[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-931240":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},931240,603,2,"多选题","设备采购是直接影响设备质量的关键环节，属于签订设备采购合同前的工作程序有( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","编制采购计划",true,{"key":16,"text":17,"correct":14},"B","确定合格供货厂商",{"key":19,"text":20,"correct":21},"C","调整采购进度计划",false,{"key":23,"text":24,"correct":14},"D","编制询价文件及报价评审",{"key":26,"text":27,"correct":21},"E","设备及散材的检验、监制","ABD","",{"id":6,"name":31,"category":32,"favorite":33},"质量、投资、进度控制","建筑工程",0]