[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-931234":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},931234,603,1,"单选题","某道路工程在进行基层和面层施工时，为了给面层铺设提供工作面和工作条件，需待基层铺设一定时间后才能进行面层摊铺，这种时间间隔是( )时距。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","STS",true,{"key":16,"text":17,"correct":18},"B","FTF",false,{"key":20,"text":21,"correct":18},"C","STF",{"key":23,"text":24,"correct":18},"D","FTS","",{"id":6,"name":27,"category":28,"favorite":29},"质量、投资、进度控制","建筑工程",0]