[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-931144":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},931144,603,2,"多选题","因果图用于表达因果关系，通过识别症状、( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","设计新过程",false,{"key":16,"text":17,"correct":18},"B","寻找措施",true,{"key":20,"text":21,"correct":18},"C","促进问题解决",{"key":23,"text":24,"correct":18},"D","分析原因",{"key":26,"text":27,"correct":14},"E","评价过程","BCD","",{"id":6,"name":31,"category":32,"favorite":33},"质量、投资、进度控制","建筑工程",0]