[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-603-13":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":664},{"id":5,"name":6,"category":7,"favorite":8},603,"质量、投资、进度控制","建筑工程",0,13,50,656,[13,34,46,64,76,91,106,121,133,145,160,171,184,196,208,221,233,248,263,278,290,301,315,327,341,353,365,378,390,398,412,426,438,450,458,470,485,493,501,516,528,542,557,572,584,596,611,623,638,652],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},931620,1,"单选题","在网络计划工期优化过程中，当出现多条关键线路时，必须( )。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","将各条关键线路的总持续时间压缩同一数值；",true,{"key":24,"text":25,"correct":26},"B","压缩所需资源总量最少的一条关键线路；",false,{"key":28,"text":29,"correct":26},"C","压缩其中一条关键线路的总持续时间；",{"key":31,"text":32,"correct":26},"D","分别将各条关键线路的总持续时间压缩不同的数值。","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},931621,"当下列因素变动时，不会引起盈亏平衡点发生变动的是( )。",[38,40,42,44],{"key":20,"text":39,"correct":22},"销售量",{"key":24,"text":41,"correct":26},"单位变动成本",{"key":28,"text":43,"correct":26},"固定成本",{"key":31,"text":45,"correct":26},"产品单位售价",{"id":47,"libraryId":5,"type":48,"typeLabel":49,"stem":50,"options":51,"answer":63,"analysis":33},931622,2,"多选题","与网络图相比，横道图的不足有( )。",[52,54,56,58,60],{"key":20,"text":53,"correct":26},"不便于统计完成计划所需资源的时间分布",{"key":24,"text":55,"correct":22},"较难判断计划方案优劣",{"key":28,"text":57,"correct":26},"不便于工序进展状况的检查",{"key":31,"text":59,"correct":22},"不能计算各项工作的各类时间参数",{"key":61,"text":62,"correct":22},"E","不能明确显示工作的关键程度","BDE",{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":24,"analysis":33},931623,"网络计划资源优化中“工期固定一资源均衡优化”的含义是指( )。",[68,70,72,74],{"key":20,"text":69,"correct":26},"资源有限条件下的最短工期安排",{"key":24,"text":71,"correct":22},"工期不变条件下的资源均衡安排",{"key":28,"text":73,"correct":26},"工期最短条件下的资源均衡安排",{"key":31,"text":75,"correct":26},"工期最优条件下的资源均衡安排",{"id":77,"libraryId":5,"type":48,"typeLabel":49,"stem":78,"options":79,"answer":90,"analysis":33},931624,"下列关于直方图的说法，正确的有( )。",[80,82,84,86,88],{"key":20,"text":81,"correct":26},"孤岛型直方图主要是由于操作者的心理因素和习惯而引起的",{"key":24,"text":83,"correct":22},"直方图是反映一个变量分布状态的条形图",{"key":28,"text":85,"correct":22},"正常型直方图具有两边低、中间高、左右对称的特点",{"key":31,"text":87,"correct":22},"双峰型直方图是由于两种不同分布混合在一起而造成的",{"key":61,"text":89,"correct":26},"偏峰型直方图是由于分析时夹杂了其他分布的少量数据而造成的","BCD",{"id":92,"libraryId":5,"type":48,"typeLabel":49,"stem":93,"options":94,"answer":105,"analysis":33},931625,"管理体系认证分为( )。",[95,97,99,101,103],{"key":20,"text":96,"correct":26},"产品体系认证",{"key":24,"text":98,"correct":22},"质量管理体系认证",{"key":28,"text":100,"correct":22},"环境管理体系认证",{"key":31,"text":102,"correct":26},"产品质量认证",{"key":61,"text":104,"correct":22},"职业健康安全管理体系认证","BCE",{"id":107,"libraryId":5,"type":48,"typeLabel":49,"stem":108,"options":109,"answer":120,"analysis":33},931626,"影响抽样误差的因素主要来自( )方面：",[110,112,114,116,118],{"key":20,"text":111,"correct":22},"样本容量",{"key":24,"text":113,"correct":22},"总体标志值的差异程度",{"key":28,"text":115,"correct":26},"收集整理质量数据",{"key":31,"text":117,"correct":22},"抽样方法",{"key":61,"text":119,"correct":26},"统计分析","ABD",{"id":122,"libraryId":5,"type":15,"typeLabel":16,"stem":123,"options":124,"answer":24,"analysis":33},931627,"编制设备安装工程概算时，当初步设计深度不够，设备清单不详细，只有主体设备或仅有成套设备重量时，可采用( )编制概算。",[125,127,129,131],{"key":20,"text":126,"correct":26},"概算指标法",{"key":24,"text":128,"correct":22},"扩大单价法",{"key":28,"text":130,"correct":26},"预算单价法",{"key":31,"text":132,"correct":26},"设备费的百分比法",{"id":134,"libraryId":5,"type":15,"typeLabel":16,"stem":135,"options":136,"answer":24,"analysis":33},931628,"在某工程单代号网络计划中，下列说法不正确的是( )。",[137,139,141,143],{"key":20,"text":138,"correct":26},"至少有一条关键线路",{"key":24,"text":140,"correct":22},"在计划实施过程中，关键线路始终不会改变",{"key":28,"text":142,"correct":26},"关键工作的机动时间最小",{"key":31,"text":144,"correct":26},"相邻关键工作之间的时间间隔为零",{"id":146,"libraryId":5,"type":48,"typeLabel":49,"stem":147,"options":148,"answer":159,"analysis":33},931629,"在项目决策阶段，可作为工程投资确定的重要依据的工程技术文件有( )。",[149,151,153,155,157],{"key":20,"text":150,"correct":22},"项目意向书",{"key":24,"text":152,"correct":22},"项目建议书",{"key":28,"text":154,"correct":22},"可行性研究报告",{"key":31,"text":156,"correct":26},"有关设计资料",{"key":61,"text":158,"correct":26},"工程招标文件","ABC",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":162,"answer":24,"analysis":33},931630,[163,165,167,169],{"key":20,"text":164,"correct":26},"甲、乙组合",{"key":24,"text":166,"correct":22},"乙、丙组合",{"key":28,"text":168,"correct":26},"甲、丙组合",{"key":31,"text":170,"correct":26},"甲、乙、丙组合",{"id":172,"libraryId":5,"type":48,"typeLabel":49,"stem":33,"options":173,"answer":63,"analysis":33},931631,[174,176,178,180,182],{"key":20,"text":175,"correct":26},"节点编号不对",{"key":24,"text":177,"correct":22},"有无箭头的连接",{"key":28,"text":179,"correct":26},"有循环回路",{"key":31,"text":181,"correct":22},"多个起点节点",{"key":61,"text":183,"correct":22},"有多余虚工作",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":24,"analysis":33},931632,"网络计划的工期优化是指( )。",[188,190,192,194],{"key":20,"text":189,"correct":26},"寻求网络计划的最短工期",{"key":24,"text":191,"correct":22},"当计算工期大于要求工期时，通过压缩关键工作的持续时间，寻求满足工期要求的网络计划",{"key":28,"text":193,"correct":26},"寻求网络计划最短工期的资源均衡",{"key":31,"text":195,"correct":26},"寻求网络计划最短工期下的费用最低",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":24,"analysis":33},931633,"依据《评标委员会和评标方法暂行规定》，属于初步评审内容的是( )。",[200,202,204,206],{"key":20,"text":201,"correct":26},"投资环境评审",{"key":24,"text":203,"correct":22},"商务性评审",{"key":28,"text":205,"correct":26},"招标文件评审",{"key":31,"text":207,"correct":26},"融资方案评审",{"id":209,"libraryId":5,"type":48,"typeLabel":49,"stem":33,"options":210,"answer":105,"analysis":33},931634,[211,213,215,217,219],{"key":20,"text":212,"correct":26},"工作C为斜向箭线",{"key":24,"text":214,"correct":22},"网络计划中存在循环回路",{"key":28,"text":216,"correct":22},"有的工作出现了双向箭头",{"key":31,"text":218,"correct":26},"有的工作无箭头",{"key":61,"text":220,"correct":22},"虚工作④～⑥可有可无",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":20,"analysis":33},931635,"ISO9000：2000标准质量管理八项原则，首要的原则是( )。",[225,227,229,231],{"key":20,"text":226,"correct":22},"以顾客为关注焦点",{"key":24,"text":228,"correct":26},"领导作用",{"key":28,"text":230,"correct":26},"全员参与",{"key":31,"text":232,"correct":26},"过程方法",{"id":234,"libraryId":5,"type":48,"typeLabel":49,"stem":235,"options":236,"answer":247,"analysis":33},931636,"在下列实际进度与计划进度的比较方法中，可以从设备工程整体角度反映实际进度偏差的方法有( )。",[237,239,241,243,245],{"key":20,"text":238,"correct":26},"匀速进展横道图比较法",{"key":24,"text":240,"correct":26},"非匀速进展横道图比较法",{"key":28,"text":242,"correct":22},"前锋线比较法",{"key":31,"text":244,"correct":22},"S形曲线比较法",{"key":61,"text":246,"correct":22},"“香蕉”曲线比较法","CDE",{"id":249,"libraryId":5,"type":48,"typeLabel":49,"stem":250,"options":251,"answer":262,"analysis":33},931637,"某设备安装工程采用总承包发包，设备监理工程师在进度管理中，需审核的承包商文件包括( )。",[252,254,256,258,260],{"key":20,"text":253,"correct":22},"设备安装总进度计划",{"key":24,"text":255,"correct":22},"总承包商提交的进度报告",{"key":28,"text":257,"correct":22},"总承包商提交的进度调整方案",{"key":31,"text":259,"correct":26},"设备安装进度管理监理工作细则",{"key":61,"text":261,"correct":22},"工期索赔报告","ABCE",{"id":264,"libraryId":5,"type":48,"typeLabel":49,"stem":265,"options":266,"answer":277,"analysis":33},931638,"检验是产品形成过程中重要的质量保证要素，是PDCA(计划、实施、检查、处理)循环中一个重要阶段，具有( )作用。",[267,269,271,273,275],{"key":20,"text":268,"correct":26},"鉴别",{"key":24,"text":270,"correct":22},"把关",{"key":28,"text":272,"correct":22},"监督",{"key":31,"text":274,"correct":22},"报告",{"key":61,"text":276,"correct":22},"预防","BCDE",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":31,"analysis":33},931639,"投标报价应考虑风险费，正确的说法是( )。",[282,284,286,288],{"key":20,"text":283,"correct":26},"如果风险费有剩余，可与业主分享余额",{"key":24,"text":285,"correct":26},"如果风险费估计不足，可以索赔方式请业主支付",{"key":28,"text":287,"correct":26},"风险费在业主的基本预备费中开支",{"key":31,"text":289,"correct":22},"风险费估计不足，承包商只有用利润来补贴",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":292,"answer":20,"analysis":33},931640,[293,295,297,299],{"key":20,"text":294,"correct":22},"分别为1和0",{"key":24,"text":296,"correct":26},"均为1",{"key":28,"text":298,"correct":26},"分别为2和0",{"key":31,"text":300,"correct":26},"均为0",{"id":302,"libraryId":5,"type":48,"typeLabel":49,"stem":303,"options":304,"answer":105,"analysis":33},931641,"非标准设备制造合同价格的确定方法包括( )。",[305,307,309,311,313],{"key":20,"text":306,"correct":26},"投资估算指标法",{"key":24,"text":308,"correct":22},"成本计算估价法",{"key":28,"text":310,"correct":22},"定额估价法",{"key":31,"text":312,"correct":26},"市场价格法",{"key":61,"text":314,"correct":22},"系列设备插入估价法",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":28,"analysis":33},931642,"某项目第5年静态累计净现金流量开始出现正值，第4年年末累计净现金流量为-60万元，第5年当年净现金流量为240万元，则该项目的静态投资回收期为( )年。",[319,321,323,325],{"key":20,"text":320,"correct":26},"3.25",{"key":24,"text":322,"correct":26},"3.75",{"key":28,"text":324,"correct":22},"4.25",{"key":31,"text":326,"correct":26},"5.25",{"id":328,"libraryId":5,"type":48,"typeLabel":49,"stem":33,"options":329,"answer":340,"analysis":33},931643,[330,332,334,336,338],{"key":20,"text":331,"correct":22},"工作A的总时差为2天",{"key":24,"text":333,"correct":26},"工作B的最迟完成时间为第2天",{"key":28,"text":335,"correct":22},"工作C和E为关键工作",{"key":31,"text":337,"correct":26},"工作D的自由时差为1天",{"key":61,"text":339,"correct":22},"工作F的总时差和自由时差均为2天","ACE",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":24,"analysis":33},931644,"总包单位依法将建设工程分包时，分包工程发生的质量问题，应( )。",[345,347,349,351],{"key":20,"text":346,"correct":26},"由总包单位负责",{"key":24,"text":348,"correct":22},"由总包单位与分包单位承担连带责任",{"key":28,"text":350,"correct":26},"由分包单位负责",{"key":31,"text":352,"correct":26},"由总包单位、分包单位、监理单位共同负责",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":31,"analysis":33},931645,"施工承包单位按照监理工程师审查批准的配合比进行现场拌和材料的加工。如果现场作业条件发生变化需要对配合比进行调整时，则应执行( )程序。",[357,359,361,363],{"key":20,"text":358,"correct":26},"质量预控",{"key":24,"text":360,"correct":26},"承包商自检",{"key":28,"text":362,"correct":26},"质量检验",{"key":31,"text":364,"correct":22},"技术复核",{"id":366,"libraryId":5,"type":48,"typeLabel":49,"stem":33,"options":367,"answer":63,"analysis":33},931646,[368,370,372,374,376],{"key":20,"text":369,"correct":26},"总工期为20天",{"key":24,"text":371,"correct":22},"关键线路有1条",{"key":28,"text":373,"correct":26},"关键线路有2条",{"key":31,"text":375,"correct":22},"工作H的总时差为1天",{"key":61,"text":377,"correct":22},"工作D的自由时差为3天",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":20,"analysis":33},931647,"( )因果图的缺点是相同的原因可能在不同的工序上多次出现，不利于综合考虑问题发生的原因。",[382,384,386,388],{"key":20,"text":383,"correct":22},"工序分类型",{"key":24,"text":385,"correct":26},"过程分解型",{"key":28,"text":387,"correct":26},"结果分解型",{"key":31,"text":389,"correct":26},"原因罗列型",{"id":391,"libraryId":5,"type":48,"typeLabel":49,"stem":33,"options":392,"answer":63,"analysis":33},931648,[393,394,395,396,397],{"key":20,"text":175,"correct":26},{"key":24,"text":177,"correct":22},{"key":28,"text":179,"correct":26},{"key":31,"text":181,"correct":22},{"key":61,"text":183,"correct":22},{"id":399,"libraryId":5,"type":48,"typeLabel":49,"stem":400,"options":401,"answer":105,"analysis":33},931649,"在实际抽样检验中，一个好的抽样方案或OC曲线应当是( )",[402,404,406,408,410],{"key":20,"text":403,"correct":26},"当批质量好，p≤P1时，接收概率Ｌ(p)=1",{"key":24,"text":405,"correct":22},"当批质量好，p≤Po时，能以高概率接收",{"key":28,"text":407,"correct":22},"当批质量差于某个规定界限(p≥Po)时，能以高概率拒绝",{"key":31,"text":409,"correct":26},"当批质量差，p＞P1时，接收概率为Ｌ(p)=1",{"key":61,"text":411,"correct":22},"当产品批质量变坏，Po＜P1时，接收概率迅速减小",{"id":413,"libraryId":5,"type":48,"typeLabel":49,"stem":414,"options":415,"answer":277,"analysis":33},931650,"利用数据统计方法控制质量的步骤包括( )。",[416,418,420,422,424],{"key":20,"text":417,"correct":26},"存储质量数据",{"key":24,"text":419,"correct":22},"进行统计分析",{"key":28,"text":421,"correct":22},"判断质量问题",{"key":31,"text":423,"correct":22},"分析影响质量的因素",{"key":61,"text":425,"correct":22},"拟定改进质量的措施",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":31,"analysis":33},931651,"某分部工程有两个施工过程，各分为4个施工段组织流水施工，流水节拍分别为3、4、3、3和2、5、4、3天，则流水步距和流水施工工期分别为( )天。",[430,432,434,436],{"key":20,"text":431,"correct":26},"3和16",{"key":24,"text":433,"correct":26},"3和17",{"key":28,"text":435,"correct":26},"5和18",{"key":31,"text":437,"correct":22},"5和19",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":24,"analysis":33},931652,"当过程处于受控状态后，用( )对其进行维护。",[442,444,446,448],{"key":20,"text":443,"correct":26},"树状图",{"key":24,"text":445,"correct":22},"控制图",{"key":28,"text":447,"correct":26},"直方图",{"key":31,"text":449,"correct":26},"因果分析图",{"id":451,"libraryId":5,"type":48,"typeLabel":49,"stem":33,"options":452,"answer":90,"analysis":33},931653,[453,454,455,456,457],{"key":20,"text":33,"correct":26},{"key":24,"text":33,"correct":22},{"key":28,"text":33,"correct":22},{"key":31,"text":33,"correct":22},{"key":61,"text":33,"correct":26},{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":20,"analysis":33},931654,"下列关于偿债备付率指标的说法，正确的是( )。",[462,464,466,468],{"key":20,"text":463,"correct":22},"偿债备付率表示可用于还本付息的资金偿还借款本息的保障程度",{"key":24,"text":465,"correct":26},"偿债备付率是税息前利润与当期应付利息费用的比值",{"key":28,"text":467,"correct":26},"偿债备付率若大于1，表示偿债能力不足",{"key":31,"text":469,"correct":26},"偿债备付率从付息资金来源充足性角度反映项目偿付债务利息的保障程度",{"id":471,"libraryId":5,"type":48,"typeLabel":49,"stem":472,"options":473,"answer":484,"analysis":33},931655,"《建筑工程施工发包与承包计价管理办法》(建设部令第107号)规定，建设工程招标投标的计价可采用( )。",[474,476,478,480,482],{"key":20,"text":475,"correct":22},"工料单价法",{"key":24,"text":477,"correct":26},"实物单价法",{"key":28,"text":479,"correct":26},"工程量清单法",{"key":31,"text":481,"correct":22},"综合单价法",{"key":61,"text":483,"correct":26},"定额指标法","AD",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":487,"answer":20,"analysis":33},931656,[488,490,491,492],{"key":20,"text":489,"correct":22},"分别为l和0",{"key":24,"text":296,"correct":26},{"key":28,"text":298,"correct":26},{"key":31,"text":300,"correct":26},{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":20,"analysis":33},931657,"( )的缺点是相同的原因可能在不同的工序上多次出现，不利于综合考虑问题发生的原因。",[497,498,499,500],{"key":20,"text":383,"correct":22},{"key":24,"text":385,"correct":26},{"key":28,"text":387,"correct":26},{"key":31,"text":389,"correct":26},{"id":502,"libraryId":5,"type":48,"typeLabel":49,"stem":503,"options":504,"answer":515,"analysis":33},931658,"设备监理单位对成套设备项目设计中交接点复查与核实的重点应为( )等各项衔接关系",[505,507,509,511,513],{"key":20,"text":506,"correct":22},"连接方式",{"key":24,"text":508,"correct":26},"连接状态",{"key":28,"text":510,"correct":22},"连接尺寸",{"key":31,"text":512,"correct":22},"交接点参数",{"key":61,"text":514,"correct":26},"成套设备与外部其他交通路径的接口","ACD",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":24,"analysis":33},931659,"( )是指根据被检验样本中的产品包含不合格数的多少来推断是否要接收整批产品的活动。",[520,522,524,526],{"key":20,"text":521,"correct":26},"计件抽样检验",{"key":24,"text":523,"correct":22},"计点抽样检验",{"key":28,"text":525,"correct":26},"计数抽样检验",{"key":31,"text":527,"correct":26},"计量抽样检验",{"id":529,"libraryId":5,"type":48,"typeLabel":49,"stem":530,"options":531,"answer":63,"analysis":33},931660,"管理的系统方法是八项质量管理原则之一，管理的系统方法可包括( )环节。",[532,534,536,538,540],{"key":20,"text":533,"correct":26},"系统收集",{"key":24,"text":535,"correct":22},"系统分析",{"key":28,"text":537,"correct":26},"系统计算",{"key":31,"text":539,"correct":22},"系统管理",{"key":61,"text":541,"correct":22},"系统工程",{"id":543,"libraryId":5,"type":48,"typeLabel":49,"stem":544,"options":545,"answer":556,"analysis":33},931661,"6σ有两层含义，分别基于基于( )。",[546,548,550,552,554],{"key":20,"text":547,"correct":26},"经济角度",{"key":24,"text":549,"correct":26},"技术角度",{"key":28,"text":551,"correct":22},"管理角度",{"key":31,"text":553,"correct":26},"协调角度",{"key":61,"text":555,"correct":22},"统计角度","CE",{"id":558,"libraryId":5,"type":48,"typeLabel":49,"stem":559,"options":560,"answer":571,"analysis":33},931662,"与横道计划相比，网络计划具有以下主要特点( )。",[561,563,565,567,569],{"key":20,"text":562,"correct":22},"网络计划能够明确表达各项工作之间的逻辑关系",{"key":24,"text":564,"correct":22},"通过网络计划时间参数的计算，可以找出关键线路和关键工作",{"key":28,"text":566,"correct":22},"通过网络计划时间参数的计算，可以明确各项工作的机动时间",{"key":31,"text":568,"correct":22},"网络计划可以利用电子计算机进行计算、优化和调整",{"key":61,"text":570,"correct":26},"比横道计划直观明了","ABCD",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":24,"analysis":33},931663,"为了使工程所需要的资源按时间的分布符合优化目标，网络计划的资源优化是通过改变( )来达到目的的。",[576,578,580,582],{"key":20,"text":577,"correct":26},"关键工作的开始时间",{"key":24,"text":579,"correct":22},"工作的开始时间",{"key":28,"text":581,"correct":26},"关键工作的持续时间",{"key":31,"text":583,"correct":26},"工作的持续时间",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":31,"analysis":33},931664,"对承包人超出设计图纸范围的工程量，监理工程师应( )。",[588,590,592,594],{"key":20,"text":589,"correct":26},"经发包人同意后计量",{"key":24,"text":591,"correct":26},"与承包人协商后计量",{"key":28,"text":593,"correct":26},"在竣工结算时计量",{"key":31,"text":595,"correct":22},"不予计量",{"id":597,"libraryId":5,"type":48,"typeLabel":49,"stem":598,"options":599,"answer":610,"analysis":33},931665,"关于双代号网络图绘制基本规则，下列叙述正确的是( )。",[600,602,604,606,608],{"key":20,"text":601,"correct":22},"网络图中不得存在循环回路；",{"key":24,"text":603,"correct":26},"允许在网络图中出现无箭头的连线或双向箭线；",{"key":28,"text":605,"correct":22},"一个网络图应只有一个起点节点和一个终点节点；",{"key":31,"text":607,"correct":22},"一条箭线加两端的节点只能表示惟一的一项工作；",{"key":61,"text":609,"correct":22},"严禁在网络图中出现没有箭尾节点的箭线和没有箭头节点的箭线。","ACDE",{"id":612,"libraryId":5,"type":15,"typeLabel":16,"stem":613,"options":614,"answer":24,"analysis":33},931666,"按数据处理规则，强度检测宜取( )。",[615,617,619,621],{"key":20,"text":616,"correct":26},"最大值",{"key":24,"text":618,"correct":22},"最小值",{"key":28,"text":620,"correct":26},"平均值",{"key":31,"text":622,"correct":26},"按既定规则计算",{"id":624,"libraryId":5,"type":48,"typeLabel":49,"stem":625,"options":626,"answer":637,"analysis":33},931667,"下列指标中，可用于进行单一投资方案可行与否判定标准的是( )。",[627,629,631,633,635],{"key":20,"text":628,"correct":22},"内部收益率",{"key":24,"text":630,"correct":26},"生产负荷率",{"key":28,"text":632,"correct":26},"差额的净现值",{"key":31,"text":634,"correct":26},"差额的净年值",{"key":61,"text":636,"correct":22},"净现值","AE",{"id":639,"libraryId":5,"type":48,"typeLabel":49,"stem":640,"options":641,"answer":571,"analysis":33},931668,"项目可行性研究的主要内容包括( )。",[642,644,646,648,650],{"key":20,"text":643,"correct":22},"市场预测",{"key":24,"text":645,"correct":22},"资源条件评价",{"key":28,"text":647,"correct":22},"投资估算",{"key":31,"text":649,"correct":22},"财务评价",{"key":61,"text":651,"correct":26},"投资机会研究",{"id":653,"libraryId":5,"type":15,"typeLabel":16,"stem":654,"options":655,"answer":28,"analysis":33},931669,"在工程网络计划中，工作M的最早开始时间为17天，其持续时间为5天，该工作有3项紧后工作，它们的最早开始时间分别为第25天，第27天和第30天，最迟开始时间分别为第28天，第29天和第30天，则工作M的总时差为( )天。",[656,658,660,662],{"key":20,"text":657,"correct":26},"6和6",{"key":24,"text":659,"correct":26},"3和3",{"key":28,"text":661,"correct":22},"6和3",{"key":31,"text":663,"correct":26},"11和8",[665,668,671,674,677,680],{"id":15,"name":666,"category":7,"favorite":667},"领导干部任职前廉政法规知识测试题",92,{"id":669,"name":670,"category":7,"favorite":15},595,"建筑结构与设备",{"id":672,"name":673,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":675,"name":676,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":678,"name":679,"category":7,"favorite":8},534,"BIM工程师",{"id":681,"name":679,"category":7,"favorite":8},535]