[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-931178":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":27,"analysis":28},931178,603,2,"多选题","",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","工作C为关键工作",true,{"key":16,"text":17,"correct":14},"B","工作A为非关键工作",{"key":19,"text":20,"correct":21},"C","工作D总时差为2天",false,{"key":23,"text":24,"correct":14},"D","工作E自由时差为1天",{"key":26,"text":9,"correct":21},"E","ABD","关键路线BCDI。",{"id":6,"name":30,"category":31,"favorite":32},"质量、投资、进度控制","建筑工程",0]