[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-931086":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},931086,603,1,"单选题","在对投资项目进行不确定性分析时，通过( )来分析测算项目主要因素发生变化时对经济评价指标的影响及影响程度。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","盈亏平衡分析",false,{"key":16,"text":17,"correct":14},"B","可行性分析",{"key":19,"text":20,"correct":14},"C","概率分析",{"key":22,"text":23,"correct":24},"D","敏感性分析",true,"",{"id":6,"name":27,"category":28,"favorite":29},"质量、投资、进度控制","建筑工程",0]