[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-931104":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":9},931104,603,2,"多选题","",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","本工作已按计划完成",false,{"key":16,"text":17,"correct":18},"B","在第2月前半月内没有进行本工作",true,{"key":20,"text":21,"correct":18},"C","在第3月内本工作实际完成的任务量大于计划任务量",{"key":23,"text":24,"correct":14},"D","到第4月末，本工作拖欠5％的任务量",{"key":26,"text":27,"correct":18},"E","在第5月内，本工作拖欠10％的任务量","BCE",{"id":6,"name":30,"category":31,"favorite":32},"质量、投资、进度控制","建筑工程",0]