[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-603-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":650},{"id":5,"name":6,"category":7,"favorite":8},603,"质量、投资、进度控制","建筑工程",0,3,50,656,[13,38,52,66,78,93,105,120,132,147,159,174,186,201,213,227,239,253,265,279,291,306,318,333,345,359,368,382,394,406,418,429,441,453,465,476,486,498,510,522,533,544,556,568,580,591,603,615,626,638],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},931120,2,"多选题","产品检验是指用某种方法( )产品的一种或多种质量特性并将测定结果与判别标准相比较，以判定每个产品或每批产品是否合格的过程。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","测量",true,{"key":24,"text":25,"correct":22},"B","检查",{"key":27,"text":28,"correct":22},"C","试验",{"key":30,"text":31,"correct":32},"D","观测",false,{"key":34,"text":35,"correct":22},"E","计量","ABCE","",{"id":39,"libraryId":5,"type":40,"typeLabel":41,"stem":42,"options":43,"answer":30,"analysis":37},931121,1,"单选题","组织实施初始状态评审之后，根据评审结果，结合组织现有的资源以及现有的技术水平，进行管理体系的( )。",[44,46,48,50],{"key":20,"text":45,"correct":32},"领导决策",{"key":24,"text":47,"correct":32},"贯标培训",{"key":27,"text":49,"correct":32},"成立工作组",{"key":30,"text":51,"correct":22},"整体策划和设计",{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":37,"options":54,"answer":65,"analysis":37},931122,[55,57,59,61,63],{"key":20,"text":56,"correct":32},"多个起点节点",{"key":24,"text":58,"correct":22},"多个终点节点",{"key":27,"text":60,"correct":32},"存在循环回路",{"key":30,"text":62,"correct":22},"工作代号重复",{"key":34,"text":64,"correct":22},"节点编号有误","BDE",{"id":67,"libraryId":5,"type":40,"typeLabel":41,"stem":68,"options":69,"answer":24,"analysis":37},931123,"某设备工程项目有甲、乙、丙、丁四个不确定因素，当其变动百分比均为10%时，评价指标值变动的百分比分别为5%、20%、15%和10%，则最敏感的是( )。",[70,72,74,76],{"key":20,"text":71,"correct":32},"因素甲",{"key":24,"text":73,"correct":22},"因素乙",{"key":27,"text":75,"correct":32},"因素丙",{"key":30,"text":77,"correct":32},"因素丁",{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":92,"analysis":37},931124,"按检验的时间节点分，检验和试验包括( )。",[82,84,86,88,90],{"key":20,"text":83,"correct":32},"全数检验",{"key":24,"text":85,"correct":22},"进货检验",{"key":27,"text":87,"correct":22},"过程检验",{"key":30,"text":89,"correct":22},"最终检验",{"key":34,"text":91,"correct":32},"抽样检验","BCD",{"id":94,"libraryId":5,"type":40,"typeLabel":41,"stem":95,"options":96,"answer":20,"analysis":37},931125,"控制图就是利用( )规律来识别生产过程中的异常原因，控制系统性原因造成的质量波动，保证生产过程处于控制状态",[97,99,101,103],{"key":20,"text":98,"correct":22},"质量特性值呈正态分布",{"key":24,"text":100,"correct":32},"质量特性值呈周期性变化",{"key":27,"text":102,"correct":32},"质量特性值易于识别",{"key":30,"text":104,"correct":32},"质量特性值的稳定状态",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":119,"analysis":37},931126,"某设备工程采用总承包(EP C)模式发包，在设备工程设计过程中，设备监理工程师进行进度管理应审核的承包商文件包括( )。",[109,111,113,115,117],{"key":20,"text":110,"correct":22},"承包商设计工作进度计划",{"key":24,"text":112,"correct":32},"设备制造进度计划",{"key":27,"text":114,"correct":22},"设计变更工作进度计划",{"key":30,"text":116,"correct":22},"设计工期索赔报告",{"key":34,"text":118,"correct":32},"全系统设备调试进度计划","ACD",{"id":121,"libraryId":5,"type":40,"typeLabel":41,"stem":122,"options":123,"answer":20,"analysis":37},931127,"一般认为( )由设备变差(即系统内变差)引起。",[124,126,128,130],{"key":20,"text":125,"correct":22},"重复性",{"key":24,"text":127,"correct":32},"再现性",{"key":27,"text":129,"correct":32},"精密度",{"key":30,"text":131,"correct":32},"准确度",{"id":133,"libraryId":5,"type":15,"typeLabel":16,"stem":134,"options":135,"answer":146,"analysis":37},931128,"下列选项中，属于网络计划技术的有( )。",[136,138,140,142,144],{"key":20,"text":137,"correct":32},"横道图",{"key":24,"text":139,"correct":22},"关键路径法",{"key":27,"text":141,"correct":22},"计划评审技术",{"key":30,"text":143,"correct":22},"图示评审技术",{"key":34,"text":145,"correct":22},"风险评审技术","BCDE",{"id":148,"libraryId":5,"type":40,"typeLabel":41,"stem":149,"options":150,"answer":27,"analysis":37},931129,"下列关于故障树分析的表述，错误的是( )。",[151,153,155,157],{"key":20,"text":152,"correct":32},"可透彻了解系统产生故障的原因，找出薄弱环节",{"key":24,"text":154,"correct":32},"便于改进系统设计、运行和维修",{"key":27,"text":156,"correct":22},"进行危险源辨识的方法",{"key":30,"text":158,"correct":32},"提高系统可靠性、维修性和安全性",{"id":160,"libraryId":5,"type":15,"typeLabel":16,"stem":161,"options":162,"answer":173,"analysis":37},931130,"工程网络计划的计算工期等于( )。",[163,165,167,169,171],{"key":20,"text":164,"correct":22},"单代号网络图中终点节点所代表工作的最早完成时间",{"key":24,"text":166,"correct":32},"单代号网络图中终点节点所代表工作的最晚完成时间",{"key":27,"text":168,"correct":22},"双代号网络图中以终点节点为完成节点工作的最早完成时间的最大值",{"key":30,"text":170,"correct":32},"双代号网络图中以终点节点为完成节点工作的最晚完成时间的最大值",{"key":34,"text":172,"correct":22},"时标网络计划中最后一项关键工作的最早完成时间","ACE",{"id":175,"libraryId":5,"type":40,"typeLabel":41,"stem":176,"options":177,"answer":30,"analysis":37},931131,"在树图的评价中，三角符号表示( )。",[178,180,182,184],{"key":20,"text":179,"correct":32},"不在工作范围内",{"key":24,"text":181,"correct":32},"可行",{"key":27,"text":183,"correct":32},"不可行",{"key":30,"text":185,"correct":22},"需要调查才能确认",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":200,"analysis":37},931132,"设备大修理决策时，考虑的经济条件有( )。",[190,192,194,196,198],{"key":20,"text":191,"correct":22},"大修理费用不能超过同种设备的重置价格",{"key":24,"text":193,"correct":32},"大修理费用不能超过设备全部折旧的1\u002F2",{"key":27,"text":195,"correct":22},"大修理后生产成本不高于使用同种新设备的生产成本",{"key":30,"text":197,"correct":32},"大修理后使用寿命不低于其自然寿命的1\u002F2",{"key":34,"text":199,"correct":32},"大修理费用中要考虑沉没成本","AC",{"id":202,"libraryId":5,"type":40,"typeLabel":41,"stem":203,"options":204,"answer":27,"analysis":37},931133,"下列财务评价指标中，反映项目盈利能力的指标是( )。",[205,207,209,211],{"key":20,"text":206,"correct":32},"资产负债率",{"key":24,"text":208,"correct":32},"流动比率",{"key":27,"text":210,"correct":22},"投资回收期",{"key":30,"text":212,"correct":32},"利息备付率",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":173,"analysis":37},931134,"影响抽样误差的主要因素有( )。",[217,219,221,223,225],{"key":20,"text":218,"correct":22},"样本容量",{"key":24,"text":220,"correct":32},"样本来源",{"key":27,"text":222,"correct":22},"总体标志值的差异程度",{"key":30,"text":224,"correct":32},"抽样目的",{"key":34,"text":226,"correct":22},"抽样方法",{"id":228,"libraryId":5,"type":40,"typeLabel":41,"stem":229,"options":230,"answer":27,"analysis":37},931135,"某设备的当前市场变现价值为40万元，大修理费预计60万元，市场上同种新设备价格为200万元；现有设备大修前单位生产成本为2.5万元\u002F吨，大修后的单位产品生产成本为2.3万元\u002F吨，同类型新设备单位生产成本为2万元\u002F吨。下列关于该设备大修理决策的说法，正确的是( )。",[231,233,235,237],{"key":20,"text":232,"correct":32},"应进行大修理，因大修理费未超出购置同种新设备所需费用",{"key":24,"text":234,"correct":32},"应进行大修理，因大修理后产品单位成本降低",{"key":27,"text":236,"correct":22},"不应进行大修理，因大修后设备单位产品成本高于同种新设备单位产品成本",{"key":30,"text":238,"correct":32},"不应进行大修理，因大修理费超出其变现价值",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":92,"analysis":37},931136,"计数值的抽样计划一般包括( )。",[243,245,247,249,251],{"key":20,"text":244,"correct":32},"规格",{"key":24,"text":246,"correct":22},"批量数",{"key":27,"text":248,"correct":22},"样本数",{"key":30,"text":250,"correct":22},"合格判定数",{"key":34,"text":252,"correct":32},"各品质指标",{"id":254,"libraryId":5,"type":40,"typeLabel":41,"stem":255,"options":256,"answer":20,"analysis":37},931137,"在设备安装调试合同中，对承包商来讲，风险最大的是( )。",[257,259,261,263],{"key":20,"text":258,"correct":22},"总价合同",{"key":24,"text":260,"correct":32},"单价合同",{"key":27,"text":262,"correct":32},"百分比酬金合同",{"key":30,"text":264,"correct":32},"固定酬金合同",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":119,"analysis":37},931138,"抽样检验方案将检查批判为合格而接受的概率的数值可以用( )等公式计算或查图表得到。",[269,271,273,275,277],{"key":20,"text":270,"correct":22},"超几何分布",{"key":24,"text":272,"correct":32},"正态分布",{"key":27,"text":274,"correct":22},"二项分布",{"key":30,"text":276,"correct":22},"泊松分布",{"key":34,"text":278,"correct":32},"指数分布",{"id":280,"libraryId":5,"type":40,"typeLabel":41,"stem":281,"options":282,"answer":24,"analysis":37},931139,"当利用S形曲线进行实际进度与计划进度比较时，如果检查日期实际进展点落在计划S形曲线的右侧，则该实际进展点与计划S形曲线的水平跟离表示工程项目( )。",[283,285,287,289],{"key":20,"text":284,"correct":32},"实际进度超前的时间",{"key":24,"text":286,"correct":22},"实际进度拖后的时间",{"key":27,"text":288,"correct":32},"实际超额完成的任务量",{"key":30,"text":290,"correct":32},"实际拖欠的任务量",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":305,"analysis":37},931140,"下列关于方案经济比选的说法，正确的有( )。",[295,297,299,301,303],{"key":20,"text":296,"correct":22},"互斥型方案的特点是方案间具有互不相容性",{"key":24,"text":298,"correct":22},"内部收益率指标不可直接用于互斥方案间的比选",{"key":27,"text":300,"correct":32},"项目群整体最优，表明其中的每个项目都是最优的",{"key":30,"text":302,"correct":32},"用差额内部收益率法比选计算期相同的互斥方案时，若差额IRR＜ic时，则保留投资多的方案",{"key":34,"text":304,"correct":22},"独立项目比选时，在满足资金约束条件下，所选择项目组合应使得总体效益最大","ABE",{"id":307,"libraryId":5,"type":40,"typeLabel":41,"stem":308,"options":309,"answer":20,"analysis":37},931141,"下列图表可用来收集和记录数据并进行分析的是( )。",[310,312,314,316],{"key":20,"text":311,"correct":22},"调查表",{"key":24,"text":313,"correct":32},"对策表",{"key":27,"text":315,"correct":32},"因果图",{"key":30,"text":317,"correct":32},"流程图",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":332,"analysis":37},931142,"以下关于测量系统分析相关术语的说法，正确的有( )。",[322,324,326,328,330],{"key":20,"text":323,"correct":32},"数字式指示装置的分辨力为最小分度值的一半",{"key":24,"text":325,"correct":32},"模拟式指示装置的分辨力为其末位数的一个步进值",{"key":27,"text":327,"correct":32},"基准值是人为规定的可接受值，可作为真值的替代",{"key":30,"text":329,"correct":22},"真值是未知不可知的，只能用基准值代之",{"key":34,"text":331,"correct":22},"测量系统性能是指测量系统变差的长期评估","DE",{"id":334,"libraryId":5,"type":40,"typeLabel":41,"stem":335,"options":336,"answer":27,"analysis":37},931143,"下面关于设备采购评标方法的描述，正确的是( )。",[337,339,341,343],{"key":20,"text":338,"correct":32},"经评审的最低投标价法保证最低投标价中标",{"key":24,"text":340,"correct":32},"评分法是经评审打分，得分最低者中标",{"key":27,"text":342,"correct":22},"综合评标价法是经计算的综合评标价最低者中标",{"key":30,"text":344,"correct":32},"全寿命费用评标价法是最高评标价中标",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":92,"analysis":37},931144,"因果图用于表达因果关系，通过识别症状、( )。",[349,351,353,355,357],{"key":20,"text":350,"correct":32},"设计新过程",{"key":24,"text":352,"correct":22},"寻找措施",{"key":27,"text":354,"correct":22},"促进问题解决",{"key":30,"text":356,"correct":22},"分析原因",{"key":34,"text":358,"correct":32},"评价过程",{"id":360,"libraryId":5,"type":40,"typeLabel":41,"stem":361,"options":362,"answer":24,"analysis":37},931145,"工作和工作之间的逻辑关系确定，但工作的持续时间不确定，应进行时间参数估算，并对按期完成任务的可能性做出评价的网络计划技术是( )。",[363,365,366,367],{"key":20,"text":364,"correct":32},"关键线路法",{"key":24,"text":141,"correct":22},{"key":27,"text":143,"correct":32},{"key":30,"text":145,"correct":32},{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":92,"analysis":37},931146,"不必要功能包括：( )。",[372,374,376,378,380],{"key":20,"text":373,"correct":32},"辅助功能",{"key":24,"text":375,"correct":22},"多余功能",{"key":27,"text":377,"correct":22},"重复功能",{"key":30,"text":379,"correct":22},"过剩功能",{"key":34,"text":381,"correct":32},"美学功能",{"id":383,"libraryId":5,"type":40,"typeLabel":41,"stem":384,"options":385,"answer":27,"analysis":37},931147,"某混凝土工程，9月份计划工程量为5000m3，计划单价为400元／m3；而9月份实际完成工程量为4000m3，实际单价为410元／m3，则该工程9月份的进度偏差为( )万元。",[386,388,390,392],{"key":20,"text":387,"correct":32},"-36",{"key":24,"text":389,"correct":32},"36",{"key":27,"text":391,"correct":22},"40",{"key":30,"text":393,"correct":32},"41",{"id":395,"libraryId":5,"type":40,"typeLabel":41,"stem":396,"options":397,"answer":27,"analysis":37},931148,"下列指标中，一般常用于评价不能够或者不需要修理的产品的是( )。",[398,400,402,404],{"key":20,"text":399,"correct":32},"使用寿命",{"key":24,"text":401,"correct":32},"有效度",{"key":27,"text":403,"correct":22},"可靠度",{"key":30,"text":405,"correct":32},"MTBF",{"id":407,"libraryId":5,"type":40,"typeLabel":41,"stem":408,"options":409,"answer":30,"analysis":37},931149,"有一个或一个以上不合格的单位产品称为( )。不合格品",[410,412,414,416],{"key":20,"text":411,"correct":32},"A类不合格品",{"key":24,"text":413,"correct":32},"B类不合格品",{"key":27,"text":415,"correct":32},"C类不合格品",{"key":30,"text":417,"correct":22},"不合格品",{"id":419,"libraryId":5,"type":40,"typeLabel":41,"stem":37,"options":420,"answer":24,"analysis":37},931150,[421,423,425,427],{"key":20,"text":422,"correct":32},"1",{"key":24,"text":424,"correct":22},"2",{"key":27,"text":426,"correct":32},"3",{"key":30,"text":428,"correct":32},"4",{"id":430,"libraryId":5,"type":40,"typeLabel":41,"stem":431,"options":432,"answer":24,"analysis":37},931151,"根据某设备工程网络计划计算，阀门安装工作的总时差为5天，自由时差为2天，该工作实际进度比计划拖后4天，表明( )。",[433,435,437,439],{"key":20,"text":434,"correct":32},"影响总工期l天",{"key":24,"text":436,"correct":22},"影响后续工作但不影响总工期",{"key":27,"text":438,"correct":32},"不影响后续工作",{"key":30,"text":440,"correct":32},"既不影响后续工作也不影响总工期",{"id":442,"libraryId":5,"type":40,"typeLabel":41,"stem":443,"options":444,"answer":27,"analysis":37},931152,"某贷款项目，银行贷款年利率为8%时，财务净现值为33.82万元；银行贷款年利率为10％时，财务净现值为-16.64万元，当银行贷款年利率为( )时，企业财务净现值恰好为零。",[445,447,449,451],{"key":20,"text":446,"correct":32},"8.06%",{"key":24,"text":448,"correct":32},"8.66％",{"key":27,"text":450,"correct":22},"9.34％",{"key":30,"text":452,"correct":32},"9.49％",{"id":454,"libraryId":5,"type":40,"typeLabel":41,"stem":455,"options":456,"answer":27,"analysis":37},931153,"过程能力的高低可用过程数据的( )来衡量。",[457,459,461,463],{"key":20,"text":458,"correct":32},"平均值",{"key":24,"text":460,"correct":32},"极差",{"key":27,"text":462,"correct":22},"标准差",{"key":30,"text":464,"correct":32},"期望值",{"id":466,"libraryId":5,"type":40,"typeLabel":41,"stem":37,"options":467,"answer":24,"analysis":37},931154,[468,470,472,474],{"key":20,"text":469,"correct":32},"有多个起点节点",{"key":24,"text":471,"correct":22},"有多个终点节点",{"key":27,"text":473,"correct":32},"有双向箭头联线",{"key":30,"text":475,"correct":32},"有循环回路",{"id":477,"libraryId":5,"type":40,"typeLabel":41,"stem":478,"options":479,"answer":20,"analysis":37},931155,"某双代号网络计划中(以天为时间单位)，工作K的最早开始时间为6，工作持续时间为4；工作M的最迟完成时间为22，工作持续时间为10；工作N的最迟完成时间为20，工作持续时间为5。己知工作K只有M、N两项紧后工作，工作K的总时差为( )天。",[480,481,482,484],{"key":20,"text":424,"correct":22},{"key":24,"text":426,"correct":32},{"key":27,"text":483,"correct":32},"5",{"key":30,"text":485,"correct":32},"6",{"id":487,"libraryId":5,"type":40,"typeLabel":41,"stem":488,"options":489,"answer":24,"analysis":37},931156,"在网络计划工期优化过程中，当出现多条关键线路时，为使工期缩短，应( )。",[490,492,494,496],{"key":20,"text":491,"correct":32},"压缩所需资源总量最少的一条关键线路",{"key":24,"text":493,"correct":22},"将各关键线路持续时间压缩为同一数值",{"key":27,"text":495,"correct":32},"压缩对质量和安全影响不大的部分关键线路",{"key":30,"text":497,"correct":32},"对不同的关键线路持续时间压缩不同的数值",{"id":499,"libraryId":5,"type":40,"typeLabel":41,"stem":500,"options":501,"answer":27,"analysis":37},931157,"设计验证的目的是验证设计输出是否满足( )的要求。",[502,504,506,508],{"key":20,"text":503,"correct":32},"设计确认",{"key":24,"text":505,"correct":32},"项目业主",{"key":27,"text":507,"correct":22},"设计输入",{"key":30,"text":509,"correct":32},"产品性能",{"id":511,"libraryId":5,"type":40,"typeLabel":41,"stem":512,"options":513,"answer":27,"analysis":37},931158,"质量控制中，直方图的绘制程序包括：①确定数据的极差；②收集数据信息；③统计频数；④确定所画直方图的组数及每组宽度；⑤画横坐标和纵坐标；⑥按纵坐标画出每个矩形的高度。其依次顺序为( )。",[514,516,518,520],{"key":20,"text":515,"correct":32},"①②③④⑤⑥",{"key":24,"text":517,"correct":32},"②①③④⑤⑥",{"key":27,"text":519,"correct":22},"②①④③⑤⑥",{"key":30,"text":521,"correct":32},"①②④③⑤⑥",{"id":523,"libraryId":5,"type":40,"typeLabel":41,"stem":524,"options":525,"answer":20,"analysis":37},931159,"不能清楚地显示各工作之间相互联系和制约关系的进度计划是( )。",[526,527,529,531],{"key":20,"text":137,"correct":22},{"key":24,"text":528,"correct":32},"双代号网络图",{"key":27,"text":530,"correct":32},"单代号网络图",{"key":30,"text":532,"correct":32},"单代号搭接网络图",{"id":534,"libraryId":5,"type":40,"typeLabel":41,"stem":37,"options":535,"answer":24,"analysis":37},931160,[536,538,540,542],{"key":20,"text":537,"correct":32},"基本事件",{"key":24,"text":539,"correct":22},"未探明事件",{"key":27,"text":541,"correct":32},"结果事件",{"key":30,"text":543,"correct":32},"开关事件",{"id":545,"libraryId":5,"type":40,"typeLabel":41,"stem":546,"options":547,"answer":24,"analysis":37},931161,"在雇用了总承包商的情况下，设备监理工程师需对设备工程总进度计划进行( )。",[548,550,552,554],{"key":20,"text":549,"correct":32},"编制",{"key":24,"text":551,"correct":22},"审核",{"key":27,"text":553,"correct":32},"编制或审核",{"key":30,"text":555,"correct":32},"修改",{"id":557,"libraryId":5,"type":40,"typeLabel":41,"stem":558,"options":559,"answer":27,"analysis":37},931162,"进口设备时，运输保险金额可以在( )的基础上适当加成。",[560,562,564,566],{"key":20,"text":561,"correct":32},"FOB价",{"key":24,"text":563,"correct":32},"CFR价",{"key":27,"text":565,"correct":22},"CIF价",{"key":30,"text":567,"correct":32},"FOB价加运费",{"id":569,"libraryId":5,"type":40,"typeLabel":41,"stem":570,"options":571,"answer":30,"analysis":37},931163,"单台设备的开发设计过程中，( )是将设备概念质量转化为设备规范质量的关键步骤。",[572,574,576,578],{"key":20,"text":573,"correct":32},"总体设计",{"key":24,"text":575,"correct":32},"初步设计",{"key":27,"text":577,"correct":32},"概念设计",{"key":30,"text":579,"correct":22},"工作图设计",{"id":581,"libraryId":5,"type":40,"typeLabel":41,"stem":37,"options":582,"answer":27,"analysis":37},931164,[583,585,587,589],{"key":20,"text":584,"correct":32},"小于10％",{"key":24,"text":586,"correct":32},"大于12％",{"key":27,"text":588,"correct":22},"在10％～12％之间",{"key":30,"text":590,"correct":32},"无法确定",{"id":592,"libraryId":5,"type":40,"typeLabel":41,"stem":593,"options":594,"answer":27,"analysis":37},931165,"承包商在开始制造前必须制定一套相应的质量目标文件，该义件一般采用( )方式，要便于检查证实。",[595,597,599,601],{"key":20,"text":596,"correct":32},"定性",{"key":24,"text":598,"correct":32},"定量",{"key":27,"text":600,"correct":22},"半定量",{"key":30,"text":602,"correct":32},"类比",{"id":604,"libraryId":5,"type":40,"typeLabel":41,"stem":605,"options":606,"answer":24,"analysis":37},931166,"设备监理工程师对详细进度计划进行审核的依据是( )。",[607,609,611,613],{"key":20,"text":608,"correct":32},"监理合同",{"key":24,"text":610,"correct":22},"业主与承包商签订的合同",{"key":27,"text":612,"correct":32},"设计图纸",{"key":30,"text":614,"correct":32},"国家的法律.法规及相关的规范.规程",{"id":616,"libraryId":5,"type":40,"typeLabel":41,"stem":37,"options":617,"answer":27,"analysis":37},931167,[618,620,622,624],{"key":20,"text":619,"correct":32},"工作B不影响工期，工作C影响工期1天",{"key":24,"text":621,"correct":32},"工作 A.C均不影响工期工作",{"key":27,"text":623,"correct":22},"C不影响工期，工作B影响工期1天",{"key":30,"text":625,"correct":32},"工作A进度正常，工作C各影响工期1天",{"id":627,"libraryId":5,"type":40,"typeLabel":41,"stem":628,"options":629,"answer":30,"analysis":37},931168,"工程项目质量保修是( )的组成内容。",[630,632,634,636],{"key":20,"text":631,"correct":32},"工程项目实体质量",{"key":24,"text":633,"correct":32},"工程项目使用功能",{"key":27,"text":635,"correct":32},"工程项目使用价格",{"key":30,"text":637,"correct":22},"工程项目工作质量",{"id":639,"libraryId":5,"type":40,"typeLabel":41,"stem":640,"options":641,"answer":27,"analysis":37},931169,"建筑安装企业组织施工生产和经营管理所需的费用是指( )。",[642,644,646,648],{"key":20,"text":643,"correct":32},"措施费",{"key":24,"text":645,"correct":32},"规费",{"key":27,"text":647,"correct":22},"企业管理费",{"key":30,"text":649,"correct":32},"其他直接费",[651,654,657,660,663,666],{"id":40,"name":652,"category":7,"favorite":653},"领导干部任职前廉政法规知识测试题",92,{"id":655,"name":656,"category":7,"favorite":40},595,"建筑结构与设备",{"id":658,"name":659,"category":7,"favorite":40},715,"招标采购专业知识与法律法规",{"id":661,"name":662,"category":7,"favorite":40},848,"市政方向-通用基础",{"id":664,"name":665,"category":7,"favorite":8},534,"BIM工程师",{"id":667,"name":665,"category":7,"favorite":8},535]