[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-603-10":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":669},{"id":5,"name":6,"category":7,"favorite":8},603,"质量、投资、进度控制","建筑工程",0,10,50,656,[13,33,45,62,77,89,101,116,128,143,155,170,185,197,209,220,235,250,262,276,288,303,315,327,339,354,368,380,394,406,421,436,446,458,470,484,496,511,523,534,548,560,572,581,595,609,616,630,640,655],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":17},931470,1,"单选题","",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","乙比甲好",false,{"key":24,"text":25,"correct":26},"B","甲比乙好",true,{"key":28,"text":29,"correct":22},"C","甲和乙一样好",{"key":31,"text":32,"correct":22},"D","甲和乙都不可行",{"id":34,"libraryId":5,"type":15,"typeLabel":16,"stem":35,"options":36,"answer":28,"analysis":17},931471,"某投资项目按其产品销售价格15万元\u002F台计算，其财务净现值为270万元。当产品的销售价格下调至12万元\u002F台时，财务净现值变为160万元，则财务净现值对销售价格变化的敏感度系数为( )。",[37,39,41,43],{"key":20,"text":38,"correct":22},"0.027",{"key":24,"text":40,"correct":22},"0.491",{"key":28,"text":42,"correct":26},"2.037",{"key":31,"text":44,"correct":22},"36.667",{"id":46,"libraryId":5,"type":47,"typeLabel":48,"stem":17,"options":49,"answer":61,"analysis":17},931472,2,"多选题",[50,52,54,56,58],{"key":20,"text":51,"correct":22},"在第5周末工作C进度尚有总时差1周",{"key":24,"text":53,"correct":26},"在第5周末工作E进度拖后且影响工期1周",{"key":28,"text":55,"correct":22},"在第9周末整体工程进度拖后1周",{"key":31,"text":57,"correct":22},"在第9周末工作F尚有时差2周",{"key":59,"text":60,"correct":26},"E","在第9周末工作H进度拖后，影响工作1周","BE",{"id":63,"libraryId":5,"type":47,"typeLabel":48,"stem":64,"options":65,"answer":76,"analysis":17},931473,"在八项质量管理原则巾，( )是质量管理的基本点(目标)。",[66,68,70,72,74],{"key":20,"text":67,"correct":22},"领导作用",{"key":24,"text":69,"correct":22},"全员参与",{"key":28,"text":71,"correct":22},"过程方法",{"key":31,"text":73,"correct":26},"持续改进",{"key":59,"text":75,"correct":26},"以顾客为关注焦点","DE",{"id":78,"libraryId":5,"type":15,"typeLabel":16,"stem":79,"options":80,"answer":20,"analysis":17},931474,"在没有总承包商的情况下，设备监理工程师需对设备工程总进度计划进行( )。",[81,83,85,87],{"key":20,"text":82,"correct":26},"编制",{"key":24,"text":84,"correct":22},"审核",{"key":28,"text":86,"correct":22},"编制或审核",{"key":31,"text":88,"correct":22},"修改",{"id":90,"libraryId":5,"type":15,"typeLabel":16,"stem":91,"options":92,"answer":28,"analysis":17},931475,"建设项目竣工决算包括( )全过程的全部实际支出费用。",[93,95,97,99],{"key":20,"text":94,"correct":22},"从开工到竣工",{"key":24,"text":96,"correct":22},"从破土动工到竣工",{"key":28,"text":98,"correct":26},"从筹建到竣工投产",{"key":31,"text":100,"correct":22},"从开工到投产",{"id":102,"libraryId":5,"type":47,"typeLabel":48,"stem":103,"options":104,"answer":115,"analysis":17},931476,"下列说法正确的有( )。",[105,107,109,111,113],{"key":20,"text":106,"correct":26},"工程变更须由原设计单位提供变更后的图纸和说明",{"key":24,"text":108,"correct":26},"承包人不得自行对原设计进行变更",{"key":28,"text":110,"correct":22},"工程师采用承包人合理的变更建议，其收益归承包人",{"key":31,"text":112,"correct":26},"发包人需要对工程设计变更，应不迟于变更前14天以书面形式通知承包人",{"key":59,"text":114,"correct":22},"工程变更须经工程师提供变更后的说明","ABD",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":31,"analysis":17},931477,"某方案年设计生产能力为6000件，每件产品价格为50元，单件产品变动成本为20元，单件产品销售税金及附加(含增值税)为10元。年固定总成本为64000元。用产量表示的盈亏平衡点为( )件。",[120,122,124,126],{"key":20,"text":121,"correct":22},"800",{"key":24,"text":123,"correct":22},"1600",{"key":28,"text":125,"correct":22},"2133",{"key":31,"text":127,"correct":26},"3200",{"id":129,"libraryId":5,"type":47,"typeLabel":48,"stem":130,"options":131,"answer":142,"analysis":17},931478,"某工作的最早开始时间是第3天，最晚开始时间是第13天，最早完成时间是第9天，最晚完成时间是第19天，则该任务( )。",[132,134,136,138,140],{"key":20,"text":133,"correct":22},"在关键路径上",{"key":24,"text":135,"correct":26},"不在关键路径上",{"key":28,"text":137,"correct":22},"进展情况良好",{"key":31,"text":139,"correct":26},"工期为6天",{"key":59,"text":141,"correct":22},"工期为10天","BD",{"id":144,"libraryId":5,"type":15,"typeLabel":16,"stem":145,"options":146,"answer":31,"analysis":17},931479,"某项目检查期间的挣值为100万元，计划价值为120万元，实际成本为90万元。下列关于偏差计算的说法，正确的是( )。",[147,149,151,153],{"key":20,"text":148,"correct":22},"进度偏差(SV)为-20万元，表示进度提前",{"key":24,"text":150,"correct":22},"进度偏差(SV)为-30万元，表示进度延误",{"key":28,"text":152,"correct":22},"成本偏差(CV)为-30万元，表示实际成本超过预算",{"key":31,"text":154,"correct":26},"成本偏差(CV)为10万元，表示实际成本低于预算",{"id":156,"libraryId":5,"type":47,"typeLabel":48,"stem":157,"options":158,"answer":169,"analysis":17},931480,"当利用S形曲线比较法时，通过比较计划S形曲线和实际S形曲线，可以获得的信息有( )。",[159,161,163,165,167],{"key":20,"text":160,"correct":26},"工程项目实际进度比计划进度超前或拖后的时间；",{"key":24,"text":162,"correct":22},"工程项目中各项工作实际完成的任务量；",{"key":28,"text":164,"correct":26},"工程项目实际进度比计划进度超额完成或拖欠的任务量；",{"key":31,"text":166,"correct":22},"工程项目中各项工作实际进度比计划进度超前或拖后的时间；",{"key":59,"text":168,"correct":26},"预测后期工程进度。","ACE",{"id":171,"libraryId":5,"type":47,"typeLabel":48,"stem":172,"options":173,"answer":184,"analysis":17},931481,"根据价值工程理论，下列各项功能中，属于按功能重要程度进行分类的有( )。",[174,176,178,180,182],{"key":20,"text":175,"correct":26},"基本功能",{"key":24,"text":177,"correct":22},"必要功能",{"key":28,"text":179,"correct":26},"辅助功能",{"key":31,"text":181,"correct":22},"使用功能",{"key":59,"text":183,"correct":22},"美学功能","AC",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":28,"analysis":17},931482,"设计单位提出的某专业工程变更应由( )签发工程变更单。",[189,191,193,195],{"key":20,"text":190,"correct":22},"业主",{"key":24,"text":192,"correct":22},"设计单位",{"key":28,"text":194,"correct":26},"总监理工程师",{"key":31,"text":196,"correct":22},"专业监理工程师",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":28,"analysis":17},931483,"加强风险管理，对影响工程建设进度目标的因素进行风险分析属于进度控制措施的( )。",[201,203,205,207],{"key":20,"text":202,"correct":22},"组织措施",{"key":24,"text":204,"correct":22},"技术措施",{"key":28,"text":206,"correct":26},"合同措施",{"key":31,"text":208,"correct":22},"经济措施",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":211,"answer":28,"analysis":17},931484,[212,214,216,218],{"key":20,"text":213,"correct":22},"存在循环回路",{"key":24,"text":215,"correct":22},"有多余的虚工作",{"key":28,"text":217,"correct":26},"有多个起始节点和终点节点",{"key":31,"text":219,"correct":22},"节点编号有错误",{"id":221,"libraryId":5,"type":47,"typeLabel":48,"stem":222,"options":223,"answer":234,"analysis":17},931485,"在对进场施工机械设备的性能及工作状态进行质量控制时，监理工程师的工作包括( )。",[224,226,228,230,232],{"key":20,"text":225,"correct":22},"考查施工机械设备的工作效率和可维修性",{"key":24,"text":227,"correct":26},"对于有特殊安全要求的机械设备应要求承包单位在使用前办理相关手续",{"key":28,"text":229,"correct":26},"核对承包单位报送的进场设备清单",{"key":31,"text":231,"correct":22},"考查施工机械的性能参数是否与施工对象的特点相适应",{"key":59,"text":233,"correct":26},"实际复验重要工程机械的工作状态","BCE",{"id":236,"libraryId":5,"type":47,"typeLabel":48,"stem":237,"options":238,"answer":249,"analysis":17},931486,"小型工程项目竣工财务决算报表内容包括( )。",[239,241,243,245,247],{"key":20,"text":240,"correct":26},"工程项目竣工财务决算审批表",{"key":24,"text":242,"correct":26},"竣工财务决算总表",{"key":28,"text":244,"correct":26},"交付使用资产明细表",{"key":31,"text":246,"correct":22},"项目概况表",{"key":59,"text":248,"correct":22},"交付使用资产总表","ABC",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":28,"analysis":17},931487,"由实施组织根据组织原则和资源优化配置原则决定工作间的先后顺序称为( )。",[254,256,258,260],{"key":20,"text":255,"correct":22},"逻辑关系",{"key":24,"text":257,"correct":22},"工艺关系",{"key":28,"text":259,"correct":26},"组织关系",{"key":31,"text":261,"correct":22},"工作关系",{"id":263,"libraryId":5,"type":47,"typeLabel":48,"stem":264,"options":265,"answer":234,"analysis":17},931488,"对于独立的常规投资项目，下列描述中正确的有( )。",[266,268,270,272,274],{"key":20,"text":267,"correct":22},"财务净现值随折现率的增大而增大",{"key":24,"text":269,"correct":26},"财务内部收益率是财务净现值等于零时的折现率",{"key":28,"text":271,"correct":26},"财务内部收益率与财务净现值的评价结论是一致的。",{"key":31,"text":273,"correct":22},"在某些情况下存在多个财务内部收益率",{"key":59,"text":275,"correct":26},"财务内部收益率考虑了项目在整个计算期的经济状况。",{"id":277,"libraryId":5,"type":15,"typeLabel":16,"stem":278,"options":279,"answer":28,"analysis":17},931489,"对于一个验项目很多的产品，通常根据判别式C=C1+C2a2+C3a3≤1判别( )。",[280,282,284,286],{"key":20,"text":281,"correct":22},"不合格",{"key":24,"text":283,"correct":22},"不合格项",{"key":28,"text":285,"correct":26},"不合格件",{"key":31,"text":287,"correct":22},"不合格批。",{"id":289,"libraryId":5,"type":47,"typeLabel":48,"stem":290,"options":291,"answer":302,"analysis":17},931490,"以下财务评价指标中不属于盈利能力分析指标的是( )。",[292,294,296,298,300],{"key":20,"text":293,"correct":26},"财务内部收益率",{"key":24,"text":295,"correct":22},"财务净现值",{"key":28,"text":297,"correct":26},"投资回收期",{"key":31,"text":299,"correct":26},"利息备付率",{"key":59,"text":301,"correct":22},"投资利润率","ACD",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":24,"analysis":17},931491,"依据ISO 9001以及ISO 14001质量管理体系和环境管理体系文件的实践及我国职业健康安全管理试点企业的经验，一般把职业健康安全和环境管理体系文件结构分成( )个层次。",[307,309,311,313],{"key":20,"text":308,"correct":22},"两",{"key":24,"text":310,"correct":26},"三",{"key":28,"text":312,"correct":22},"四",{"key":31,"text":314,"correct":22},"五",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":28,"analysis":17},931492,"某分部工程有甲、乙、丙三个施工过程，流水节拍分别为4.6.2，施工段数为6，且甲乙间工艺间歇为1，乙丙间提前插入时间为2，现组织等步距的成倍节拍流水施工，则计算工期为( )天。",[319,321,323,325],{"key":20,"text":320,"correct":22},"23",{"key":24,"text":322,"correct":22},"22",{"key":28,"text":324,"correct":26},"21",{"key":31,"text":326,"correct":22},"19",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":28,"analysis":17},931493,"在双代号时标网络计划中，当某项工作之后紧接实工作时，该工作箭线右边一段的波形线表示( )。",[331,333,335,337],{"key":20,"text":332,"correct":22},"工作间的逻辑关系",{"key":24,"text":334,"correct":22},"工作的总时差",{"key":28,"text":336,"correct":26},"工作的自由时差",{"key":31,"text":338,"correct":22},"工作的持续时间",{"id":340,"libraryId":5,"type":47,"typeLabel":48,"stem":341,"options":342,"answer":353,"analysis":17},931494,"让步(回用)“三限定”原则包括( )。",[343,345,347,349,351],{"key":20,"text":344,"correct":22},"限定周期",{"key":24,"text":346,"correct":26},"限定特性",{"key":28,"text":348,"correct":22},"限定极限均值",{"key":31,"text":350,"correct":26},"限定让步时间",{"key":59,"text":352,"correct":26},"限定让步产品的数量","BDE",{"id":355,"libraryId":5,"type":47,"typeLabel":48,"stem":356,"options":357,"answer":142,"analysis":17},931495,"监理工程师在业主的委托授权下，有可能编制的进度计划是( )。",[358,360,362,364,366],{"key":20,"text":359,"correct":22},"阶段性设计进度计划",{"key":24,"text":361,"correct":26},"施工总进度计划",{"key":28,"text":363,"correct":22},"单位工程施工进度计划",{"key":31,"text":365,"correct":26},"工程项目年度计划",{"key":59,"text":367,"correct":22},"设计工作分专业进度计划",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":20,"analysis":17},931496,"在建设工程施工阶段，监理工程师进度控制的工作内容包括( )。",[372,374,376,378],{"key":20,"text":373,"correct":26},"审查承包商调整后的施工进度计划",{"key":24,"text":375,"correct":22},"编制施工总进度计划和单位工程施工进度计划",{"key":28,"text":377,"correct":22},"协助承包商确定工程延期时间和实施进度计划",{"key":31,"text":379,"correct":22},"按时提供施工场地并适时下达开工令",{"id":381,"libraryId":5,"type":47,"typeLabel":48,"stem":382,"options":383,"answer":184,"analysis":17},931497,"下列关于名义利率和实际利率的说法，正确的有( )。",[384,386,388,390,392],{"key":20,"text":385,"correct":26},"在年名义利率相同的前提下，年计息次数越多，年实际利率越大",{"key":24,"text":387,"correct":22},"若一年计息两次，则年名义利率大于年实际利率",{"key":28,"text":389,"correct":26},"若一年计息一次，则年名义利率等于年实际利率",{"key":31,"text":391,"correct":22},"年实际利率与名义利率存在差异的原因是存在通货膨胀",{"key":59,"text":393,"correct":22},"年实际利率与名义利率存在差异的原因是存在投资风险",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":24,"analysis":17},931498,"在工程网络计划中，判别关键工作的条件是( )。",[398,400,402,404],{"key":20,"text":399,"correct":22},"自由时差最小",{"key":24,"text":401,"correct":26},"总时差最小",{"key":28,"text":403,"correct":22},"总时差为零",{"key":31,"text":405,"correct":22},"持续时间最长",{"id":407,"libraryId":5,"type":47,"typeLabel":48,"stem":408,"options":409,"answer":420,"analysis":17},931499,"6σ管理的基本原则为( )。",[410,412,414,416,418],{"key":20,"text":411,"correct":22},"较好的质量、合理的价格",{"key":24,"text":413,"correct":26},"真正以顾客为关注中心",{"key":28,"text":415,"correct":26},"基于数据和事实的管理",{"key":31,"text":417,"correct":26},"主动性的管理",{"key":59,"text":419,"correct":26},"追求完美，容忍失误","BCDE",{"id":422,"libraryId":5,"type":47,"typeLabel":48,"stem":423,"options":424,"answer":435,"analysis":17},931500,"关于故障树的以下说法，正确的是( )。",[425,427,429,431,433],{"key":20,"text":426,"correct":26},"每一个逻辑门都要有明确的结果事件",{"key":24,"text":428,"correct":26},"两个事件可以形成不经任何逻辑门的事件串。",{"key":28,"text":430,"correct":26},"同一共同事件可能在故障树的不同分支上出现，必须有相同的事件编号",{"key":31,"text":432,"correct":22},"同一共同事件不是底事件，必须用相似的转移符号进行简化",{"key":59,"text":434,"correct":26},"共同事件往往是对产品的故障有较大影响的事件","ABCE",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":438,"answer":28,"analysis":17},931501,[439,440,442,444],{"key":20,"text":184,"correct":22},{"key":24,"text":441,"correct":22},"CD",{"key":28,"text":443,"correct":26},"BC",{"key":31,"text":445,"correct":22},"CE",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":31,"analysis":17},931502,"在工程网络计划执行过程中，如果某项非关键工作实际进度拖延的时间超过其总时差，则( )。",[450,452,454,456],{"key":20,"text":451,"correct":22},"网络计划的计算工期不会改变",{"key":24,"text":453,"correct":22},"该工作的总时差不变",{"key":28,"text":455,"correct":22},"该工作的自由时差不变",{"key":31,"text":457,"correct":26},"网络计划中关键线路改变",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":28,"analysis":17},931503,"正交试验设计的首要问题是( )。",[462,464,466,468],{"key":20,"text":463,"correct":22},"明确试验目的",{"key":24,"text":465,"correct":22},"确定试验指标",{"key":28,"text":467,"correct":26},"选择合适的正交表",{"key":31,"text":469,"correct":22},"编制试验方案",{"id":471,"libraryId":5,"type":47,"typeLabel":48,"stem":472,"options":473,"answer":142,"analysis":17},931504,"在工程双代号网络计划中，某项工作的最早完成时间是指其( )。",[474,476,478,480,482],{"key":20,"text":475,"correct":22},"开始节点的最早时间与工作部时差之和",{"key":24,"text":477,"correct":26},"开始节点的最早时间与工作持续时间之和",{"key":28,"text":479,"correct":22},"完成节点的最迟时间与工作持续时间之差",{"key":31,"text":481,"correct":26},"完成节点最迟时间与工作总时差之差",{"key":59,"text":483,"correct":22},"完成节点的最迟时间与工作自由时差之差",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":24,"analysis":17},931505,"在利用S形曲线法进行进度比较时，当实际进展点落在计划S形曲线的右侧，则实际进展点与计划S形曲线的水平距离表示工程项目( )。",[488,490,492,494],{"key":20,"text":489,"correct":22},"实际进度超前的时间",{"key":24,"text":491,"correct":26},"实际进度拖后的时间",{"key":28,"text":493,"correct":22},"实际超额完成的任务量",{"key":31,"text":495,"correct":22},"实际拖欠的任务量",{"id":497,"libraryId":5,"type":47,"typeLabel":48,"stem":498,"options":499,"answer":510,"analysis":17},931506,"排列图的应用程序包括( )。",[500,502,504,506,508],{"key":20,"text":501,"correct":22},"明确、扼要地确定工程设备结果",{"key":24,"text":503,"correct":26},"选择要分析的对象",{"key":28,"text":505,"correct":26},"选择用于数据分析的时间范围",{"key":31,"text":507,"correct":26},"从左向右累加每一项目的度量值",{"key":59,"text":509,"correct":22},"寻找类别原因的下一层次原因","BCD",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":28,"analysis":17},931507,"横道图进度计划的优点是( )。",[515,517,519,521],{"key":20,"text":516,"correct":22},"便于确定关键工作",{"key":24,"text":518,"correct":22},"工作之间的逻辑关系表达清楚",{"key":28,"text":520,"correct":26},"表达方式直观",{"key":31,"text":522,"correct":22},"工作时差易于分析",{"id":524,"libraryId":5,"type":47,"typeLabel":48,"stem":525,"options":526,"answer":142,"analysis":17},931508,"下列财务分析指标中，属于盈利能力分析指标的有( )。",[527,528,529,531,532],{"key":20,"text":299,"correct":22},{"key":24,"text":293,"correct":26},{"key":28,"text":530,"correct":22},"资产负债率",{"key":31,"text":295,"correct":26},{"key":59,"text":533,"correct":22},"偿债备付率",{"id":535,"libraryId":5,"type":47,"typeLabel":48,"stem":536,"options":537,"answer":184,"analysis":17},931509,"网络计划“资源有限一工期最短”的优化方法是( )。",[538,540,542,544,546],{"key":20,"text":539,"correct":26},"占用相关工作的自由时差",{"key":24,"text":541,"correct":22},"占用所有工作的自由时差",{"key":28,"text":543,"correct":26},"后移使工期延长时间最短的工作",{"key":31,"text":545,"correct":22},"占用所有工作的总时差",{"key":59,"text":547,"correct":22},"后移使工期延长时间最长的工作",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":28,"analysis":17},931510,"在单代号网络计划中，某工作D有四项紧后工作 H、L、M和N，此四项紧后工作的总时差分别是2天、3天、6天和1天，工作D与 H、L、M和N工作的时间间隔分别是4天、2天、1天和3天，则工作D的总时差是( )天。",[552,554,556,558],{"key":20,"text":553,"correct":22},"2",{"key":24,"text":555,"correct":22},"3",{"key":28,"text":557,"correct":26},"4",{"key":31,"text":559,"correct":22},"5",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":24,"analysis":17},931511,"在设计工作中，由于监理工程师未能及时将业主对电梯选型的改变传达到设计单位而影响到设计进度的情况属于( )。",[564,566,568,570],{"key":20,"text":565,"correct":22},"建设意图和要求改变的影响",{"key":24,"text":567,"correct":26},"设计协调配合的影响",{"key":28,"text":569,"correct":22},"工程变更的影响",{"key":31,"text":571,"correct":22},"材料代用、设备选用失误的影响",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":574,"answer":24,"analysis":17},931512,[575,577,578,579],{"key":20,"text":576,"correct":22},"17",{"key":24,"text":324,"correct":26},{"key":28,"text":320,"correct":22},{"key":31,"text":580,"correct":22},"24",{"id":582,"libraryId":5,"type":47,"typeLabel":48,"stem":583,"options":584,"answer":249,"analysis":17},931513,"下列选项中，明确了质量管理体系与相关方面关系的有( )。",[585,587,589,591,593],{"key":20,"text":586,"correct":26},"质量管理体系要求和产品要求",{"key":24,"text":588,"correct":26},"质量管理体系与其他管理体系的关注点",{"key":28,"text":590,"correct":26},"质量管理体系与卓越模式之间的关系",{"key":31,"text":592,"correct":22},"统计技术的作用",{"key":59,"text":594,"correct":22},"质量管理体系评价",{"id":596,"libraryId":5,"type":47,"typeLabel":48,"stem":17,"options":597,"answer":608,"analysis":17},931514,[598,600,602,604,606],{"key":20,"text":599,"correct":26},"工作2-4的总时差为0",{"key":24,"text":601,"correct":22},"工作6-7为关键工作",{"key":28,"text":603,"correct":22},"工作3-6的自由时差为3",{"key":31,"text":605,"correct":26},"工作2-5的自由时差为2",{"key":59,"text":607,"correct":26},"工作1-3的自由时差为0","ADE",{"id":610,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":611,"answer":31,"analysis":17},931515,[612,613,614,615],{"key":20,"text":553,"correct":22},{"key":24,"text":555,"correct":22},{"key":28,"text":557,"correct":22},{"key":31,"text":559,"correct":26},{"id":617,"libraryId":5,"type":47,"typeLabel":48,"stem":618,"options":619,"answer":510,"analysis":17},931516,"设备工程质量成本的构成为( )。",[620,622,624,626,628],{"key":20,"text":621,"correct":22},"加工成本",{"key":24,"text":623,"correct":26},"预防成本",{"key":28,"text":625,"correct":26},"鉴定和监督成本",{"key":31,"text":627,"correct":26},"故障成本",{"key":59,"text":629,"correct":22},"材料成本",{"id":631,"libraryId":5,"type":15,"typeLabel":16,"stem":632,"options":633,"answer":20,"analysis":17},931517,"在单代号网络计划中，某工作与其仅有的四项紧后工作的时间间隔分别是6天、3天、1天和4天，则该工作的自由时差是( )天。",[634,636,637,638],{"key":20,"text":635,"correct":26},"1",{"key":24,"text":555,"correct":22},{"key":28,"text":557,"correct":22},{"key":31,"text":639,"correct":22},"6",{"id":641,"libraryId":5,"type":47,"typeLabel":48,"stem":642,"options":643,"answer":654,"analysis":17},931518,"进口设备的三类交货方式是( )。",[644,646,648,650,652],{"key":20,"text":645,"correct":22},"中转地交货类",{"key":24,"text":647,"correct":22},"目的港交货类",{"key":28,"text":649,"correct":26},"内陆交货类",{"key":31,"text":651,"correct":26},"目的地交货类",{"key":59,"text":653,"correct":26},"装运港交货类","CDE",{"id":656,"libraryId":5,"type":47,"typeLabel":48,"stem":657,"options":658,"answer":510,"analysis":17},931519,"( )是影响质量变异的系统性因素。",[659,661,663,665,667],{"key":20,"text":660,"correct":22},"机具设备发生故障",{"key":24,"text":662,"correct":26},"原材料性质的微小差异",{"key":28,"text":664,"correct":26},"机具设备的正常磨损",{"key":31,"text":666,"correct":26},"模具的微小变形",{"key":59,"text":668,"correct":22},"原材料的规格和品种有误",[670,673,676,679,682,685],{"id":15,"name":671,"category":7,"favorite":672},"领导干部任职前廉政法规知识测试题",92,{"id":674,"name":675,"category":7,"favorite":15},595,"建筑结构与设备",{"id":677,"name":678,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":680,"name":681,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":683,"name":684,"category":7,"favorite":8},534,"BIM工程师",{"id":686,"name":684,"category":7,"favorite":8},535]