[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-931634":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":9},931634,603,2,"多选题","",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","工作C为斜向箭线",false,{"key":16,"text":17,"correct":18},"B","网络计划中存在循环回路",true,{"key":20,"text":21,"correct":18},"C","有的工作出现了双向箭头",{"key":23,"text":24,"correct":14},"D","有的工作无箭头",{"key":26,"text":27,"correct":18},"E","虚工作④～⑥可有可无","BCE",{"id":6,"name":30,"category":31,"favorite":32},"质量、投资、进度控制","建筑工程",0]