[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-931084":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},931084,603,1,"单选题","在设备工程投资中，设备购置费由( )构成。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","设备原价、采购与装卸费用",false,{"key":16,"text":17,"correct":18},"B","设备原价、采购与储运费用",true,{"key":20,"text":21,"correct":14},"C","设备制造费用、储运与安装费用",{"key":23,"text":24,"correct":14},"D","设备制造费用、采购与保管费用","",{"id":6,"name":27,"category":28,"favorite":29},"质量、投资、进度控制","建筑工程",0]