[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-931595":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},931595,603,1,"单选题","下列关于价值工程工作小组说法错误的是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","负责人应由能对项目负责的人员担任",false,{"key":16,"text":17,"correct":18},"B","成员应当仅包括专业设计人员",true,{"key":20,"text":21,"correct":14},"C","成员应该思想活跃，具有创造精神",{"key":23,"text":24,"correct":14},"D","成员一般在10人左右","价值工程工作小组的构成应考虑如下因素：①工作小组的负责人应由能对项目负责的人员担任。②工作小组的成员应当是各有关方面熟悉所研究对象的专业人员。③工作小组的成员应该思想活跃，具有创造精神。④工作小组的成员应该熟悉价值工程。⑤工作小组的成员一般在10人左右。",{"id":6,"name":27,"category":28,"favorite":29},"质量、投资、进度控制","建筑工程",0]