[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-603-11":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":687},{"id":5,"name":6,"category":7,"favorite":8},603,"质量、投资、进度控制","建筑工程",0,11,50,656,[13,34,46,57,75,90,102,117,129,143,158,170,182,197,211,223,235,250,262,277,292,304,319,331,346,361,373,385,400,412,425,437,451,463,476,488,503,518,530,542,556,567,582,594,608,620,634,646,660,675],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},931520,1,"单选题","工作和工作之间的逻辑关系都不确定，且工作持续时间也不确定，而按随机变量进行分析的网络计划技术是( )。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","关键线路法",false,{"key":24,"text":25,"correct":22},"B","计划评审技术",{"key":27,"text":28,"correct":29},"C","图示评审技术",true,{"key":31,"text":32,"correct":22},"D","风险评审技术","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},931521,"当实际施工进度发生拖延时，为加快施工进度而采取的组织措施可以是( )。",[38,40,42,44],{"key":20,"text":39,"correct":29},"重新划分施工段，增加工作面",{"key":24,"text":41,"correct":22},"采用先进施工方法，减少施工过程的数量",{"key":27,"text":43,"correct":22},"明确计划任务，实行包干奖励",{"key":31,"text":45,"correct":22},"改进施工工艺，缩短工艺技术间歇时间",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":48,"answer":24,"analysis":33},931522,[49,51,53,55],{"key":20,"text":50,"correct":22},"第2天和第8天",{"key":24,"text":52,"correct":29},"第3天和第8天",{"key":27,"text":54,"correct":22},"第2天和第9天",{"key":31,"text":56,"correct":22},"第3天和第9天",{"id":58,"libraryId":5,"type":59,"typeLabel":60,"stem":61,"options":62,"answer":74,"analysis":33},931523,2,"多选题","认证机构收到申请方的质量管理体系认证正式申请后，将对申请方的申请文件进行审查，有关认证申请的审查和批准的说法中，正确的是( )。",[63,65,67,69,71],{"key":20,"text":64,"correct":29},"审查质量手册的内容是否覆盖了质量管理体系要求标准的内容",{"key":24,"text":66,"correct":22},"经审查符合规定的申请要求，则批准注册并颁发注册证书",{"key":27,"text":68,"correct":22},"申请单位在提文申请书时，应同时预交认证费用",{"key":31,"text":70,"correct":29},"认证机构决定接受申请后，应向申请单位发出“接受申请通知书”",{"key":72,"text":73,"correct":29},"E","认证机构应审查申请内容包括填报的各项内容是否完整正确","ADE",{"id":76,"libraryId":5,"type":59,"typeLabel":60,"stem":77,"options":78,"answer":89,"analysis":33},931524,"在工作网络计划的执行过程中，当某项工作进度出现偏差后，需要调整原进度计划的情况有( )。",[79,81,83,85,87],{"key":20,"text":80,"correct":29},"项目总工期不允许拖延，但工作进度偏差已超过其总时差",{"key":24,"text":82,"correct":22},"项目总工期允许拖延，但工作进度偏差已超过其自由时差",{"key":27,"text":84,"correct":29},"项目总工期允许拖延时间有限，但实际拖延时间已超过此限制",{"key":31,"text":86,"correct":29},"后续工作不允许拖延，但工作进度偏差已超过其总时差",{"key":72,"text":88,"correct":22},"后续工作允许拖延，但工作进度偏差已超过其自由时差","ACD",{"id":91,"libraryId":5,"type":15,"typeLabel":16,"stem":92,"options":93,"answer":24,"analysis":33},931525,"工期固定一资源均衡优化是在网络计划工期不变的条件下，通过调整网络计划中( )，使资源消耗尽可能达到均衡。",[94,96,98,100],{"key":20,"text":95,"correct":22},"工作间的逻辑关系",{"key":24,"text":97,"correct":29},"非关键工作的开始时间",{"key":27,"text":99,"correct":22},"非关键工作的持续时间",{"key":31,"text":101,"correct":22},"资源的需求总量",{"id":103,"libraryId":5,"type":59,"typeLabel":60,"stem":104,"options":105,"answer":116,"analysis":33},931526,"根据检验次数分类可分为( )。",[106,108,110,112,114],{"key":20,"text":107,"correct":29},"单次抽样",{"key":24,"text":109,"correct":22},"计数抽样检验",{"key":27,"text":111,"correct":29},"二次抽样",{"key":31,"text":113,"correct":22},"计量抽样检验",{"key":72,"text":115,"correct":29},"多次抽样","ACE",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":31,"analysis":33},931527,"下列投资项目风险及不确定性分析中，以计算经济评价指标的期望值为基础的是( )。",[121,123,125,127],{"key":20,"text":122,"correct":22},"盈亏平衡分析",{"key":24,"text":124,"correct":22},"偏差分析",{"key":27,"text":126,"correct":22},"敏感性分析",{"key":31,"text":128,"correct":29},"概率分析",{"id":130,"libraryId":5,"type":59,"typeLabel":60,"stem":131,"options":132,"answer":89,"analysis":33},931528,"质量管理体系包括( )。",[133,135,137,139,141],{"key":20,"text":134,"correct":29},"质量管理体系审核",{"key":24,"text":136,"correct":22},"质量管理体系评审",{"key":27,"text":138,"correct":29},"质量管理体系评价",{"key":31,"text":140,"correct":29},"自我评定",{"key":72,"text":142,"correct":22},"质量管理方法使用",{"id":144,"libraryId":5,"type":59,"typeLabel":60,"stem":145,"options":146,"answer":157,"analysis":33},931529,"在下列实际进度与计划进度的比较方法中，既可以从局部又可以从整体角度反映设备工程实际进度进展情况的有( )。",[147,149,151,153,155],{"key":20,"text":148,"correct":22},"横道图比较法",{"key":24,"text":150,"correct":22},"S形曲线比较法",{"key":27,"text":152,"correct":22},"前锋线比较法",{"key":31,"text":154,"correct":29},"“香蕉”曲线比较法",{"key":72,"text":156,"correct":29},"横道图与“香蕉”曲线综合比较法","DE",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":24,"analysis":33},931530,"故障树的定性分析是寻找顶事件发生的原因和原因的组合，即找出全部( )。",[162,164,166,168],{"key":20,"text":163,"correct":22},"割集",{"key":24,"text":165,"correct":29},"最小割集",{"key":27,"text":167,"correct":22},"阶数",{"key":31,"text":169,"correct":22},"最小底事件",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":20,"analysis":33},931531,"利息备付率表示项目的利润偿付利息的保证倍数，对于正常运营的企业，利息备付率应大于( )。",[174,176,178,180],{"key":20,"text":175,"correct":29},"2.0",{"key":24,"text":177,"correct":22},"1.5",{"key":27,"text":179,"correct":22},"1.0",{"key":31,"text":181,"correct":22},"0.5",{"id":183,"libraryId":5,"type":59,"typeLabel":60,"stem":184,"options":185,"answer":196,"analysis":33},931532,"对不合格品的任何处置，均应保留处置记录，并与检验记录中的不合格品能相对应。对不合格品的处置可能是( )",[186,188,190,192,194],{"key":20,"text":187,"correct":29},"返工",{"key":24,"text":189,"correct":29},"返修",{"key":27,"text":191,"correct":29},"报废",{"key":31,"text":193,"correct":22},"直接使用",{"key":72,"text":195,"correct":29},"降级他用","ABCE",{"id":198,"libraryId":5,"type":59,"typeLabel":60,"stem":199,"options":200,"answer":116,"analysis":33},931533,"设备质量具有( )等特点。",[201,203,205,207,209],{"key":20,"text":202,"correct":29},"隐蔽性",{"key":24,"text":204,"correct":22},"偶然性",{"key":27,"text":206,"correct":29},"行业多",{"key":31,"text":208,"correct":22},"难度大",{"key":72,"text":210,"correct":29},"影响因素多",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":31,"analysis":33},931534,"按设备形成性质，质量可分为( )。",[215,217,219,221],{"key":20,"text":216,"correct":22},"设计质量、工程质量、管理质量",{"key":24,"text":218,"correct":22},"实体质最、部件质量、系统质量",{"key":27,"text":220,"correct":22},"实体质量、技术质量、工程质量",{"key":31,"text":222,"correct":29},"实体质量、功能和使用价值质量、过程质量",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":24,"analysis":33},931535,"施工企业既要获得利润，又要在投标报价上具有竞争力，在报价计算时，宜( )。题答要不内线封密",[227,229,231,233],{"key":20,"text":228,"correct":22},"以预算定额为基础报价",{"key":24,"text":230,"correct":29},"以企业自身技术和管理的优势确定投标报价",{"key":27,"text":232,"correct":22},"以单价法计算造价投标",{"key":31,"text":234,"correct":22},"以扩大单价为基础快速投标报价",{"id":236,"libraryId":5,"type":59,"typeLabel":60,"stem":237,"options":238,"answer":249,"analysis":33},931536,"当被选的互斥型方案的寿命期不等时，可采用的方法包括( )。",[239,241,243,245,247],{"key":20,"text":240,"correct":22},"净现值法",{"key":24,"text":242,"correct":29},"最小公倍数法",{"key":27,"text":244,"correct":22},"内部收益率法",{"key":31,"text":246,"correct":29},"年值法",{"key":72,"text":248,"correct":29},"研究期法","BDE",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":27,"analysis":33},931537,"过程失效模式及影响分析的英文缩写是( )。",[254,256,258,260],{"key":20,"text":255,"correct":22},"FMEA",{"key":24,"text":257,"correct":22},"SFMEA",{"key":27,"text":259,"correct":29},"PFMEA",{"key":31,"text":261,"correct":22},"DFMEA",{"id":263,"libraryId":5,"type":59,"typeLabel":60,"stem":264,"options":265,"answer":276,"analysis":33},931538,"价值工程的三个基本要素包括( )。",[266,268,270,272,274],{"key":20,"text":267,"correct":22},"价格",{"key":24,"text":269,"correct":29},"价值",{"key":27,"text":271,"correct":29},"功能",{"key":31,"text":273,"correct":29},"寿命周期成本",{"key":72,"text":275,"correct":22},"现金流量","BCD",{"id":278,"libraryId":5,"type":59,"typeLabel":60,"stem":279,"options":280,"answer":291,"analysis":33},931539,"质量管理是一个组织全部管理职能的一个组成部分，其职能是质量方针、质量目标和( )的制定和实施。",[281,283,285,287,289],{"key":20,"text":282,"correct":29},"质量策划",{"key":24,"text":284,"correct":29},"质量保证",{"key":27,"text":286,"correct":22},"质量计划",{"key":31,"text":288,"correct":29},"质量控制",{"key":72,"text":290,"correct":29},"质量改进","ABDE",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":31,"analysis":33},931540,"影响设备质量的主要因素有人员、环境以及( )。",[296,298,300,302],{"key":20,"text":297,"correct":22},"管理体系、工艺、系统",{"key":24,"text":299,"correct":22},"管理体系、工艺、方法",{"key":27,"text":301,"correct":22},"机器设备、材料、系统",{"key":31,"text":303,"correct":29},"机器设备、材料、方法",{"id":305,"libraryId":5,"type":59,"typeLabel":60,"stem":306,"options":307,"answer":318,"analysis":33},931541,"在工程网络计划中，当计划工期等于计算工期时，关键工作的判定( )。",[308,310,312,314,316],{"key":20,"text":309,"correct":29},"该工作的总时差为零",{"key":24,"text":311,"correct":22},"该工作与其紧后工作之间的时间间隔为零",{"key":27,"text":313,"correct":29},"该工作的最早开始时间与最迟开始时间相等",{"key":31,"text":315,"correct":22},"该工作的自由时差最小",{"key":72,"text":317,"correct":22},"该工作的持续时间最长","AC",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":31,"analysis":33},931542,"没备质量监理目标是( )。",[323,325,327,329],{"key":20,"text":324,"correct":22},"确保设备制造工艺、操作规程、检测方法的规范性",{"key":24,"text":326,"correct":22},"提高项目参与者的质量意识、技术和文化水平",{"key":27,"text":328,"correct":22},"保证设备经济合理、技术先进、操作维护方便",{"key":31,"text":330,"correct":29},"提高项目投资、社会和环境效益，使设备质量达到预期水平",{"id":332,"libraryId":5,"type":59,"typeLabel":60,"stem":333,"options":334,"answer":345,"analysis":33},931543,"设备设计承包商应具备的主要条件有( )。",[335,337,339,341,343],{"key":20,"text":336,"correct":29},"同类项目设计经验和用户评价",{"key":24,"text":338,"correct":22},"杰出的产品推介能力",{"key":27,"text":340,"correct":29},"良好的社会信誉",{"key":31,"text":342,"correct":29},"相关级别的资质证书",{"key":72,"text":344,"correct":29},"专业符合设备的项目要求","ACDE",{"id":347,"libraryId":5,"type":59,"typeLabel":60,"stem":348,"options":349,"answer":360,"analysis":33},931544,"在费用偏差分析方法中，相对于横道图法而言，表格法的特点有( )。",[350,352,354,356,358],{"key":20,"text":351,"correct":22},"简单明了，容易掌握",{"key":24,"text":353,"correct":29},"信息量大",{"key":27,"text":355,"correct":29},"适用性强",{"key":31,"text":357,"correct":22},"信息量较少",{"key":72,"text":359,"correct":29},"更便于计算机辅助投资管理","BCE",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":27,"analysis":33},931545,"某设备安装工程9月份拟完工程计划支出8万元，已完工程计划支出5万元，已完工程实际支出10万元，则该设备安装工程9月份的费用绝对偏差和相对偏差分别为( )。",[365,367,369,371],{"key":20,"text":366,"correct":22},"2万元；40％",{"key":24,"text":368,"correct":22},"3万元：60％",{"key":27,"text":370,"correct":29},"5万元；100％",{"key":31,"text":372,"correct":22},"-3万元；-37.5％",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":31,"analysis":33},931546,"在生产流水线上，采用间隔一定时间或空间抽取试样的方法是( )。",[377,379,381,383],{"key":20,"text":378,"correct":22},"分层抽样法",{"key":24,"text":380,"correct":22},"随机数骰子法",{"key":27,"text":382,"correct":22},"二次抽样法",{"key":31,"text":384,"correct":29},"系统抽样法",{"id":386,"libraryId":5,"type":59,"typeLabel":60,"stem":387,"options":388,"answer":399,"analysis":33},931547,"建筑工程施工质量验收层次中的分项工程包括( )。",[389,391,393,395,397],{"key":20,"text":390,"correct":29},"钢筋工程",{"key":24,"text":392,"correct":29},"混凝土工程",{"key":27,"text":394,"correct":29},"现浇结构工程",{"key":31,"text":396,"correct":22},"通风与空调工程",{"key":72,"text":398,"correct":22},"地基与基础工程","ABC",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":27,"analysis":33},931548,"工程双代号网络计划中，某项工作的最早完成时间是指其( )。",[404,406,408,410],{"key":20,"text":405,"correct":22},"最迟完成时间与工作自由时差之差；",{"key":24,"text":407,"correct":22},"最早开始时间与工作自由时差之和；",{"key":27,"text":409,"correct":29},"最迟完成时间与工作总时差之差；",{"key":31,"text":411,"correct":22},"最早开始时间与工作总时差之和。",{"id":413,"libraryId":5,"type":59,"typeLabel":60,"stem":33,"options":414,"answer":318,"analysis":33},931549,[415,417,419,421,423],{"key":20,"text":416,"correct":29},"到第3月末，实际进度正常",{"key":24,"text":418,"correct":22},"第4月内实际进展超前",{"key":27,"text":420,"correct":29},"第2月前半月本工作停工",{"key":31,"text":422,"correct":22},"第3月至第5月实际进度为非匀速",{"key":72,"text":424,"correct":22},"预计本工作能够按时完成",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":27,"analysis":33},931550,"在某工程网络计划中，工作M的最早开始时间和最迟开始时间分别为第15天和第18天，其持续时间为7天。工作M有2项紧后工作，它们的最早开始时间分别为第24天和第26天，则工作M的总时差和自由时差( )天。",[429,431,433,435],{"key":20,"text":430,"correct":22},"分别为4和3；",{"key":24,"text":432,"correct":22},"均为3；",{"key":27,"text":434,"correct":29},"分别为3和2；",{"key":31,"text":436,"correct":22},"均为2；",{"id":438,"libraryId":5,"type":59,"typeLabel":60,"stem":439,"options":440,"answer":291,"analysis":33},931551,"DFMEA中设计控制的控制方法有( )。",[441,443,445,447,449],{"key":20,"text":442,"correct":29},"设计评审",{"key":24,"text":444,"correct":29},"计算研究",{"key":27,"text":446,"correct":22},"特殊过程控制",{"key":31,"text":448,"correct":29},"可行性评审",{"key":72,"text":450,"correct":29},"样件试验",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":24,"analysis":33},931552,"在网络计划中，工作间的逻辑关系分为工艺关系和组织关系。下列关于工作间逻辑关系的说法，正确的是( )。",[455,457,459,461],{"key":20,"text":456,"correct":22},"工艺关系是绝对无法改变的一种客观逻辑关系",{"key":24,"text":458,"correct":29},"组织关系是根据资源优化配置原则决定的",{"key":27,"text":460,"correct":22},"工艺关系是在研究施工方案的基础上作出的人为安排",{"key":31,"text":462,"correct":22},"组织关系是由工作间客观的科学规律决定的",{"id":464,"libraryId":5,"type":59,"typeLabel":60,"stem":33,"options":465,"answer":116,"analysis":33},931553,[466,468,470,472,474],{"key":20,"text":467,"correct":29},"多个起点节点",{"key":24,"text":469,"correct":22},"多个终点节点",{"key":27,"text":471,"correct":29},"节点编号有误",{"key":31,"text":473,"correct":22},"存在循环回路",{"key":72,"text":475,"correct":29},"有多余虚工作",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":20,"analysis":33},931554,"工程质量监督管理的主体是( )。",[480,482,484,486],{"key":20,"text":481,"correct":29},"政府主管部门",{"key":24,"text":483,"correct":22},"施工单位",{"key":27,"text":485,"correct":22},"建设单位",{"key":31,"text":487,"correct":22},"监理单位",{"id":489,"libraryId":5,"type":59,"typeLabel":60,"stem":490,"options":491,"answer":502,"analysis":33},931555,"关于双代号网络图的组成，下列描述正确的有( )。",[492,494,496,498,500],{"key":20,"text":493,"correct":22},"节点表示工作间的逻辑关系，箭线表示工作及其进行的方向",{"key":24,"text":495,"correct":29},"节点表示工作的开始或结束，箭线表示工作及其进行的方向",{"key":27,"text":497,"correct":22},"节点表示工作，箭线表示工作间的逻辑关系",{"key":31,"text":499,"correct":22},"节点表示工作，箭线表示工作及其进行的方向",{"key":72,"text":501,"correct":29},"箭线表示工作及其进行的方向，箭尾节点代号小于箭头节点代号","BE",{"id":504,"libraryId":5,"type":59,"typeLabel":60,"stem":505,"options":506,"answer":517,"analysis":33},931556,"下列选项中，属于设备制造过程投资管理措施的有( )。",[507,509,511,513,515],{"key":20,"text":508,"correct":29},"编制资金使用计划",{"key":24,"text":510,"correct":29},"处理合同变更，确定变更价款",{"key":27,"text":512,"correct":22},"处理设备安装过程中的索赔，确定索赔价款",{"key":31,"text":514,"correct":29},"审核并签发付款证书，办理结算",{"key":72,"text":516,"correct":22},"处理设备运输损耗","ABD",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":20,"analysis":33},931557,"设备工程资金使用计划通常不采用( )的形式。",[522,524,526,528],{"key":20,"text":523,"correct":29},"排列图",{"key":24,"text":525,"correct":22},"甘特图",{"key":27,"text":527,"correct":22},"香蕉图",{"key":31,"text":529,"correct":22},"S曲线",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":31,"analysis":33},931558,"在设备工程进度调整的系统过程中，采取措施调整进度计划时，应当以( )为依据。",[534,536,538,540],{"key":20,"text":535,"correct":22},"本工作及后续工作的总时差",{"key":24,"text":537,"correct":22},"本工作及后续工作的自由时差",{"key":27,"text":539,"correct":22},"非关键工作所拥有的机动时间",{"key":31,"text":541,"correct":29},"总工期和后续工作的限制条件",{"id":543,"libraryId":5,"type":59,"typeLabel":60,"stem":544,"options":545,"answer":116,"analysis":33},931559,"以下质量变异的原因中，属于非偶然性因素的有( )。",[546,548,550,552,554],{"key":20,"text":547,"correct":29},"仪器仪表失灵",{"key":24,"text":549,"correct":22},"模具的微小变形",{"key":27,"text":551,"correct":29},"机具设备发生故障",{"key":31,"text":553,"correct":22},"机具设备的正常磨损",{"key":72,"text":555,"correct":29},"原材料的规格和品种有误",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":27,"analysis":33},931560,"在设备制造过程中，通常不宜直接用作设备检验依据的是( )。",[560,562,563,565],{"key":20,"text":561,"correct":22},"检验规范",{"key":24,"text":286,"correct":22},{"key":27,"text":564,"correct":29},"合同文件",{"key":31,"text":566,"correct":22},"检验工艺",{"id":568,"libraryId":5,"type":59,"typeLabel":60,"stem":569,"options":570,"answer":581,"analysis":33},931561,"ISO 9000族标准的主要特点包括( )。",[571,573,575,577,579],{"key":20,"text":572,"correct":29},"通用性增强",{"key":24,"text":574,"correct":29},"以八项质量管理原则为理论基础",{"key":27,"text":576,"correct":29},"标准数量减少，标准对组织编制强制性文件要求减少。",{"key":31,"text":578,"correct":29},"强调与其他管理体系的相容性",{"key":72,"text":580,"correct":22},"将ISO 9001和ISO 9002编制成协调一致的标准","ABCD",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":24,"analysis":33},931562,"ISO 9000族标准，主要根据质量体系和产品要求的不同性质把质量管理体系要求与产品要求加以区分。下列标准中，属于质量管理体系要求的是( )。",[586,588,590,592],{"key":20,"text":587,"correct":22},"ISO 9004",{"key":24,"text":589,"correct":29},"ISO 9001",{"key":27,"text":591,"correct":22},"OHSAS 18000",{"key":31,"text":593,"correct":22},"ISO 14000",{"id":595,"libraryId":5,"type":59,"typeLabel":60,"stem":596,"options":597,"answer":502,"analysis":33},931563,"在工期固定--资源均衡优化中，关于调整过程的描述，正确的有( )。",[598,600,602,604,606],{"key":20,"text":599,"correct":22},"压缩关键工作的持续时间",{"key":24,"text":601,"correct":29},"调整非关键工作的开始时间",{"key":27,"text":603,"correct":22},"改变关键工作的逻辑关系",{"key":31,"text":605,"correct":22},"减少工作的资源强度",{"key":72,"text":607,"correct":29},"关键工作的开始时间保持不变",{"id":609,"libraryId":5,"type":15,"typeLabel":16,"stem":610,"options":611,"answer":31,"analysis":33},931564,"( )直方图主要是由于操作者的心理因素和习惯引起的。",[612,614,616,618],{"key":20,"text":613,"correct":22},"标准型",{"key":24,"text":615,"correct":22},"孤岛型",{"key":27,"text":617,"correct":22},"双峰型",{"key":31,"text":619,"correct":29},"偏峰型",{"id":621,"libraryId":5,"type":59,"typeLabel":60,"stem":622,"options":623,"answer":116,"analysis":33},931565,"控制图是用于确定生产或工作过程是否处于稳定状态的工具，可应用于( )等方面。",[624,626,628,630,632],{"key":20,"text":625,"correct":29},"预测",{"key":24,"text":627,"correct":22},"核定",{"key":27,"text":629,"correct":29},"控制",{"key":31,"text":631,"correct":22},"分类",{"key":72,"text":633,"correct":29},"确认",{"id":635,"libraryId":5,"type":15,"typeLabel":16,"stem":636,"options":637,"answer":20,"analysis":33},931566,"下列财务评价指标中，反映项目偿债能力的指标是( )。",[638,640,642,644],{"key":20,"text":639,"correct":29},"利息备付率",{"key":24,"text":641,"correct":22},"财务净现值",{"key":27,"text":643,"correct":22},"投资回收期",{"key":31,"text":645,"correct":22},"总投资收益率",{"id":647,"libraryId":5,"type":59,"typeLabel":60,"stem":648,"options":649,"answer":249,"analysis":33},931567,"审查设备设计概算的编制依据时.主要审查其( )。",[650,652,654,656,658],{"key":20,"text":651,"correct":22},"可操作性",{"key":24,"text":653,"correct":29},"时效性",{"key":27,"text":655,"correct":22},"经济性",{"key":31,"text":657,"correct":29},"适用范围",{"key":72,"text":659,"correct":29},"合法性",{"id":661,"libraryId":5,"type":59,"typeLabel":60,"stem":662,"options":663,"answer":674,"analysis":33},931568,"设备安装调试过程中，业主可以向承包商索赔的原因有( )。",[664,666,668,670,672],{"key":20,"text":665,"correct":22},"不可预见的条件",{"key":24,"text":667,"correct":22},"由于设计缺陷导致暂时停工",{"key":27,"text":669,"correct":29},"工期延误",{"key":31,"text":671,"correct":22},"不可抗力",{"key":72,"text":673,"correct":29},"施工缺陷","CE",{"id":676,"libraryId":5,"type":15,"typeLabel":16,"stem":677,"options":678,"answer":24,"analysis":33},931569,"在设备工程设计进度管理中，编制技术任务书、确定设备的基本参数及主要技术性能指标等技术文件的完成日期是设备工程( )进度管理目标。",[679,681,683,685],{"key":20,"text":680,"correct":22},"设计准备",{"key":24,"text":682,"correct":29},"初步设计",{"key":27,"text":684,"correct":22},"技术设计",{"key":31,"text":686,"correct":22},"工作图设计",[688,691,694,697,700,703],{"id":15,"name":689,"category":7,"favorite":690},"领导干部任职前廉政法规知识测试题",92,{"id":692,"name":693,"category":7,"favorite":15},595,"建筑结构与设备",{"id":695,"name":696,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":698,"name":699,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":701,"name":702,"category":7,"favorite":8},534,"BIM工程师",{"id":704,"name":702,"category":7,"favorite":8},535]