[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-931492":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},931492,603,1,"单选题","某分部工程有甲、乙、丙三个施工过程，流水节拍分别为4.6.2，施工段数为6，且甲乙间工艺间歇为1，乙丙间提前插入时间为2，现组织等步距的成倍节拍流水施工，则计算工期为( )天。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","23",false,{"key":16,"text":17,"correct":14},"B","22",{"key":19,"text":20,"correct":21},"C","21",true,{"key":23,"text":24,"correct":14},"D","19","",{"id":6,"name":27,"category":28,"favorite":29},"质量、投资、进度控制","建筑工程",0]