[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-931350":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},931350,603,2,"多选题","具有6σ特色的质量改进模式(DMAI C)分为以下( )阶段实施。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","界定、测量",true,{"key":16,"text":17,"correct":14},"B","分析、改进",{"key":19,"text":20,"correct":14},"C","控制",{"key":22,"text":23,"correct":24},"D","设计",false,{"key":26,"text":27,"correct":24},"E","验证","ABC","",{"id":6,"name":31,"category":32,"favorite":33},"质量、投资、进度控制","建筑工程",0]