[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-931355":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":9},931355,603,2,"多选题","",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","工作m和n间的时间间隔",true,{"key":16,"text":17,"correct":14},"B","工作n的完成时间",{"key":19,"text":20,"correct":21},"C","工作m的开始时间",false,{"key":23,"text":24,"correct":14},"D","工作m和n搭接关系的时距",{"key":26,"text":27,"correct":21},"E","工作m的持续时间","ABD",{"id":6,"name":30,"category":31,"favorite":32},"质量、投资、进度控制","建筑工程",0]