[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-931423":3},{"question":4,"library":22},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":13},931423,603,1,"单选题","在搭接网络计划中，工作i与工作j存在搭接关系，工作i的最迟完成时间等于( )。",[11,15,18,20],{"key":12,"text":13,"correct":14},"A","",false,{"key":16,"text":13,"correct":17},"B",true,{"key":19,"text":13,"correct":14},"C",{"key":21,"text":13,"correct":14},"D",{"id":6,"name":23,"category":24,"favorite":25},"质量、投资、进度控制","建筑工程",0]