[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-931506":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},931506,603,2,"多选题","排列图的应用程序包括( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","明确、扼要地确定工程设备结果",false,{"key":16,"text":17,"correct":18},"B","选择要分析的对象",true,{"key":20,"text":21,"correct":18},"C","选择用于数据分析的时间范围",{"key":23,"text":24,"correct":18},"D","从左向右累加每一项目的度量值",{"key":26,"text":27,"correct":14},"E","寻找类别原因的下一层次原因","BCD","",{"id":6,"name":31,"category":32,"favorite":33},"质量、投资、进度控制","建筑工程",0]