[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-931503":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},931503,603,1,"单选题","正交试验设计的首要问题是( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","明确试验目的",false,{"key":16,"text":17,"correct":14},"B","确定试验指标",{"key":19,"text":20,"correct":21},"C","选择合适的正交表",true,{"key":23,"text":24,"correct":14},"D","编制试验方案","",{"id":6,"name":27,"category":28,"favorite":29},"质量、投资、进度控制","建筑工程",0]