[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-931110":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},931110,603,2,"多选题","在网络计划中，“工期一费用优化”的目的在于寻求( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","工期规定条件下的最低费用安排",true,{"key":16,"text":17,"correct":18},"B","工期最短的最低费用安排",false,{"key":20,"text":21,"correct":18},"C","直接费用最低的工期安排",{"key":23,"text":24,"correct":18},"D","间接费用最低的工期安排",{"key":26,"text":27,"correct":14},"E","总费用最低的工期安排","AE","",{"id":6,"name":31,"category":32,"favorite":33},"质量、投资、进度控制","建筑工程",0]