[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-603-2":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":648},{"id":5,"name":6,"category":7,"favorite":8},603,"质量、投资、进度控制","建筑工程",0,2,50,656,[13,37,51,66,77,89,101,113,124,136,148,160,172,184,196,208,220,232,239,251,263,275,283,295,307,319,331,343,355,370,382,397,409,424,436,450,462,476,488,503,515,530,542,557,569,584,596,610,622,636],{"id":14,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":17,"answer":35,"analysis":36},931070,"多选题","关于事件树绘制的以下说法，正确的是( )。",[18,22,25,29,32],{"key":19,"text":20,"correct":21},"A","可以发挥功能的状态画在上面的分枝",true,{"key":23,"text":24,"correct":21},"B","不能发挥功能的状态画在下面的分枝",{"key":26,"text":27,"correct":28},"C","首先考察各种安全功能的两种可能状态",false,{"key":30,"text":31,"correct":21},"D","首先考察初始事件一旦发生时最先起作用的安全功能",{"key":33,"text":34,"correct":28},"E","从结果事件开始，按事件发展过程自左向右绘制事件树","ABD","",{"id":38,"libraryId":5,"type":39,"typeLabel":40,"stem":41,"options":42,"answer":19,"analysis":36},931071,1,"单选题","QFD的重点放在关键和重要的( )改进上，使产品功能和质量在竞争中保持优势。",[43,45,47,49],{"key":19,"text":44,"correct":21},"质量特性",{"key":23,"text":46,"correct":28},"质量成本",{"key":26,"text":48,"correct":28},"质量标准",{"key":30,"text":50,"correct":28},"质量外延",{"id":52,"libraryId":5,"type":9,"typeLabel":15,"stem":53,"options":54,"answer":65,"analysis":36},931072,"树图的应用过程中提出手段和措施包括( )。",[55,57,59,61,63],{"key":19,"text":56,"correct":28},"确定手段和措施",{"key":23,"text":58,"correct":21},"从水平高的手段、措施开始，按顺序边想边提",{"key":26,"text":60,"correct":28},"对采取的手段和措施进行评价",{"key":30,"text":62,"correct":21},"先提出被认为是最低水平的手段、措施，一边编组，一边按顺序提出较高水平的手段、措施",{"key":33,"text":64,"correct":21},"不管水平的高低，以随意想到的方式提出手段、措施","BDE",{"id":67,"libraryId":5,"type":39,"typeLabel":40,"stem":36,"options":68,"answer":19,"analysis":36},931073,[69,71,73,75],{"key":19,"text":70,"correct":21},"工作A开始15天后，工作B才能完成",{"key":23,"text":72,"correct":28},"工作B开始15天后，工作A才能完成",{"key":26,"text":74,"correct":28},"工作A开始后的15天内，工作B必须完成",{"key":30,"text":76,"correct":28},"工作B开始后的15天内，工作A必须完成",{"id":78,"libraryId":5,"type":39,"typeLabel":40,"stem":79,"options":80,"answer":30,"analysis":36},931074,"工程网络计划资源优化的目的之一是为了寻求( )。",[81,83,85,87],{"key":19,"text":82,"correct":28},"资源均衡使用条件下的最短工期安排",{"key":23,"text":84,"correct":28},"工程总成本最低条件下的合理工期安排",{"key":26,"text":86,"correct":28},"资源使用量最少条件下的合理工期安排",{"key":30,"text":88,"correct":21},"工期固定条件下的资源均衡安排",{"id":90,"libraryId":5,"type":39,"typeLabel":40,"stem":91,"options":92,"answer":26,"analysis":36},931075,"某投资项目，当i=10%时，财务净现值为600万元；当i=15％时，财务净现值为-400万元，则当年利率i为( )时，企业财务净现值恰好为零。",[93,95,97,99],{"key":19,"text":94,"correct":28},"11%",{"key":23,"text":96,"correct":28},"12％",{"key":26,"text":98,"correct":21},"13％",{"key":30,"text":100,"correct":28},"14％",{"id":102,"libraryId":5,"type":39,"typeLabel":40,"stem":103,"options":104,"answer":19,"analysis":36},931076,"我国已颁布的常用抽样检验标准中，计量抽样方案包括( )。",[105,107,109,111],{"key":19,"text":106,"correct":21},"序贯型",{"key":23,"text":108,"correct":28},"挑选型",{"key":26,"text":110,"correct":28},"连续型",{"key":30,"text":112,"correct":28},"周期型",{"id":114,"libraryId":5,"type":39,"typeLabel":40,"stem":36,"options":115,"answer":26,"analysis":36},931077,[116,118,120,122],{"key":19,"text":117,"correct":28},"4",{"key":23,"text":119,"correct":28},"3",{"key":26,"text":121,"correct":21},"2",{"key":30,"text":123,"correct":28},"1",{"id":125,"libraryId":5,"type":39,"typeLabel":40,"stem":126,"options":127,"answer":26,"analysis":36},931078,"在94版ISO9001中明确要求，“所要求的检验和试验及所建立的记录，应在质量计划或形成文件的程序详细规定”。其中“质量计划或形成文件的程序”是指( )。",[128,130,132,134],{"key":19,"text":129,"correct":28},"取样方法",{"key":23,"text":131,"correct":28},"抽样方案",{"key":26,"text":133,"correct":21},"检验文件",{"key":30,"text":135,"correct":28},"检验方法",{"id":137,"libraryId":5,"type":39,"typeLabel":40,"stem":138,"options":139,"answer":30,"analysis":36},931079,"经总监理工程师书面批准的分包单位承担分包任务的通知送( )。",[140,142,144,146],{"key":19,"text":141,"correct":28},"分包单位",{"key":23,"text":143,"correct":28},"设计单位",{"key":26,"text":145,"correct":28},"建设行政主管部门",{"key":30,"text":147,"correct":21},"总承包单位",{"id":149,"libraryId":5,"type":39,"typeLabel":40,"stem":150,"options":151,"answer":23,"analysis":36},931080,"( )是指项目活动或工作分解结构组成部分已完成的价值，用分配给该工作的预算来表示。",[152,154,156,158],{"key":19,"text":153,"correct":28},"计划价值",{"key":23,"text":155,"correct":21},"挣值",{"key":26,"text":157,"correct":28},"实际成本",{"key":30,"text":159,"correct":28},"机会成本",{"id":161,"libraryId":5,"type":39,"typeLabel":40,"stem":162,"options":163,"answer":30,"analysis":36},931081,"①确定对策；②确定每种对策的负责人与完成日期；③为工序编号；④确定存在问题。下列正确的对策表应用顺序为( )。",[164,166,168,170],{"key":19,"text":165,"correct":28},"①②③④",{"key":23,"text":167,"correct":28},"③①②④",{"key":26,"text":169,"correct":28},"①②④③",{"key":30,"text":171,"correct":21},"③④①②",{"id":173,"libraryId":5,"type":39,"typeLabel":40,"stem":174,"options":175,"answer":19,"analysis":36},931082,"在工程网络计划中，某工作的最迟完成时间与其最早完成时间的差值是( )。",[176,178,180,182],{"key":19,"text":177,"correct":21},"该工作的总时差",{"key":23,"text":179,"correct":28},"该工作的自由时差",{"key":26,"text":181,"correct":28},"该工作与其紧后工作之间的时间间隔",{"key":30,"text":183,"correct":28},"该工作的持续时间",{"id":185,"libraryId":5,"type":39,"typeLabel":40,"stem":186,"options":187,"answer":26,"analysis":36},931083,"职业健康安全体系策划与设计不包括( )。",[188,190,192,194],{"key":19,"text":189,"correct":28},"制定职业健康安全方针",{"key":23,"text":191,"correct":28},"制定职业健康安全目标、指标和管理方案",{"key":26,"text":193,"correct":21},"评估职业健康安全体系",{"key":30,"text":195,"correct":28},"确定组织机构和职责",{"id":197,"libraryId":5,"type":39,"typeLabel":40,"stem":198,"options":199,"answer":23,"analysis":36},931084,"在设备工程投资中，设备购置费由( )构成。",[200,202,204,206],{"key":19,"text":201,"correct":28},"设备原价、采购与装卸费用",{"key":23,"text":203,"correct":21},"设备原价、采购与储运费用",{"key":26,"text":205,"correct":28},"设备制造费用、储运与安装费用",{"key":30,"text":207,"correct":28},"设备制造费用、采购与保管费用",{"id":209,"libraryId":5,"type":39,"typeLabel":40,"stem":210,"options":211,"answer":23,"analysis":36},931085,"( )能做到不遗漏主要原因，同时又包括各种细枝原因，有利于全面、重点地解决问题。",[212,214,216,218],{"key":19,"text":213,"correct":28},"结果分解型",{"key":23,"text":215,"correct":21},"原因罗列型",{"key":26,"text":217,"correct":28},"工序分类型",{"key":30,"text":219,"correct":28},"过程方法型",{"id":221,"libraryId":5,"type":39,"typeLabel":40,"stem":222,"options":223,"answer":30,"analysis":36},931086,"在对投资项目进行不确定性分析时，通过( )来分析测算项目主要因素发生变化时对经济评价指标的影响及影响程度。",[224,226,228,230],{"key":19,"text":225,"correct":28},"盈亏平衡分析",{"key":23,"text":227,"correct":28},"可行性分析",{"key":26,"text":229,"correct":28},"概率分析",{"key":30,"text":231,"correct":21},"敏感性分析",{"id":233,"libraryId":5,"type":39,"typeLabel":40,"stem":36,"options":234,"answer":26,"analysis":36},931087,[235,236,237,238],{"key":19,"text":123,"correct":28},{"key":23,"text":121,"correct":28},{"key":26,"text":119,"correct":21},{"key":30,"text":117,"correct":28},{"id":240,"libraryId":5,"type":39,"typeLabel":40,"stem":241,"options":242,"answer":23,"analysis":36},931088,"某企业应用质量功能展开(QF D)来改进汽车车门，首先要做的工作是( )。",[243,245,247,249],{"key":19,"text":244,"correct":28},"进行汽车车门的工程特性分析",{"key":23,"text":246,"correct":21},"分析顾客需求及重要度",{"key":26,"text":248,"correct":28},"分析市场和技术竞争能力",{"key":30,"text":250,"correct":28},"确定工程特性及重要度",{"id":252,"libraryId":5,"type":39,"typeLabel":40,"stem":253,"options":254,"answer":19,"analysis":36},931089,"2003年8月1日起实施的中国强制性产品认证制度，要求统一使用的强制性产品认证标志是( )。",[255,257,259,261],{"key":19,"text":256,"correct":21},"CCC",{"key":23,"text":258,"correct":28},"CSA",{"key":26,"text":260,"correct":28},"CE",{"key":30,"text":262,"correct":28},"AAA",{"id":264,"libraryId":5,"type":39,"typeLabel":40,"stem":265,"options":266,"answer":26,"analysis":36},931090,"在网络计划优化中，资源有限一工期最短的优化目的在于( )。",[267,269,271,273],{"key":19,"text":268,"correct":28},"通过压缩计算工期以达到要求工期目标",{"key":23,"text":270,"correct":28},"寻求工程总费用最低的工期安排",{"key":26,"text":272,"correct":21},"寻求满足资源限制条件的最短工期安排",{"key":30,"text":274,"correct":28},"寻求在计划工期不变的条件下使资源运用最均衡的计划安排",{"id":276,"libraryId":5,"type":39,"typeLabel":40,"stem":277,"options":278,"answer":30,"analysis":36},931091,"下列故障树名词术语与符号搭配错误的是( )。",[279,280,281,282],{"key":19,"text":36,"correct":28},{"key":23,"text":36,"correct":28},{"key":26,"text":36,"correct":28},{"key":30,"text":36,"correct":21},{"id":284,"libraryId":5,"type":39,"typeLabel":40,"stem":285,"options":286,"answer":23,"analysis":36},931092,"在设备工程进度监测系统中，对所收集的原始数据进行整理、统计和分析属于( )子系统的功能。",[287,289,291,293],{"key":19,"text":288,"correct":28},"数据生成",{"key":23,"text":290,"correct":21},"数据处理",{"key":26,"text":292,"correct":28},"数据对比",{"key":30,"text":294,"correct":28},"数据调整",{"id":296,"libraryId":5,"type":39,"typeLabel":40,"stem":297,"options":298,"answer":26,"analysis":36},931093,"单代号网络图中工作的最早完成时间等于( )。",[299,301,303,305],{"key":19,"text":300,"correct":28},"该工作的各个紧前工作的最早完成时间的最大值",{"key":23,"text":302,"correct":28},"该工作的各个紧前工作的最早完成时间的最小值",{"key":26,"text":304,"correct":21},"该工作的最早开始加上该工作的持续时间",{"key":30,"text":306,"correct":28},"该工作的最迟开始时间减该工作的自由时差",{"id":308,"libraryId":5,"type":39,"typeLabel":40,"stem":309,"options":310,"answer":30,"analysis":36},931094,"( )是价值工程的目的。",[311,313,315,317],{"key":19,"text":312,"correct":28},"降低工期",{"key":23,"text":314,"correct":28},"降低成本",{"key":26,"text":316,"correct":28},"提高功能",{"key":30,"text":318,"correct":21},"提高价值",{"id":320,"libraryId":5,"type":39,"typeLabel":40,"stem":321,"options":322,"answer":23,"analysis":36},931095,"通常将PDCA的质量管理过程方法用于设备制造的全过程。下列选项中，对C过程的正确描述是( )。",[323,325,327,329],{"key":19,"text":324,"correct":28},"为提供结果建立必要的目标和过程",{"key":23,"text":326,"correct":21},"对过程和设备进行监视和测量，并报告结果",{"key":26,"text":328,"correct":28},"采取措施，以持续改进过程业绩",{"key":30,"text":330,"correct":28},"实施的过程",{"id":332,"libraryId":5,"type":39,"typeLabel":40,"stem":333,"options":334,"answer":30,"analysis":36},931096,"在某工程网络计划中，已知工作M的总时差和自由时差分别为4天和2天，监理工程师检查实际进度时发现该工作的持续时间延长了5天，说明此时工作M的实际进度( )。",[335,337,339,341],{"key":19,"text":336,"correct":28},"既不影响总工期，也不影响其后续工作的正常进行",{"key":23,"text":338,"correct":28},"不影响总工期，但将其紧后工作的开始时间推迟5天",{"key":26,"text":340,"correct":28},"将其后续工作的开始时间推迟5天，并使总工期延长3天",{"key":30,"text":342,"correct":21},"将其后续工作的开始时间推迟3天，并使总工期延长1天",{"id":344,"libraryId":5,"type":39,"typeLabel":40,"stem":345,"options":346,"answer":23,"analysis":36},931097,"在电子元器件中，常在一个预应力下进行元器件的筛选试验，淘汰那些可靠性经不起考验的元器件。其采用的可靠性技术是( )。",[347,349,351,353],{"key":19,"text":348,"correct":28},"冗余技术",{"key":23,"text":350,"correct":21},"预应力筛选",{"key":26,"text":352,"correct":28},"应力一强度设计",{"key":30,"text":354,"correct":28},"潜在通路分析",{"id":356,"libraryId":5,"type":9,"typeLabel":15,"stem":357,"options":358,"answer":369,"analysis":36},931098,"ISO 9000：2005《质量管理体系基础和术语》包括( )。",[359,361,363,365,367],{"key":19,"text":360,"correct":21},"八项质量管理原则",{"key":23,"text":362,"correct":21},"十二项质量管理体系基础",{"key":26,"text":364,"correct":21},"术语和定义",{"key":30,"text":366,"correct":28},"质量管理体系通用要求",{"key":33,"text":368,"correct":28},"卓越绩效的要求","ABC",{"id":371,"libraryId":5,"type":39,"typeLabel":40,"stem":372,"options":373,"answer":19,"analysis":36},931099,"下列选项中，不属于八项质量管理原则的是( )。",[374,376,378,380],{"key":19,"text":375,"correct":21},"提高质量标准",{"key":23,"text":377,"correct":28},"持续改进",{"key":26,"text":379,"correct":28},"领导作用",{"key":30,"text":381,"correct":28},"全员参与",{"id":383,"libraryId":5,"type":9,"typeLabel":15,"stem":384,"options":385,"answer":396,"analysis":36},931100,"在采用强制确定法选择价值工程分析对象时，下列说法正确的是( )。",[386,388,390,392,394],{"key":19,"text":387,"correct":21},"若价值系数远远小于1，则应对评价对象进行价值工程分析",{"key":23,"text":389,"correct":21},"若价值系数远远小于1，说明评价对象所耗成本较高，存在降低成本的潜力",{"key":26,"text":391,"correct":28},"若价值系数远远大于1，说明评价对象所耗成本较高，存在降低成本的潜力",{"key":30,"text":393,"correct":28},"若价值系数等于1，说明评价对象成本过高",{"key":33,"text":395,"correct":21},"若价值系数等于1，说明评价对象的功能重要程度与成本的比重属合理匹配","ABE",{"id":398,"libraryId":5,"type":39,"typeLabel":40,"stem":399,"options":400,"answer":30,"analysis":36},931101,"关于关键线路和关键工作叙述不正确的有( )。",[401,403,405,407],{"key":19,"text":402,"correct":28},"在网络计划中，总时差最小的作为关键工作",{"key":23,"text":404,"correct":28},"从起点节点到终点节点的通路中，各项工作持续时间总和最大的是关键线路",{"key":26,"text":406,"correct":28},"关键线路上可能有虚工作存在",{"key":30,"text":408,"correct":21},"开始节点和完成节点均是关键节点的工作一定是关键工作",{"id":410,"libraryId":5,"type":9,"typeLabel":15,"stem":411,"options":412,"answer":423,"analysis":36},931102,"监理工程师对施工现场劳动组织及作业人员上岗资格的控制主要是指( )。",[413,415,417,419,421],{"key":19,"text":414,"correct":21},"检查从事作业活动的操作者数量是否满足需要、工种配置是否合理",{"key":23,"text":416,"correct":21},"检查作业活动的直接负责人，专职质检人员是否在岗",{"key":26,"text":418,"correct":21},"检查紧急情况的应急处理规定",{"key":30,"text":420,"correct":21},"检查和核实从事特殊作业的是否持证上岗",{"key":33,"text":422,"correct":28},"相关制度的落实情况","ABCD",{"id":425,"libraryId":5,"type":39,"typeLabel":40,"stem":426,"options":427,"answer":30,"analysis":36},931103,"监理工程师在收到承包单位的隐蔽工程检验申请后，首先对质量证明资料进行审查，并在合同规定的时间内到现场检查，此时，( )应随同一起到现场。",[428,430,432,434],{"key":19,"text":429,"correct":28},"设计单位代表",{"key":23,"text":431,"correct":28},"项目技术负责人",{"key":26,"text":433,"correct":28},"建设单位代表",{"key":30,"text":435,"correct":21},"承包方专职质检员和相关施工人员",{"id":437,"libraryId":5,"type":9,"typeLabel":15,"stem":36,"options":438,"answer":449,"analysis":36},931104,[439,441,443,445,447],{"key":19,"text":440,"correct":28},"本工作已按计划完成",{"key":23,"text":442,"correct":21},"在第2月前半月内没有进行本工作",{"key":26,"text":444,"correct":21},"在第3月内本工作实际完成的任务量大于计划任务量",{"key":30,"text":446,"correct":28},"到第4月末，本工作拖欠5％的任务量",{"key":33,"text":448,"correct":21},"在第5月内，本工作拖欠10％的任务量","BCE",{"id":451,"libraryId":5,"type":39,"typeLabel":40,"stem":452,"options":453,"answer":23,"analysis":36},931105,"在某工程双代号网络计划中，如果以某关键节点为完成节点的工作有2项，则该两项工作( )。",[454,456,458,460],{"key":19,"text":455,"correct":28},"全部为关键工作",{"key":23,"text":457,"correct":21},"至少有一项为关键工作",{"key":26,"text":459,"correct":28},"自由时差相等",{"key":30,"text":461,"correct":28},"总时差相等",{"id":463,"libraryId":5,"type":9,"typeLabel":15,"stem":464,"options":465,"answer":423,"analysis":36},931106,"下列财务评价指标中，属于动态指标的有( )。",[466,468,470,472,474],{"key":19,"text":467,"correct":21},"净现值",{"key":23,"text":469,"correct":21},"内部收益率",{"key":26,"text":471,"correct":21},"净年值",{"key":30,"text":473,"correct":21},"净现值率",{"key":33,"text":475,"correct":28},"总投资收益率",{"id":477,"libraryId":5,"type":39,"typeLabel":40,"stem":478,"options":479,"answer":23,"analysis":36},931107,"某承包商从一生产厂家购买了相同规格的大批预制构件，进场后码放整齐。对其进行进场检验时，为了使样本更有代表性宜采用( )的方法。",[480,482,484,486],{"key":19,"text":481,"correct":28},"全数检验",{"key":23,"text":483,"correct":21},"分层抽样",{"key":26,"text":485,"correct":28},"简单随机抽样",{"key":30,"text":487,"correct":28},"等距抽样",{"id":489,"libraryId":5,"type":9,"typeLabel":15,"stem":490,"options":491,"answer":502,"analysis":36},931108,"设备质量监理的原则包括( )。",[492,494,496,498,500],{"key":19,"text":493,"correct":28},"经济利益最大化",{"key":23,"text":495,"correct":21},"过程与结果并重",{"key":26,"text":497,"correct":21},"对雇主负责",{"key":30,"text":499,"correct":21},"遵守职业道德规范",{"key":33,"text":501,"correct":21},"坚持标准，严守合同","BCDE",{"id":504,"libraryId":5,"type":39,"typeLabel":40,"stem":505,"options":506,"answer":30,"analysis":36},931109,"某机械设备已使用多年，拟进行大修。当前市场变现价值为80万元，预计大修理费用为100万元。大修后可继续使用4年，平均每年生产产品50吨，年经营成本为40万元，4年后设备残值忽略不计。假设基准收益率为10%，则大修后的单位产品生产成本是( )万元\u002F吨。[(A\u002FP，10%，4)=0.315]",[507,509,511,513],{"key":19,"text":508,"correct":28},"0.63",{"key":23,"text":510,"correct":28},"1.134",{"key":26,"text":512,"correct":28},"1.43",{"key":30,"text":514,"correct":21},"1.934",{"id":516,"libraryId":5,"type":9,"typeLabel":15,"stem":517,"options":518,"answer":529,"analysis":36},931110,"在网络计划中，“工期一费用优化”的目的在于寻求( )。",[519,521,523,525,527],{"key":19,"text":520,"correct":21},"工期规定条件下的最低费用安排",{"key":23,"text":522,"correct":28},"工期最短的最低费用安排",{"key":26,"text":524,"correct":28},"直接费用最低的工期安排",{"key":30,"text":526,"correct":28},"间接费用最低的工期安排",{"key":33,"text":528,"correct":21},"总费用最低的工期安排","AE",{"id":531,"libraryId":5,"type":39,"typeLabel":40,"stem":532,"options":533,"answer":30,"analysis":36},931111,"用来发现和确认两组相关数据之间的关系并确认两组相关数据之间预期的质量控制统计方法是( )。",[534,536,538,540],{"key":19,"text":535,"correct":28},"分层图法",{"key":23,"text":537,"correct":28},"因果图法",{"key":26,"text":539,"correct":28},"排列图法",{"key":30,"text":541,"correct":21},"散布图法",{"id":543,"libraryId":5,"type":9,"typeLabel":15,"stem":544,"options":545,"answer":556,"analysis":36},931112,"可行性研究报告的内容包括( )。",[546,548,550,552,554],{"key":19,"text":547,"correct":21},"市场调查与市场预测",{"key":23,"text":549,"correct":21},"建设规模与产品方案",{"key":26,"text":551,"correct":28},"设计概算",{"key":30,"text":553,"correct":21},"节能措施",{"key":33,"text":555,"correct":21},"节水措施","ABDE",{"id":558,"libraryId":5,"type":39,"typeLabel":40,"stem":559,"options":560,"answer":19,"analysis":36},931113,"某企业第1年初向银行借款500万元，年利率为7%，银行规定每季度计息一次。若企业向银行所借本金与利息均在第4年末一次支付，则支付额为( )万元。",[561,563,565,567],{"key":19,"text":562,"correct":21},"659.96",{"key":23,"text":564,"correct":28},"659.45",{"key":26,"text":566,"correct":28},"655.40",{"key":30,"text":568,"correct":28},"535.93",{"id":570,"libraryId":5,"type":9,"typeLabel":15,"stem":571,"options":572,"answer":583,"analysis":36},931114,"失效模式及影响分析的流程包括( )。",[573,575,577,579,581],{"key":19,"text":574,"correct":21},"描述产品或过程",{"key":23,"text":576,"correct":28},"简化系统图",{"key":26,"text":578,"correct":21},"定义功能",{"key":30,"text":580,"correct":21},"确定原因并归类",{"key":33,"text":582,"correct":21},"计算危害程度","ACDE",{"id":585,"libraryId":5,"type":39,"typeLabel":40,"stem":586,"options":587,"answer":30,"analysis":36},931115,"在建设工程进度控制计划体系中，具体安排单位工程的开工日期和竣工日期的计划是( )。",[588,590,592,594],{"key":19,"text":589,"correct":28},"工程项目进度平衡表",{"key":23,"text":591,"correct":28},"单位工程施工进度计划‘",{"key":26,"text":593,"correct":28},"工程项目前期工作计划",{"key":30,"text":595,"correct":21},"工程项目总进度计划",{"id":597,"libraryId":5,"type":9,"typeLabel":15,"stem":598,"options":599,"answer":35,"analysis":36},931116,"下列关于项目敏感性分析的说法，正确的有( )。",[600,602,604,606,608],{"key":19,"text":601,"correct":21},"敏感性分析可以作为风险因素识别和风险估计的依据",{"key":23,"text":603,"correct":21},"不确定因素的敏感性系数越高，表明该因素对经济指标的影响越大",{"key":26,"text":605,"correct":28},"敏感性分析只适合单因素分析",{"key":30,"text":607,"correct":21},"若将固定成本作为不确定因素，当其超出临界点时，项目将变为不可行",{"key":33,"text":609,"correct":28},"敏感性分析指标只能选用NPV或IRR",{"id":611,"libraryId":5,"type":39,"typeLabel":40,"stem":612,"options":613,"answer":23,"analysis":36},931117,"某项目贷款500万元，贷款年利率为12%，银行要求分5年等额偿还，则每年年末还款额应为( )万元。",[614,616,618,620],{"key":19,"text":615,"correct":28},"100",{"key":23,"text":617,"correct":21},"138.70",{"key":26,"text":619,"correct":28},"143.78",{"key":30,"text":621,"correct":28},"160",{"id":623,"libraryId":5,"type":9,"typeLabel":15,"stem":624,"options":625,"answer":65,"analysis":36},931118,"某设备工程进度计划在执行过程中，已知工作M的总时差和自由时差分别为6天和3天，在进行进度检查时，发现该工作比原计划拖延了4天，则此时的进度状况是( )。",[626,628,630,632,634],{"key":19,"text":627,"correct":28},"总工期将会延长",{"key":23,"text":629,"correct":21},"后续工作受到影响",{"key":26,"text":631,"correct":28},"工作M总时差减少3天",{"key":30,"text":633,"correct":21},"工作M尚有总时差2天",{"key":33,"text":635,"correct":21},"紧后工作最早开始时间向后推迟1天",{"id":637,"libraryId":5,"type":39,"typeLabel":40,"stem":638,"options":639,"answer":26,"analysis":36},931119,"根据价值工程理论，产品全寿命周期成本是指( )。",[640,642,644,646],{"key":19,"text":641,"correct":28},"生产全过程发生的全部费用",{"key":23,"text":643,"correct":28},"从开始使用至报废过程中发生的费用总和",{"key":26,"text":645,"correct":21},"从研制、生产到销售、使用的全过程发生的全部费用",{"key":30,"text":647,"correct":28},"产品使用费用",[649,652,655,658,661,664],{"id":39,"name":650,"category":7,"favorite":651},"领导干部任职前廉政法规知识测试题",92,{"id":653,"name":654,"category":7,"favorite":39},595,"建筑结构与设备",{"id":656,"name":657,"category":7,"favorite":39},715,"招标采购专业知识与法律法规",{"id":659,"name":660,"category":7,"favorite":39},848,"市政方向-通用基础",{"id":662,"name":663,"category":7,"favorite":8},534,"BIM工程师",{"id":665,"name":663,"category":7,"favorite":8},535]