[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-931664":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},931664,603,1,"单选题","对承包人超出设计图纸范围的工程量，监理工程师应( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","经发包人同意后计量",false,{"key":16,"text":17,"correct":14},"B","与承包人协商后计量",{"key":19,"text":20,"correct":14},"C","在竣工结算时计量",{"key":22,"text":23,"correct":24},"D","不予计量",true,"",{"id":6,"name":27,"category":28,"favorite":29},"质量、投资、进度控制","建筑工程",0]