[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-931338":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},931338,603,1,"单选题","单代号搭接网络的计算工期由( )决定。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","终点虚拟节点的最早完成时间；",false,{"key":16,"text":17,"correct":14},"B","最后开始的工作的最早完成时间；",{"key":19,"text":20,"correct":14},"C","最后一项工作的持续时间；",{"key":22,"text":23,"correct":24},"D","可能由中间某个工作的最早完成时间。",true,"",{"id":6,"name":27,"category":28,"favorite":29},"质量、投资、进度控制","建筑工程",0]