[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-931112":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},931112,603,2,"多选题","可行性研究报告的内容包括( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","市场调查与市场预测",true,{"key":16,"text":17,"correct":14},"B","建设规模与产品方案",{"key":19,"text":20,"correct":21},"C","设计概算",false,{"key":23,"text":24,"correct":14},"D","节能措施",{"key":26,"text":27,"correct":14},"E","节水措施","ABDE","",{"id":6,"name":31,"category":32,"favorite":33},"质量、投资、进度控制","建筑工程",0]