[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-603-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":662},{"id":5,"name":6,"category":7,"favorite":8},603,"质量、投资、进度控制","建筑工程",0,4,50,656,[13,34,46,58,70,81,93,105,117,133,145,157,171,186,197,211,226,239,251,263,278,290,301,316,328,339,348,363,375,389,401,415,424,436,450,462,476,488,503,517,529,544,558,570,582,597,609,624,633,648],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},931170,1,"单选题","对不合格品的让步接收，只适合于( )。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","出厂检验",false,{"key":24,"text":25,"correct":22},"B","进货检验",{"key":27,"text":28,"correct":29},"C","过程检验",true,{"key":31,"text":32,"correct":22},"D","最终检验","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},931171,"下列财务评价指标中，属于分析项目偿债能力的是( )。",[38,40,42,44],{"key":20,"text":39,"correct":22},"净现值",{"key":24,"text":41,"correct":29},"利息备付率",{"key":27,"text":43,"correct":22},"总投资收益率",{"key":31,"text":45,"correct":22},"投资回收期",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},931172,"在双代号网络计划中，某工作有四项紧后工作，它们的最迟开始时间分别是第13天、第15天、第19天和第20天，则该工作的最迟完成时间是第( )天。",[50,52,54,56],{"key":20,"text":51,"correct":29},"13",{"key":24,"text":53,"correct":22},"15",{"key":27,"text":55,"correct":22},"19",{"key":31,"text":57,"correct":22},"20",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},931173,"在2000版9000族标准的术语中，质量控制是质量管理的一部分，其目的是( )。",[62,64,66,68],{"key":20,"text":63,"correct":22},"致力于增强满足质量要求的能力",{"key":24,"text":65,"correct":22},"致力于提供质量要求会得到满足的信任",{"key":27,"text":67,"correct":29},"致力于满足质量要求",{"key":31,"text":69,"correct":22},"致力于制定质量目标并想法实现其质量目标",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":72,"answer":31,"analysis":33},931174,[73,75,77,79],{"key":20,"text":74,"correct":22},"虽然工作E拖后1周，但对后续工作及总工期均不产生影响；",{"key":24,"text":76,"correct":22},"由于工作C拖后1周，因而使工期延长1周；",{"key":27,"text":78,"correct":22},"虽然工作D拖后2周，但对后续工作及总工期均不产生影响；",{"key":31,"text":80,"correct":29},"虽然工作C拖后1周，但并不影响其后续工作的正常进行。",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":27,"analysis":33},931175,"八项质量管理原则中，质量管理的关键是( )。",[85,87,89,91],{"key":20,"text":86,"correct":22},"以顾客为关注焦点",{"key":24,"text":88,"correct":22},"持续改进",{"key":27,"text":90,"correct":29},"领导作用",{"key":31,"text":92,"correct":22},"全员参与",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":27,"analysis":33},931176,"因果图通过箭线体系，表示结果和原因之间的关系，按体系不同可分为原因罗列型、工序分类型和( )。",[97,99,101,103],{"key":20,"text":98,"correct":22},"目标分解型",{"key":24,"text":100,"correct":22},"任务分解型",{"key":27,"text":102,"correct":29},"结果分解型",{"key":31,"text":104,"correct":22},"对策分解型",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":31,"analysis":33},931177,"限额设计就是按照设定的投资控制目标控制( )，确保不突破投资限额。",[109,111,113,115],{"key":20,"text":110,"correct":22},"设备制造过程",{"key":24,"text":112,"correct":22},"设备储运过程",{"key":27,"text":114,"correct":22},"设备安装调试过程",{"key":31,"text":116,"correct":29},"设备工程设计过程",{"id":118,"libraryId":5,"type":119,"typeLabel":120,"stem":33,"options":121,"answer":132,"analysis":33},931178,2,"多选题",[122,124,126,128,130],{"key":20,"text":123,"correct":29},"工作C为关键工作",{"key":24,"text":125,"correct":29},"工作A为非关键工作",{"key":27,"text":127,"correct":22},"工作D总时差为2天",{"key":31,"text":129,"correct":29},"工作E自由时差为1天",{"key":131,"text":33,"correct":22},"E","ABD",{"id":134,"libraryId":5,"type":15,"typeLabel":16,"stem":135,"options":136,"answer":31,"analysis":33},931179,"设备采购中优先把握的准则是向合格的供应商采购( )的设备。",[137,139,141,143],{"key":20,"text":138,"correct":22},"技术先进，生产适用",{"key":24,"text":140,"correct":22},"安全可靠，经济合理",{"key":27,"text":142,"correct":22},"技术先进，经济合理",{"key":31,"text":144,"correct":29},"完全符合各项技术要求及标准规范",{"id":146,"libraryId":5,"type":15,"typeLabel":16,"stem":147,"options":148,"answer":24,"analysis":33},931180,"根据资金时间价值的原理，在年利率为i情况下，将发生在第2、3、4、5年年末的等额年金80万元折算到第1年年初的现值，其金额为( )万元。 A.80(P\u002F A，i，4) B.80(P\u002F A，i，4)(P\u002F F，i，1) C.80(P\u002F",[149,151,153,155],{"key":20,"text":150,"correct":22},"i，4)",{"key":24,"text":152,"correct":29},"80(P\u002F",{"key":27,"text":154,"correct":22},"i，4)(P\u002F",{"key":31,"text":156,"correct":22},"i，1)",{"id":158,"libraryId":5,"type":119,"typeLabel":120,"stem":33,"options":159,"answer":170,"analysis":33},931181,[160,162,164,166,168],{"key":20,"text":161,"correct":22},"存在循环回路",{"key":24,"text":163,"correct":29},"节点编号有误",{"key":27,"text":165,"correct":29},"有多余虚工作",{"key":31,"text":167,"correct":29},"有多个起始节点",{"key":131,"text":169,"correct":22},"有多个终点节点","BCD",{"id":172,"libraryId":5,"type":119,"typeLabel":120,"stem":173,"options":174,"answer":185,"analysis":33},931182,"可行性研究中对市场进行直接调查的方法有( )。",[175,177,179,181,183],{"key":20,"text":176,"correct":22},"通过媒体进行信息收集",{"key":24,"text":178,"correct":29},"访问调查法",{"key":27,"text":180,"correct":29},"通信调查法",{"key":31,"text":182,"correct":29},"会议调查法",{"key":131,"text":184,"correct":29},"实验法","BCDE",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":188,"answer":27,"analysis":33},931183,[189,191,193,195],{"key":20,"text":190,"correct":22},"C工作实际进度拖后2周，影响工期2周",{"key":24,"text":192,"correct":22},"D工作实际进度拖后2周，影响工期l周",{"key":27,"text":194,"correct":29},"D工作实际进度拖后3周，影响工期2周",{"key":31,"text":196,"correct":22},"E工作实际进度拖后1周，不影响工期",{"id":198,"libraryId":5,"type":119,"typeLabel":120,"stem":199,"options":200,"answer":170,"analysis":33},931184,"挣值管理主要通过( )关键参数来衡量项目的实施状态。",[201,203,205,207,209],{"key":20,"text":202,"correct":22},"成本偏差",{"key":24,"text":204,"correct":29},"计划价值",{"key":27,"text":206,"correct":29},"挣值",{"key":31,"text":208,"correct":29},"实际成本",{"key":131,"text":210,"correct":22},"进度偏差",{"id":212,"libraryId":5,"type":119,"typeLabel":120,"stem":213,"options":214,"answer":225,"analysis":33},931185,"一般对( )均应进行型式试验。",[215,217,219,221,223],{"key":20,"text":216,"correct":29},"新产品",{"key":24,"text":218,"correct":29},"生产条件发生重大变化时",{"key":27,"text":220,"correct":29},"结构、材料有重大改变的产品",{"key":31,"text":222,"correct":22},"易于检测的关键、重要特性",{"key":131,"text":224,"correct":22},"安装尺寸、连接尺寸以及外观","ABC",{"id":227,"libraryId":5,"type":119,"typeLabel":120,"stem":228,"options":229,"answer":225,"analysis":33},931186,"根据抽样检验的基本原理，一个好的抽样方案应当是( )。",[230,232,234,236,238],{"key":20,"text":231,"correct":29},"当批质量好时，能以高概率接收",{"key":24,"text":233,"correct":29},"当批质量差于某个规定界限时，能以高概率拒绝",{"key":27,"text":235,"correct":29},"当批产品质量变坏时，接收概率迅速减小",{"key":31,"text":237,"correct":22},"两种错误(拒真、受伪)的可能性风险都达到最小",{"key":131,"text":33,"correct":22},{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":27,"analysis":33},931187,"要正确绘制现金流量图，必须把握好现金流量的三要素。下列选项中，不属于现金流量图三要素的是( )。",[243,245,247,249],{"key":20,"text":244,"correct":22},"大小",{"key":24,"text":246,"correct":22},"方向",{"key":27,"text":248,"correct":29},"利率",{"key":31,"text":250,"correct":22},"时间点",{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":31,"analysis":33},931188,"下列关于6σ管理基本原则的说法，错误的是( )。",[255,257,259,261],{"key":20,"text":256,"correct":22},"以顾客为关注中心",{"key":24,"text":258,"correct":22},"无边界合作",{"key":27,"text":260,"correct":22},"追求完美",{"key":31,"text":262,"correct":29},"对失误零容忍",{"id":264,"libraryId":5,"type":119,"typeLabel":120,"stem":265,"options":266,"answer":277,"analysis":33},931189,"在出现进度延误时，保持进度计划工期不变的技术措施调整方法可能有( )。",[267,269,271,273,275],{"key":20,"text":268,"correct":29},"改变关键工作间的逻辑关系",{"key":24,"text":270,"correct":22},"增加非关键工作上资源量",{"key":27,"text":272,"correct":22},"缩短非关键工作的持续时间",{"key":31,"text":274,"correct":29},"压缩关键工作的持续时间",{"key":131,"text":276,"correct":22},"改变非关键工作间的逻辑关系","AD",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":31,"analysis":33},931190,"在某工程网络计划中，工作M有2项紧前工作K、L，它们的最早开始时间分别为第4天和第6天，持续时间分别为4天和7天，则工作K、M的时间间隔LAGK，M为( )天。",[282,284,286,288],{"key":20,"text":283,"correct":22},"2；",{"key":24,"text":285,"correct":22},"3；",{"key":27,"text":287,"correct":22},"4；",{"key":31,"text":289,"correct":29},"5；",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":27,"analysis":33},931191,"收集到某产品的一组质量数据为：11.13.14.16.18.21.22.25。该组数据的极差是( )。",[294,296,297,299],{"key":20,"text":295,"correct":22},"11",{"key":24,"text":51,"correct":22},{"key":27,"text":298,"correct":29},"14",{"key":31,"text":300,"correct":22},"25",{"id":302,"libraryId":5,"type":119,"typeLabel":120,"stem":303,"options":304,"answer":315,"analysis":33},931192,"过程失效模式及影响分析(PFME A)的作用包括( )。",[305,307,309,311,313],{"key":20,"text":306,"correct":29},"确定与产品相关的过程失效模式",{"key":24,"text":308,"correct":29},"评价失效模式对顾客的潜在影响",{"key":27,"text":310,"correct":29},"确定失效起因，减少失效",{"key":31,"text":312,"correct":22},"确定失效过程的最小割集",{"key":131,"text":314,"correct":29},"根据失效模式的级别建立纠正措施的优选体系","ABCE",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":31,"analysis":33},931193,"某设备工程从银行贷款2000万元，银行的年利率为10%，3年后一次性还本付息。如果按复利计息，则3年后还给银行的本利和为( )万元。",[320,322,324,326],{"key":20,"text":321,"correct":22},"2300",{"key":24,"text":323,"correct":22},"2331",{"key":27,"text":325,"correct":22},"2600",{"key":31,"text":327,"correct":29},"2662",{"id":329,"libraryId":5,"type":119,"typeLabel":120,"stem":33,"options":330,"answer":338,"analysis":33},931194,[331,333,335,336,337],{"key":20,"text":332,"correct":29},"多个起点节点",{"key":24,"text":334,"correct":22},"多个终点节点",{"key":27,"text":163,"correct":29},{"key":31,"text":161,"correct":22},{"key":131,"text":165,"correct":29},"ACE",{"id":340,"libraryId":5,"type":119,"typeLabel":120,"stem":33,"options":341,"answer":170,"analysis":33},931195,[342,344,345,346],{"key":20,"text":343,"correct":22},"有多个起点节点",{"key":24,"text":169,"correct":29},{"key":27,"text":161,"correct":29},{"key":31,"text":347,"correct":29},"工作代号重复",{"id":349,"libraryId":5,"type":119,"typeLabel":120,"stem":350,"options":351,"answer":362,"analysis":33},931196,"第三方审核是由于独立于受审核方且不受其经济利益制约的第三方机构依据特定的审核准则、规定的程序和方法对受审核方进行的审核。其目的是( )。",[352,354,356,358,360],{"key":20,"text":353,"correct":29},"确定受审核方的管理体系是否符合相关标准的要求",{"key":24,"text":355,"correct":29},"确定受审核方的管理体系是否能被认证注册",{"key":27,"text":357,"correct":22},"减少产品鉴定会",{"key":31,"text":359,"correct":29},"确定现行的管理体系是否能实现规定目标的有效性",{"key":131,"text":361,"correct":29},"为受审核方提供改进其管理体系的机会","ABDE",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":31,"analysis":33},931197,"下列关于单代号网络图组成的说法，正确的是( )。",[367,369,371,373],{"key":20,"text":368,"correct":22},"节点表示工作之间的逻辑关系，箭线表示工作及其进行的方向",{"key":24,"text":370,"correct":22},"节点表示工作的开始或结束，箭线表示工作及其进行的方向",{"key":27,"text":372,"correct":22},"节点表示工作方向，箭线表示工作之间的关系",{"key":31,"text":374,"correct":29},"节点表示工作，箭线表示工作间的逻辑关系",{"id":376,"libraryId":5,"type":119,"typeLabel":120,"stem":377,"options":378,"answer":185,"analysis":33},931198,"下列关于实际利率和名义利率的说法，正确的有( )。",[379,381,383,385,387],{"key":20,"text":380,"correct":22},"当年内计息次数大于1时，实际利率小于名义利率",{"key":24,"text":382,"correct":29},"当年内计息次数等于1时，实际利率等于名义利率",{"key":27,"text":384,"correct":29},"当年内计息次数大于1时，实际利率大于名义利率",{"key":31,"text":386,"correct":29},"实际利率比名义利率更能反映资金的时间价值",{"key":131,"text":388,"correct":29},"其他条件不变时，计息周期越短，实际利率与名义利率差距越大",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":31,"analysis":33},931199,"设备的经济寿命是指( )。",[393,395,397,399],{"key":20,"text":394,"correct":22},"设备从投入使用开始，到因物质磨损而不能继续使用、报废为止所经历的全部时间",{"key":24,"text":396,"correct":22},"设备从投入使用到因技术落后而被淘汰所延续的时间",{"key":27,"text":398,"correct":22},"设备按财税部门的规定，把设备价值折旧至等于其残值所经历的时间",{"key":31,"text":400,"correct":29},"设备从开始使用，到其再继续使用从经济上变得不合理所经历的时间",{"id":402,"libraryId":5,"type":119,"typeLabel":120,"stem":403,"options":404,"answer":185,"analysis":33},931200,"职业健康安全与环境管理体系的建立包括( )。",[405,407,409,411,413],{"key":20,"text":406,"correct":22},"管理体系持续改善",{"key":24,"text":408,"correct":29},"领导决策与准备",{"key":27,"text":410,"correct":29},"成立工作小组",{"key":31,"text":412,"correct":29},"贯标培训",{"key":131,"text":414,"correct":29},"初始状态评审",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":417,"answer":27,"analysis":33},931201,[418,420,421,423],{"key":20,"text":419,"correct":22},"12",{"key":24,"text":298,"correct":22},{"key":27,"text":422,"correct":29},"18",{"key":31,"text":57,"correct":22},{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":27,"analysis":33},931202,"在设备工程进度管理的动态循环过程中，设备监理工程师通常通过( )方法决定是否更新进度计划。",[428,430,432,434],{"key":20,"text":429,"correct":22},"逻辑关系分析",{"key":24,"text":431,"correct":22},"三时估计",{"key":27,"text":433,"correct":29},"偏差分析",{"key":31,"text":435,"correct":22},"因果关系分析",{"id":437,"libraryId":5,"type":119,"typeLabel":120,"stem":438,"options":439,"answer":338,"analysis":33},931203,"企业定额的作用表现在( )。",[440,442,444,446,448],{"key":20,"text":441,"correct":29},"是企业计划管理的依据",{"key":24,"text":443,"correct":22},"是国家宏观调控的依据",{"key":27,"text":445,"correct":29},"是计算工人劳动报酬的依据",{"key":31,"text":447,"correct":22},"是编制设计概算、加强企业成本管理的基础",{"key":131,"text":449,"correct":29},"是投标报价的依据",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":27,"analysis":33},931204,"双代号网络计划的计算工期应等于其所有最后结束工作的( )。",[454,456,458,460],{"key":20,"text":455,"correct":22},"最早完成时间最小值",{"key":24,"text":457,"correct":22},"最迟完成时间最小值",{"key":27,"text":459,"correct":29},"最早完成时间最大值",{"key":31,"text":461,"correct":22},"最迟完成时间平均值",{"id":463,"libraryId":5,"type":119,"typeLabel":120,"stem":464,"options":465,"answer":170,"analysis":33},931205,"对于检验和试验记录表式的编制，下列说法正确的是( )。",[466,468,470,472,474],{"key":20,"text":467,"correct":22},"栏目选择应该尽可能多",{"key":24,"text":469,"correct":29},"要求有足够的数据",{"key":27,"text":471,"correct":29},"记录应力求标准化和规范化",{"key":31,"text":473,"correct":29},"检验和试验记录都应具有分类号和流水号",{"key":131,"text":475,"correct":22},"检验人员是产品阶段放行人又是最终放行的授权人",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":31,"analysis":33},931206,"下列关于流通合格率(RTY)的说法，错误的是( )。",[480,482,484,486],{"key":20,"text":481,"correct":22},"是指每个过程中首批生产合格产品的能力",{"key":24,"text":483,"correct":22},"流通合格率分析与劣质成本分析一样揭示劣质成本",{"key":27,"text":485,"correct":22},"评价结果易于量化",{"key":31,"text":487,"correct":29},"也称作企业中不增值的“隐蔽工厂”",{"id":489,"libraryId":5,"type":119,"typeLabel":120,"stem":490,"options":491,"answer":502,"analysis":33},931207,"在绘制现金流量图时，应把握的要素有现金流量的( )。",[492,494,496,498,500],{"key":20,"text":493,"correct":22},"性质",{"key":24,"text":495,"correct":29},"数额",{"key":27,"text":497,"correct":22},"累计额",{"key":31,"text":499,"correct":29},"流向",{"key":131,"text":501,"correct":29},"发生时间","BDE",{"id":504,"libraryId":5,"type":119,"typeLabel":120,"stem":505,"options":506,"answer":225,"analysis":33},931208,"项目评价常用的基准收益率的确定方法有( )。",[507,509,511,513,515],{"key":20,"text":508,"correct":29},"项目收益法",{"key":24,"text":510,"correct":29},"零风险回报率法",{"key":27,"text":512,"correct":29},"加权平均资金成本法",{"key":31,"text":514,"correct":22},"盈亏平衡分析法",{"key":131,"text":516,"correct":22},"最小公倍数法",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":31,"analysis":33},931209,"在某个项目中，存在新老系统切换问题，在设置项目计划网络图时，新系统上线和老系统下线之间应设置成( )。",[521,523,525,527],{"key":20,"text":522,"correct":22},"结束到开始(FS型)关系",{"key":24,"text":524,"correct":22},"结束到结束(FF型)关系",{"key":27,"text":526,"correct":22},"开始到开始(SS型)关系",{"key":31,"text":528,"correct":29},"开始到结束(SF型)关系",{"id":530,"libraryId":5,"type":119,"typeLabel":120,"stem":531,"options":532,"answer":543,"analysis":33},931210,"在网络计划工期优化过程中，优先选择缩短持续时间的关键工作应是( )。",[533,535,537,539,541],{"key":20,"text":534,"correct":22},"持续时间最长的工作",{"key":24,"text":536,"correct":22},"最早开始时间最短的工作",{"key":27,"text":538,"correct":29},"有充足备用资源的工作",{"key":31,"text":540,"correct":29},"增加所需费用最少的工作",{"key":131,"text":542,"correct":29},"对质量和安全影响不大的工作","CDE",{"id":545,"libraryId":5,"type":119,"typeLabel":120,"stem":546,"options":547,"answer":277,"analysis":33},931211,"抽样技术的选择取决于( )。",[548,550,552,554,556],{"key":20,"text":549,"correct":29},"抽样目的",{"key":24,"text":551,"correct":22},"抽样方法",{"key":27,"text":553,"correct":22},"抽样原则",{"key":31,"text":555,"correct":29},"抽样条件",{"key":131,"text":557,"correct":22},"抽样形式",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":27,"analysis":33},931212,"在某设备安装工程网络计划中，已知某工作的自由时差为2天，总时差为5天，设备监理工程师在检查进度时发现该工作总时差变为-1天，则说明该工作实际进度比计划进度拖后( )天。",[562,564,566,568],{"key":20,"text":563,"correct":22},"1",{"key":24,"text":565,"correct":22},"3",{"key":27,"text":567,"correct":29},"6",{"key":31,"text":569,"correct":22},"8",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":31,"analysis":33},931213,"价值工程活动的核心一环是( )。",[574,576,578,580],{"key":20,"text":575,"correct":22},"对象选择",{"key":24,"text":577,"correct":22},"方案创新",{"key":27,"text":579,"correct":22},"方案评价",{"key":31,"text":581,"correct":29},"功能分析",{"id":583,"libraryId":5,"type":119,"typeLabel":120,"stem":584,"options":585,"answer":596,"analysis":33},931214,"可以用来寻找影响质量原因的方法有( )。",[586,588,590,592,594],{"key":20,"text":587,"correct":29},"调查表法",{"key":24,"text":589,"correct":29},"分层法",{"key":27,"text":591,"correct":29},"排列图表",{"key":31,"text":593,"correct":29},"因果图法",{"key":131,"text":595,"correct":22},"控制图法","ABCD",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":20,"analysis":33},931215,"在进行“工期固定—资源均衡”优化时，所采取的措施是( )。",[601,603,605,607],{"key":20,"text":602,"correct":29},"通过改变非关键工作的开始时间",{"key":24,"text":604,"correct":22},"通过改变关键工作的开始时间",{"key":27,"text":606,"correct":22},"通过改变非关键工作的完成时间",{"key":31,"text":608,"correct":22},"通过改变关键工作的完成时间",{"id":610,"libraryId":5,"type":119,"typeLabel":120,"stem":611,"options":612,"answer":623,"analysis":33},931216,"以下质量管理体系基础中，( )阐明了质量管理体系的建立和实施思路。",[613,615,617,619,621],{"key":20,"text":614,"correct":29},"质量管理体系的理论说明",{"key":24,"text":616,"correct":22},"质量管理体系要求与产品要求",{"key":27,"text":618,"correct":29},"质量管理体系方法",{"key":31,"text":620,"correct":29},"过程方法",{"key":131,"text":622,"correct":22},"最高管理者在质量管理体系中的作用","ACD",{"id":625,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":626,"answer":27,"analysis":33},931217,[627,628,630,631],{"key":20,"text":563,"correct":22},{"key":24,"text":629,"correct":22},"2",{"key":27,"text":565,"correct":29},{"key":31,"text":632,"correct":22},"4",{"id":634,"libraryId":5,"type":119,"typeLabel":120,"stem":635,"options":636,"answer":647,"analysis":33},931218,"职业健康安全管理体系试运行的目的是要在实践中检验体系的( )。",[637,639,641,643,645],{"key":20,"text":638,"correct":29},"充分性",{"key":24,"text":640,"correct":22},"可靠性",{"key":27,"text":642,"correct":22},"科学性",{"key":31,"text":644,"correct":29},"适用性",{"key":131,"text":646,"correct":29},"有效性","ADE",{"id":649,"libraryId":5,"type":119,"typeLabel":120,"stem":650,"options":651,"answer":596,"analysis":33},931219,"风险防范对策主要有( )。",[652,654,656,658,660],{"key":20,"text":653,"correct":29},"风险回避",{"key":24,"text":655,"correct":29},"风险分担",{"key":27,"text":657,"correct":29},"风险转移",{"key":31,"text":659,"correct":29},"风险自留",{"key":131,"text":661,"correct":22},"风险管理",[663,666,669,672,675,678],{"id":15,"name":664,"category":7,"favorite":665},"领导干部任职前廉政法规知识测试题",92,{"id":667,"name":668,"category":7,"favorite":15},595,"建筑结构与设备",{"id":670,"name":671,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":673,"name":674,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":676,"name":677,"category":7,"favorite":8},534,"BIM工程师",{"id":679,"name":677,"category":7,"favorite":8},535]