[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-603-12":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":671},{"id":5,"name":6,"category":7,"favorite":8},603,"质量、投资、进度控制","建筑工程",0,12,50,656,[13,34,52,64,79,91,106,118,132,144,159,174,186,198,213,225,240,252,267,279,292,305,320,332,343,357,369,383,395,407,422,434,448,463,476,487,499,511,523,538,550,558,570,584,598,611,623,634,645,657],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},931570,1,"单选题","下列关于FIDIC施工合同约定的工程计量程序的描述中错误的是( )。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","承包商应及时亲自或另派合格代表，协助工程师进行测量",false,{"key":24,"text":25,"correct":22},"B","承包商应提供工程师要求的任何具体材料",{"key":27,"text":28,"correct":29},"C","承包商必须在工程师的测量记录上签字予以确认",true,{"key":31,"text":32,"correct":22},"D","承包商如果未能到测量现场，则工程师的测量视为被认可","",{"id":35,"libraryId":5,"type":36,"typeLabel":37,"stem":38,"options":39,"answer":51,"analysis":33},931571,2,"多选题","造成过分偏倚及造成不稳定性，可能的共同原因包括( )",[40,42,44,46,48],{"key":20,"text":41,"correct":22},"测量错误的特性",{"key":24,"text":43,"correct":29},"(量具或零件)变形",{"key":27,"text":45,"correct":29},"违背假定，在应用常量上出错",{"key":31,"text":47,"correct":29},"仪器、设备或夹紧装置的磨损",{"key":49,"text":50,"correct":29},"E","校准不当或调整基准的使用不当","BCDE",{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":27,"analysis":33},931572,"ISO 9000：2000的核心标准中，审核指南标准是( )。",[56,58,60,62],{"key":20,"text":57,"correct":22},"ISO 9001",{"key":24,"text":59,"correct":22},"ISO 9004",{"key":27,"text":61,"correct":29},"ISO 19011",{"key":31,"text":63,"correct":22},"ISO 19001",{"id":65,"libraryId":5,"type":36,"typeLabel":37,"stem":66,"options":67,"answer":78,"analysis":33},931573,"建设工程的静态投资部分包括( )。",[68,70,72,74,76],{"key":20,"text":69,"correct":29},"基本预备费",{"key":24,"text":71,"correct":22},"涨价预备费",{"key":27,"text":73,"correct":29},"建筑安装工程费",{"key":31,"text":75,"correct":22},"铺底流动资金",{"key":49,"text":77,"correct":29},"工程建设其他费","ACE",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":24,"analysis":33},931574,"当监理工程师接受建设单位的委托对建设工程实施全过程监理时，为了有效地控制建设工程进度，监理工程师最早应在( )阶段协助建设前段时间确定工期总目标。",[83,85,87,89],{"key":20,"text":84,"correct":22},"前期决策",{"key":24,"text":86,"correct":29},"设计前准备",{"key":27,"text":88,"correct":22},"建设准备",{"key":31,"text":90,"correct":22},"施工准备",{"id":92,"libraryId":5,"type":36,"typeLabel":37,"stem":93,"options":94,"answer":105,"analysis":33},931575,"能够便于统计完成计划各个时间分布中所需资源的网络计划有( )。",[95,97,99,101,103],{"key":20,"text":96,"correct":29},"横道图",{"key":24,"text":98,"correct":22},"双代号网络图",{"key":27,"text":100,"correct":22},"单代号网络图",{"key":31,"text":102,"correct":22},"单代号搭接网络图",{"key":49,"text":104,"correct":29},"双代号时标网路图","AE",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},931576,"实施监理的某工程项目，在施工过程中发生质量问题，监理工程师发出《监理工程师通知单》以后，下一步要做的工作是( )。",[110,112,114,116],{"key":20,"text":111,"correct":22},"进行原因分析",{"key":24,"text":113,"correct":22},"要求有关单位提交质量问题调查报告",{"key":27,"text":115,"correct":22},"及时向建设单位和监理公司汇报",{"key":31,"text":117,"correct":29},"组织调查取证",{"id":119,"libraryId":5,"type":36,"typeLabel":37,"stem":33,"options":120,"answer":131,"analysis":33},931577,[121,123,125,127,129],{"key":20,"text":122,"correct":22},"第4天至第5天的实际进度为匀速进展",{"key":24,"text":124,"correct":29},"第3天至第6天的计划进度为匀速进展",{"key":27,"text":126,"correct":22},"实施过程中实际停工累计0.5天",{"key":31,"text":128,"correct":22},"第4天实际工作量与计划工作量相同",{"key":49,"text":130,"correct":29},"第8天结束时该工作已按计划完成","BE",{"id":133,"libraryId":5,"type":15,"typeLabel":16,"stem":134,"options":135,"answer":27,"analysis":33},931578,"在双代号网络计划中，当计划工期等于计算工期时，关键线路上的工作一定是( )。",[136,138,140,142],{"key":20,"text":137,"correct":22},"总时差大于自由时差",{"key":24,"text":139,"correct":22},"最早开始时间小于等于最迟开始时间",{"key":27,"text":141,"correct":29},"最早完成时间等于最迟完成时间",{"key":31,"text":143,"correct":22},"相邻工作之间时间间隔大于零",{"id":145,"libraryId":5,"type":36,"typeLabel":37,"stem":146,"options":147,"answer":158,"analysis":33},931579,"下列关于劣质成本(COPQ)的说法，正确的是( )。",[148,150,152,154,156],{"key":20,"text":149,"correct":29},"是指产品实现过程及其支持过程中不增值的那一部分运行资源成本",{"key":24,"text":151,"correct":22},"包括非符合性成本和符合性成本",{"key":27,"text":153,"correct":29},"符合性成本指现行过程没有发生故障所支付的经营资源成本",{"key":31,"text":155,"correct":29},"非符合性成本指现行过程发生故障所造成的损失和由此所支付的费用",{"key":49,"text":157,"correct":29},"劣质成本分析致力于项目是否能够减少或消除劣质成本","ACDE",{"id":160,"libraryId":5,"type":36,"typeLabel":37,"stem":161,"options":162,"answer":173,"analysis":33},931580,"在单位工程或子单位工程质量验收时，应对其是否符合设计和规范要求及总体质量水平做出评价，其综合验收结论由参加验收的( )共同商定。",[163,165,167,169,171],{"key":20,"text":164,"correct":29},"建设单位",{"key":24,"text":166,"correct":29},"设计单位",{"key":27,"text":168,"correct":29},"监理单位",{"key":31,"text":170,"correct":22},"工程质量监督机构",{"key":49,"text":172,"correct":29},"施工单位","ABCE",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":27,"analysis":33},931581,"建设工程从表面上检查，就很难发现内在的质量问题，这体现了工程质量的( )。",[178,180,182,184],{"key":20,"text":179,"correct":22},"波动大",{"key":24,"text":181,"correct":22},"评价方法的特殊性",{"key":27,"text":183,"correct":29},"隐蔽性",{"key":31,"text":185,"correct":22},"终检局限性",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":31,"analysis":33},931582,"某产品共有五个零件，功能分别为F1、F2、F3、F4、F5，用强制确定法确定零件功能评价系数时，其功能得分分别为3、5、4、1、2，则F2的功能评价系数为( )。",[190,192,194,196],{"key":20,"text":191,"correct":22},"0.13",{"key":24,"text":193,"correct":22},"0.20",{"key":27,"text":195,"correct":22},"0.27",{"key":31,"text":197,"correct":29},"0.33",{"id":199,"libraryId":5,"type":36,"typeLabel":37,"stem":200,"options":201,"answer":212,"analysis":33},931583,"成品检验是一种出厂前的常规检验和抽样检验，其检验项目受到( )的限制。",[202,204,206,208,210],{"key":20,"text":203,"correct":22},"检验复杂程度",{"key":24,"text":205,"correct":29},"检验成本",{"key":27,"text":207,"correct":22},"检验周期",{"key":31,"text":209,"correct":29},"检验效率",{"key":49,"text":211,"correct":22},"检验项目关(关键)","BD",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":24,"analysis":33},931584,"PFMEA表格内各项说明，错误的是( )。",[217,219,221,223],{"key":20,"text":218,"correct":22},"过程功能和要求：用简明的文字说明工艺过程或工序的目的",{"key":24,"text":220,"correct":29},"潜在失效模式：根据失效严重程度制定一套设计改进和开发试验优先控制系统",{"key":27,"text":222,"correct":22},"潜在失效后果：失效模式对顾客的影响",{"key":31,"text":224,"correct":22},"严重度：是失效模式严重程度的评价指标",{"id":226,"libraryId":5,"type":36,"typeLabel":37,"stem":227,"options":228,"answer":239,"analysis":33},931585,"下列属于投资方案动态评价指标的是( )。",[229,231,233,235,237],{"key":20,"text":230,"correct":29},"净现值率",{"key":24,"text":232,"correct":29},"净年值",{"key":27,"text":234,"correct":22},"静态投资回收期",{"key":31,"text":236,"correct":29},"财务净现值",{"key":49,"text":238,"correct":29},"内部收益率","ABDE",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":31,"analysis":33},931586,"检验是产品形成过程中重要的质量保证措施，下列检验中最重要的是( )。",[244,246,248,250],{"key":20,"text":245,"correct":22},"进货检验",{"key":24,"text":247,"correct":22},"首件检验",{"key":27,"text":249,"correct":22},"巡回检验",{"key":31,"text":251,"correct":29},"最终检验",{"id":253,"libraryId":5,"type":36,"typeLabel":37,"stem":254,"options":255,"answer":266,"analysis":33},931587,"若某常规项目的净现值小于零，则意味着( )。",[256,258,260,262,264],{"key":20,"text":257,"correct":22},"该项目亏损，不可行",{"key":24,"text":259,"correct":22},"该内部收益率小于项目未达到期望的收益水平，但可行",{"key":27,"text":261,"correct":22},"该项目利润率小于基准收益率",{"key":31,"text":263,"correct":29},"该项目未达到期望的收益水平，不可行",{"key":49,"text":265,"correct":29},"该项目内部收益率小于基准收益率","DE",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":31,"analysis":33},931588,"严重度(S)是设计失效模式及影响分析(DFME A)失效模式严重程度的评价指标。当设计严重度(S)取值在10～9时，失效后果为( )。",[271,273,275,277],{"key":20,"text":272,"correct":22},"轻微或无",{"key":24,"text":274,"correct":22},"低",{"key":27,"text":276,"correct":22},"高",{"key":31,"text":278,"correct":29},"严重危害",{"id":280,"libraryId":5,"type":36,"typeLabel":37,"stem":281,"options":282,"answer":291,"analysis":33},931589,"下列项目经济评价指标中，属于价值指标的有( )。",[283,284,286,287,289],{"key":20,"text":238,"correct":22},{"key":24,"text":285,"correct":22},"投资回收期",{"key":27,"text":232,"correct":29},{"key":31,"text":288,"correct":29},"净现值",{"key":49,"text":290,"correct":22},"资产负债率","CD",{"id":293,"libraryId":5,"type":36,"typeLabel":37,"stem":33,"options":294,"answer":78,"analysis":33},931590,[295,297,299,301,303],{"key":20,"text":296,"correct":29},"工作B",{"key":24,"text":298,"correct":22},"工作C",{"key":27,"text":300,"correct":29},"工作D",{"key":31,"text":302,"correct":22},"工作E",{"key":49,"text":304,"correct":29},"工作G",{"id":306,"libraryId":5,"type":36,"typeLabel":37,"stem":307,"options":308,"answer":319,"analysis":33},931591,"排列图是一种常见的质量控制统计分析方法，它可用于( )。",[309,311,313,315,317],{"key":20,"text":310,"correct":29},"分析造成质量问题的薄弱环节",{"key":24,"text":312,"correct":22},"评价生产过程的能力",{"key":27,"text":314,"correct":22},"掌握质量数据的分布规律",{"key":31,"text":316,"correct":29},"分析质量控制措施的有效性",{"key":49,"text":318,"correct":29},"找出生产不合格品最多的关键过程","ADE",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":20,"analysis":33},931592,"在设计准备阶段监理的工作内容中不包括( )。",[324,326,328,330],{"key":20,"text":325,"correct":29},"发出修改设计描绘",{"key":24,"text":327,"correct":22},"协助建设单位签订设计合同",{"key":27,"text":329,"correct":22},"确定设计质量要求和标准",{"key":31,"text":331,"correct":22},"组建项目监理机构",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":334,"answer":20,"analysis":33},931593,[335,337,339,341],{"key":20,"text":336,"correct":29},"工作A完成8天后，工作B才能开始",{"key":24,"text":338,"correct":22},"工作B完成8天后，工作A才能开始",{"key":27,"text":340,"correct":22},"工作A完成8天之内，工作B必须开始",{"key":31,"text":342,"correct":22},"工作B完成8天之内，工作A必须开始",{"id":344,"libraryId":5,"type":36,"typeLabel":37,"stem":345,"options":346,"answer":78,"analysis":33},931594,"下列关于双代号时标网络组成的叙述，正确的有( )。",[347,349,351,353,355],{"key":20,"text":348,"correct":29},"实箭线表示实工作",{"key":24,"text":350,"correct":22},"水平虚箭线表示虚工作消耗的时间",{"key":27,"text":352,"correct":29},"虚工作的水平段应绘制波形线",{"key":31,"text":354,"correct":22},"箭线宜用水平箭线或斜箭线",{"key":49,"text":356,"correct":29},"箭线直线段的水平投影长度表示工作的持续时间",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":24,"analysis":33},931595,"下列关于价值工程工作小组说法错误的是( )。",[361,363,365,367],{"key":20,"text":362,"correct":22},"负责人应由能对项目负责的人员担任",{"key":24,"text":364,"correct":29},"成员应当仅包括专业设计人员",{"key":27,"text":366,"correct":22},"成员应该思想活跃，具有创造精神",{"key":31,"text":368,"correct":22},"成员一般在10人左右",{"id":370,"libraryId":5,"type":36,"typeLabel":37,"stem":371,"options":372,"answer":158,"analysis":33},931596,"检验和试验记录表式的设计，宜在编制检验文件时进行，它应符合( )要求。",[373,375,377,379,381],{"key":20,"text":374,"correct":29},"栏目选择适当",{"key":24,"text":376,"correct":22},"信息说话",{"key":27,"text":378,"correct":29},"标准化、规范化",{"key":31,"text":380,"correct":29},"具有唯一性标志",{"key":49,"text":382,"correct":29},"设有授权人放行签署栏目",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":24,"analysis":33},931597,"应用S形曲线比较法时，通过比较实际进度S形曲线和计划进度S形曲线，可以( )。",[387,389,391,393],{"key":20,"text":388,"correct":22},"表明实际进度是否匀速开展",{"key":24,"text":390,"correct":29},"得到工程项目实际超额或拖欠的任务量",{"key":27,"text":392,"correct":22},"预测偏差对后续工作及工期的影响",{"key":31,"text":394,"correct":22},"表明对工作总时差的利用情况",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":27,"analysis":33},931598,"职业健康安全和环境管理体系试运行阶段要注意的主要问题是( )。",[399,401,403,405],{"key":20,"text":400,"correct":22},"保持管理体系",{"key":24,"text":402,"correct":22},"初始状态评审",{"key":27,"text":404,"correct":29},"体系文件发到位和有针对性宣传贯彻",{"key":31,"text":406,"correct":22},"确定组织机构和职责",{"id":408,"libraryId":5,"type":36,"typeLabel":37,"stem":409,"options":410,"answer":421,"analysis":33},931599,"设备制造单位按规定编写和提交验收交接文件是申请验收的必要条件，其交接验收文件包括( )。",[411,413,415,417,419],{"key":20,"text":412,"correct":29},"各项设备制造记录",{"key":24,"text":414,"correct":22},"全部质量监理文件",{"key":27,"text":416,"correct":29},"全部设计文件",{"key":31,"text":418,"correct":29},"主要机械及设备的技术证书",{"key":49,"text":420,"correct":22},"设备采购合同","ACD",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":24,"analysis":33},931600,"某购房人从银行贷款50万元，贷款期限10年，按月等额还本付息，贷款年利率6％，每月计息一次，其每月应向银行还款的数额为( )元。",[426,428,430,432],{"key":20,"text":427,"correct":22},"4917",{"key":24,"text":429,"correct":29},"5551",{"key":27,"text":431,"correct":22},"7462",{"key":31,"text":433,"correct":22},"7581",{"id":435,"libraryId":5,"type":36,"typeLabel":37,"stem":436,"options":437,"answer":212,"analysis":33},931601,"事件树编制的程序包括( )。",[438,440,442,444,446],{"key":20,"text":439,"correct":22},"情况分析",{"key":24,"text":441,"correct":29},"确定初始事件",{"key":27,"text":443,"correct":22},"确定顶事件",{"key":31,"text":445,"correct":29},"判定安全功能",{"key":49,"text":447,"correct":22},"简化系统图",{"id":449,"libraryId":5,"type":36,"typeLabel":37,"stem":450,"options":451,"answer":462,"analysis":33},931602,"在检验和试验方法中，应明确规定如何实施检测，包括( )。",[452,454,456,458,460],{"key":20,"text":453,"correct":22},"抽样方案",{"key":24,"text":455,"correct":29},"检验部位",{"key":27,"text":457,"correct":22},"检验项目",{"key":31,"text":459,"correct":29},"测量点数",{"key":49,"text":461,"correct":29},"检测方向","BDE",{"id":464,"libraryId":5,"type":36,"typeLabel":37,"stem":33,"options":465,"answer":462,"analysis":33},931603,[466,468,470,472,474],{"key":20,"text":467,"correct":22},"节点编号不对",{"key":24,"text":469,"correct":29},"有无箭头的连接",{"key":27,"text":471,"correct":22},"有循环回路",{"key":31,"text":473,"correct":29},"多个起点节点",{"key":49,"text":475,"correct":29},"有多余虚工作",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":20,"analysis":33},931604,"设备采购方案最终需获得( )的批准。",[480,481,483,485],{"key":20,"text":164,"correct":29},{"key":24,"text":482,"correct":22},"总监理工程师",{"key":27,"text":484,"correct":22},"项目经理",{"key":31,"text":486,"correct":22},"质检站",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":24,"analysis":33},931605,"在雇用多个承包商的情况下，设备监理工程师负责( )设备工程的详细进度计划。",[491,493,495,497],{"key":20,"text":492,"correct":22},"编制；",{"key":24,"text":494,"correct":29},"审核；",{"key":27,"text":496,"correct":22},"编制或审核；",{"key":31,"text":498,"correct":22},"修改。",{"id":500,"libraryId":5,"type":36,"typeLabel":37,"stem":33,"options":501,"answer":319,"analysis":33},931606,[502,504,506,507,509],{"key":20,"text":503,"correct":29},"节点编号有误",{"key":24,"text":505,"correct":22},"工作代号重复",{"key":27,"text":473,"correct":22},{"key":31,"text":508,"correct":29},"多个终点节点",{"key":49,"text":510,"correct":29},"存在循环回路",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":20,"analysis":33},931607,"计量型测量系统中进行重复性和再现性分析时，( )可接受。",[515,517,519,521],{"key":20,"text":516,"correct":29},"R&R＜10%",{"key":24,"text":518,"correct":22},"R&R≤10%",{"key":27,"text":520,"correct":22},"10%≤R&R≤30%",{"key":31,"text":522,"correct":22},"10%＜R&R≤30%",{"id":524,"libraryId":5,"type":36,"typeLabel":37,"stem":525,"options":526,"answer":537,"analysis":33},931608,"正交表的选择是正交试验设计的首要问题。一般情况下，( )。",[527,529,531,533,535],{"key":20,"text":528,"correct":22},"试验因素的水平数应小于正交表中的水平数",{"key":24,"text":530,"correct":22},"因素个数(包括交互作用)应大于正交表的列数",{"key":27,"text":532,"correct":29},"试验因素的水平数应等于正交表中的水平数",{"key":31,"text":534,"correct":29},"因素个数(包括交互作用)应不大于正交表的列数",{"key":49,"text":536,"correct":29},"各因素及交互作用的自由度之和要小于所选正交表的总自由度","CDE",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":24,"analysis":33},931609,"( )是指长期获取读数的变异性，它以总变差为基础。",[542,544,546,548],{"key":20,"text":543,"correct":22},"能力",{"key":24,"text":545,"correct":29},"性能",{"key":27,"text":547,"correct":22},"灵敏度",{"key":31,"text":549,"correct":22},"不确定度",{"id":551,"libraryId":5,"type":36,"typeLabel":37,"stem":33,"options":552,"answer":78,"analysis":33},931610,[553,554,555,556,557],{"key":20,"text":296,"correct":29},{"key":24,"text":298,"correct":22},{"key":27,"text":300,"correct":29},{"key":31,"text":302,"correct":22},{"key":49,"text":304,"correct":29},{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":24,"analysis":33},931611,"下列选项中，不属于检验文件的是( )。",[562,564,566,568],{"key":20,"text":563,"correct":22},"程序",{"key":24,"text":565,"correct":29},"偏差分析",{"key":27,"text":567,"correct":22},"检验通则",{"key":31,"text":569,"correct":22},"检验和试验规程",{"id":571,"libraryId":5,"type":36,"typeLabel":37,"stem":572,"options":573,"answer":131,"analysis":33},931612,"下列关于工作间逻辑关系的说法，正确的有( )。",[574,576,578,580,582],{"key":20,"text":575,"correct":22},"工艺关系是由生产性工艺过程决定的，是绝对无法改变的",{"key":24,"text":577,"correct":29},"组织关系是根据组织原则和资源优化配置原则决定的",{"key":27,"text":579,"correct":22},"工艺关系是在研究施工方案的基础上作出的人为安排",{"key":31,"text":581,"correct":22},"组织关系是由工作间客观的科学规律决定的",{"key":49,"text":583,"correct":29},"工艺关系是由生产性工艺过程决定的，必要时可以改变",{"id":585,"libraryId":5,"type":36,"typeLabel":37,"stem":586,"options":587,"answer":319,"analysis":33},931613,"将设备监理的文件按作用可分为( )。",[588,590,592,594,596],{"key":20,"text":589,"correct":29},"监理记录",{"key":24,"text":591,"correct":22},"监理合同",{"key":27,"text":593,"correct":22},"监理依据",{"key":31,"text":595,"correct":29},"监理大纲",{"key":49,"text":597,"correct":29},"监理实施细则",{"id":599,"libraryId":5,"type":36,"typeLabel":37,"stem":33,"options":600,"answer":212,"analysis":33},931614,[601,603,605,607,609],{"key":20,"text":602,"correct":22},"工作C实际进度拖后，但不影响总工期",{"key":24,"text":604,"correct":29},"工作D仍有总时差2天",{"key":27,"text":606,"correct":22},"工作E仍有总时差1天",{"key":31,"text":608,"correct":29},"工作G的最早开始时间将会受影响",{"key":49,"text":610,"correct":22},"工作H的最早开始时间不会受影响",{"id":612,"libraryId":5,"type":15,"typeLabel":16,"stem":613,"options":614,"answer":31,"analysis":33},931615,"进口设备外贸手续费的计算公式为：外贸手续费：( )×人民币外汇牌价×外贸手续费率。",[615,617,619,621],{"key":20,"text":616,"correct":22},"离岸价",{"key":24,"text":618,"correct":22},"离岸价+国外运费",{"key":27,"text":620,"correct":22},"离岸价+国外运输保险费",{"key":31,"text":622,"correct":29},"到岸价",{"id":624,"libraryId":5,"type":15,"typeLabel":16,"stem":625,"options":626,"answer":31,"analysis":33},931616,"单位工程的观感质量应由验收人员进行现场检查，最后由( )确认。",[627,628,630,632],{"key":20,"text":482,"correct":22},{"key":24,"text":629,"correct":22},"建设单位代表",{"key":27,"text":631,"correct":22},"设计单位代表",{"key":31,"text":633,"correct":29},"各单位验收人员共同",{"id":635,"libraryId":5,"type":36,"typeLabel":37,"stem":33,"options":636,"answer":644,"analysis":33},931617,[637,638,639,640,642],{"key":20,"text":296,"correct":29},{"key":24,"text":298,"correct":29},{"key":27,"text":300,"correct":22},{"key":31,"text":641,"correct":22},"工作F",{"key":49,"text":643,"correct":29},"工作H","ABE",{"id":646,"libraryId":5,"type":15,"typeLabel":16,"stem":647,"options":648,"answer":27,"analysis":33},931618,"ISO9000：2000中“明示的，通常隐含的或必须履行的需求和期望”被称为( )。",[649,651,653,655],{"key":20,"text":650,"correct":22},"特性",{"key":24,"text":652,"correct":22},"服务",{"key":27,"text":654,"correct":29},"要求",{"key":31,"text":656,"correct":22},"过程",{"id":658,"libraryId":5,"type":36,"typeLabel":37,"stem":659,"options":660,"answer":421,"analysis":33},931619,"在生产过程中，根据正态分布曲线的理论来控制产品质量，需要符合( )。",[661,663,665,667,669],{"key":20,"text":662,"correct":29},"大批量生产的条件下，产品质量分布符合正态分布曲线",{"key":24,"text":664,"correct":22},"单件小批量的产品符合正态分布曲线",{"key":27,"text":666,"correct":29},"必须具备相对稳定的生产过程",{"key":31,"text":668,"correct":29},"要求检查质量数据准确",{"key":49,"text":670,"correct":22},"控制界限应该大于公差范围",[672,675,678,681,684,687],{"id":15,"name":673,"category":7,"favorite":674},"领导干部任职前廉政法规知识测试题",92,{"id":676,"name":677,"category":7,"favorite":15},595,"建筑结构与设备",{"id":679,"name":680,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":682,"name":683,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":685,"name":686,"category":7,"favorite":8},534,"BIM工程师",{"id":688,"name":686,"category":7,"favorite":8},535]