[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-931644":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},931644,603,1,"单选题","总包单位依法将建设工程分包时，分包工程发生的质量问题，应( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","由总包单位负责",false,{"key":16,"text":17,"correct":18},"B","由总包单位与分包单位承担连带责任",true,{"key":20,"text":21,"correct":14},"C","由分包单位负责",{"key":23,"text":24,"correct":14},"D","由总包单位、分包单位、监理单位共同负责","",{"id":6,"name":27,"category":28,"favorite":29},"质量、投资、进度控制","建筑工程",0]