[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-931226":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},931226,603,2,"多选题","下列关于增量净现值的说法，正确的有( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","可以用于寿命期不等的互斥方案比选",false,{"key":16,"text":17,"correct":18},"B","可以用于寿命期相等的互斥方案比选",true,{"key":20,"text":21,"correct":18},"C","不能直接用于独立方案选择",{"key":23,"text":24,"correct":14},"D","若两方案之间的增量净现值大于零，则表明投资大的项目肯定可行",{"key":26,"text":27,"correct":18},"E","若两方案之间的增量净现值大于零，则表明投资大的项目优于投资小的项目","BCE","",{"id":6,"name":31,"category":32,"favorite":33},"质量、投资、进度控制","建筑工程",0]