[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-931460":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},931460,603,2,"多选题","在评价质量管理体系时，应对每一个被评价过程提出的基本问题有( )。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","过程是否已被识别并确定相互关系",true,{"key":16,"text":17,"correct":14},"B","职责是否已被分配",{"key":19,"text":20,"correct":14},"C","程序是否得到实施和保持",{"key":22,"text":23,"correct":14},"D","在实现所要求的结果方面，过程是否有效",{"key":25,"text":26,"correct":27},"E","方针目标是否已被确认",false,"ABCD","",{"id":6,"name":31,"category":32,"favorite":33},"质量、投资、进度控制","建筑工程",0]