis":17},931256,"某企业从现在开始每年年末均等地存入银行100万元，年利率为6%，则4年末复本利和应为( )万元。[已知(F\u002F A，6%，4)=4.375]",[490,492,494,496],{"key":20,"text":491,"correct":22},"467.2",{"key":24,"text":493,"correct":29},"437.5",{"key":27,"text":495,"correct":22},"478.2",{"key":31,"text":497,"correct":22},"426.7",{"id":499,"libraryId":5,"type":35,"typeLabel":36,"stem":500,"options":501,"answer":470,"analysis":17},931257,"计算项目的挣值(EV)需要依据的数据资料包括( )。",[502,504,506,508,510],{"key":20,"text":503,"correct":22},"计划工作量",{"key":24,"text":505,"correct":29},"预算单价",{"key":27,"text":507,"correct":29},"已完工程量",{"key":31,"text":509,"correct":22},"完工预算",{"key":48,"text":511,"correct":22},"完工估算",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":24,"analysis":17},931258,"控制图可以分为两类，分别是计量值控制图和( )。",[516,518,520,522],{"key":20,"text":517,"correct":22},"平均值控制图",{"key":24,"text":519,"correct":29},"计数值控制图",{"key":27,"text":521,"correct":22},"统计值控制图",{"key":31,"text":523,"correct":22},"特征值控制图",{"id":525,"libraryId":5,"type":35,"typeLabel":36,"stem":526,"options":527,"answer":470,"analysis":17},931259,"下列关于施工合同(示范文本)约定的工程计量程序的说法中错误的是( )。",[528,530,532,534,536],{"key":20,"text":529,"correct":22},"承包人应按专用条款约定的时间向工程师提交已完工程量报告",{"key":24,"text":531,"correct":29},"工程师接到承包人报告后一个星期内核定工程量，并在计量前48小时通知承包人",{"key":27,"text":533,"correct":29},"工程师计量时一定要有承包人代表参加，否则计量无效",{"key":31,"text":535,"correct":22},"对于承包人超出设计图纸范围和因承包人原因造成返工的工程量，工程师不予计量",{"key":48,"text":537,"correct":22},"工程师收到承包人报告后7天内未计量的，从第8天起，承包人报告中开列的工程量视为已被工程师确认",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":24,"analysis":17},931260,"在工程网络计划中，已知工作A的总时差为3天，持续时间为6天，工作A有三项紧后工作，它们的最迟开始时间分别为第14天、第12天和第17天，则工作A的最早开始时间为第( )天。",[542,543,544,546],{"key":20,"text":239,"correct":22},{"key":24,"text":241,"correct":29},{"key":27,"text":545,"correct":22},"5",{"key":31,"text":547,"correct":22},"8",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":27,"analysis":17},931261,"根据正态分布曲线的性质可知，在正常生产的情况下，质量特征在( )区间的产品有85.45％。",[552,554,556,558],{"key":20,"text":553,"correct":22},"μ±3σ",{"key":24,"text":555,"correct":22},"(μ-σ)～(μ+σ)",{"key":27,"text":557,"correct":29},"(μ-2σ)～(μ+2σ)",{"key":31,"text":559,"correct":22},"(μ-3σ)～(μ+3σ)",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":20,"analysis":17},931262,"60管理的组织最高层级者是( )。",[564,566,568,570],{"key":20,"text":565,"correct":29},"倡导者",{"key":24,"text":567,"correct":22},"黑带大师",{"key":27,"text":569,"correct":22},"黑带",{"key":31,"text":571,"correct":22},"绿带",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":31,"analysis":17},931263,"下列表述错误的是( )。",[576,578,580,582],{"key":20,"text":577,"correct":22},"规范故障树：是仅含有底事件、结果事件及与门、或门、非门三种逻辑门的故障树",{"key":24,"text":579,"correct":22},"正规故障树：仅含有故障事件及与门、或门的故障树",{"key":27,"text":581,"correct":22},"非正规故障树：含有成功事件或非门的故障树",{"key":31,"text":583,"correct":29},"仅正规故障树属于规范故障树",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":27,"analysis":17},931264,"在两种不同分布混合一起时会出现( )直方图。",[588,590,592,594],{"key":20,"text":589,"correct":22},"标准型",{"key":24,"text":591,"correct":22},"孤岛型",{"key":27,"text":593,"correct":29},"双峰型",{"key":31,"text":595,"correct":22},"偏峰型",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":24,"analysis":17},931265,"( )方法的特点是：由于通过划类分层，增大了各类型中单位间的共同性，容易抽出具有代表性的调查样本。",[600,602,604,606],{"key":20,"text":601,"correct":22},"简单随机抽样",{"key":24,"text":603,"correct":29},"分层随机抽样",{"key":27,"text":605,"correct":22},"周期系统抽样",{"key":31,"text":607,"correct":22},"随机抽样",{"id":609,"libraryId":5,"type":15,"typeLabel":16,"stem":610,"options":611,"answer":24,"analysis":17},931266,"当设备发生不可消除的有形磨损时，可采取的设备磨损补偿方式为( )。",[612,614,616,618],{"key":20,"text":613,"correct":22},"设备修理",{"key":24,"text":615,"correct":29},"设备更新",{"key":27,"text":617,"correct":22},"设备现代化改造",{"key":31,"text":619,"correct":22},"设备报废",{"id":621,"libraryId":5,"type":15,"typeLabel":16,"stem":622,"options":623,"answer":31,"analysis":17},931267,"某基础工程土方开挖总量为10000立方米，该工程拟分10个施工段组织固定节拍流水施工，两台挖掘机的台班定额均为100立方米\u002F台班，其流水节拍应为( )天。",[624,626,628,630],{"key":20,"text":625,"correct":22},"100",{"key":24,"text":627,"correct":22},"50",{"key":27,"text":629,"correct":22},"10",{"key":31,"text":545,"correct":29},{"id":632,"libraryId":5,"type":15,"typeLabel":16,"stem":633,"options":634,"answer":24,"analysis":17},931268,"( )适用于总体情况复杂，各单位之间差异较大，单位较多的情况。",[635,636,637,638],{"key":20,"text":601,"correct":22},{"key":24,"text":603,"correct":29},{"key":27,"text":605,"correct":22},{"key":31,"text":607,"correct":22},{"id":640,"libraryId":5,"type":15,"typeLabel":16,"stem":641,"options":642,"answer":20,"analysis":17},931269,"下列有关现金流量图描述正确的是( )。",[643,645,647,649],{"key":20,"text":644,"correct":29},"横轴为时间轴",{"key":24,"text":646,"correct":22},"垂直线的长度与现金流量的金额无关",{"key":27,"text":648,"correct":22},"间隔代表一年",{"key":31,"text":650,"correct":22},"与横轴相连的向下箭头代表资金的流入",[652,655,658,661,664,667],{"id":15,"name":653,"category":7,"favorite":654},"领导干部任职前廉政法规知识测试题",92,{"id":656,"name":657,"category":7,"favorite":15},595,"建筑结构与设备",{"id":659,"name":660,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":662,"name":663,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":665,"name":666,"category":7,"favorite":8},534,"BIM工程师",{"id":668,"name":666,"category":7,"favorite":8},535]