[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-931232":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},931232,603,1,"单选题","与横道图相比，网络计划的优点是能够( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","明确表达各项工作之间的逻辑关系",true,{"key":16,"text":17,"correct":18},"B","直观表达工程进度计划的计算工期",false,{"key":20,"text":21,"correct":18},"C","明确表达各项工作之间的搭接时间",{"key":23,"text":24,"correct":18},"D","直观表达各项工作的持续时间","",{"id":6,"name":27,"category":28,"favorite":29},"质量、投资、进度控制","建筑工程",0]