[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-931321":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},931321,603,2,"多选题","某设备工程主要设备由业主负责采购，在设备采购进度管理中，设备监理工程师的工作内容包括( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","协助业主收集主要设备供应单位的信息",true,{"key":16,"text":17,"correct":18},"B","确定主要设备的供货时间",false,{"key":20,"text":21,"correct":14},"C","编制设备采购的监理工作进度计划",{"key":23,"text":24,"correct":14},"D","协助业主编制设备采购招标文件",{"key":26,"text":27,"correct":18},"E","确定设备供应商名单","ACD","",{"id":6,"name":31,"category":32,"favorite":33},"质量、投资、进度控制","建筑工程",0]