[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-931364":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":9},931364,603,2,"多选题","",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","工作B的总时差为3天",true,{"key":16,"text":17,"correct":14},"B","工作C的总时差为2天",{"key":19,"text":20,"correct":14},"C","工作D为关键工作",{"key":22,"text":23,"correct":14},"D","工作E的总时差为3天",{"key":25,"text":26,"correct":27},"E","工作G的自由时差为2天",false,"ABCD",{"id":6,"name":30,"category":31,"favorite":32},"质量、投资、进度控制","建筑工程",0]